Supply And Work Of Construction Of Line For Issuing Connections To Consumers On Semi Turn Key Basis Under The Deposit Scheme Under Electricity Urban Distribution Division Mayohall And Bamrauli.- 1 SUPPLY OF MATERIALS 2 LT Arm 18 3 Nut Bolt With Washar 4 Al. Paint 5 Red oxide Paint 6 Barbed Wire 7 Clamp With Nut Bolts For PCC pole 8 Clamp With Nut Bolts For ST pole 9 GI Pipe 6 Dia 10 Danger Board With Clamp 11 11 KV XLPE Cable 3x70 sqmm 12 Outdoor Jointing Kit 11 KV XLPE Cable 3x70 sqmm 13 Indoor Jointing Kit 11 KV XLPE Cable 3x70 sqmm 14 Top Channel 100x50x2240 mm 15 Pipe Earthing 16 GI Strip 25x6 17 Drroper Channel 100x50x2200 mm 18 Stone Pad 300x300x75 MM 19 U Bolt With Nut 20 Service Clamp For ST Pole 21 Cross Brasing Angal 22 Substation Base Channel 23 Erection of 11 KV Line, 11 KV VCB, & Laying of 11 KV XLPE Cable, Installation of 25 KVA/63 KVA/100 KVA/250KVA/400 KVA for giving connection to consumer under EUDC 2nd Prayaraj in Deposit Scheme including loading, unloading & safe carriage of all materials from Store centre Naini to working site and vice-versa in the direct supervision of Executive Engineer, E.U.D.D. Bamrauli & Mayohall Prayagraj. 24 Erection of Single support 9 MTR PCC pole complete with its all accessories at the requirement of site condition for cable hanging (service clamp with nut bolt will be provided by the contractor) 25 Erection of Single support11 MTR longST pole complete with its all accessories at the requirement of site condition for cable hanging (service clamp with nut bolt will be provided by the contractor) 26 Cartage, Erection, grouting, Plinthing, earthing & painting of 11 mtr long ST Pole/9 MTR Long PCC pole sub station Type D/P for Mounting of CVT outdoor meteringwith all accessories like MS cross bracing, channel etc. grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plinth in ration 1:2:4 with 12 mm thickness curing of plinth should be done properly as per RESPO and Electrical Safety rule (All decentralized material like Holding clamp, service clamp, Top channel, droper channel, MS cross bracing angle, GI Pipe, nut bolt ,S/S base channel, number plate, barbed wire, paint and materialrelated civil work will be arranged by the contractor at his own cost) 27 Erection, grouting, plinthing, earthing & painting of 11 mtr long double pole structure D/P for11KV XLPE cable outdoor hostingwith all accessories like MS cross bracing, channel etc. grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plinth in ration 1:2:4 with 12 mm thickness curing of plinth should be done properly as per Resspo and Electrical Safety rule (All decentralizedmaterial like Holding clamp, service clamp, nut bolt, channel, MS cross bracing and, GI pipe ,number plate, danger board, barbed wire, paintand materialrelated civil work will be arranged by the contractor at his own cost) 28 Cartage, Erection, grouting, plinthing,& painting of 11 mtr long sub station type D/P forinstallation ofTF with all accessories like MS cross bracing, channel etc. grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement sand & bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plinth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per RESPO and Electrical Safety rule (All decentralizedmaterial like Holding clamp, U bolt with Nut, droper channel, stone pad, top channel, GI strip, service clamp, MS cross bracing angle, GI pipe, nut bolt ,number plate, barbed wire, paint and materialrelated civil work will be arranged by the contractor at his own cost) 29 Grouting & plinthing of ST/PCC pole 8.5/9/11 meter, Grouting in ratio 1:4:8, Cement, Stone Grit & Coarse Sand (All grouting material provided by the contractor) 30 9 Mtr. Long PCC POLE 31 11 Mtr. Long S.T.P. 32 Painting of PCC pole 9 Mtr. with the help of one coated red oxide & aluminum paint. 33 Hanging of XLPE 3x70/120 sq mm cable at existing / Newly Constructed 9/11 Mtr. Long PCC/STP/Rail pole with the help of service clamp and stay wire. (Stay wire provided by department & 11KV XLPE Cable provided by contractor at his own cost) 34 Cartage & Laying of single 11 KV 3x70 /120 sq mm XLPE cable by machine HDD (Horizontal Directional Drilling) method/ manual drilling method. The cable shall be laid at the depth of 1050 mm from the surface of road. The cable shall be laid strictly in compliance to RESSPO Norms (.Except 11 KV XLPE cable all material Related this work will be arranged by the contractor at his own cost) 35 Erection & grouting of stay Rod with Cement, Sand and Bricks ballast in ratio 1:4:8 and fastening the stay wire with pole and stay rod nuzzling. (All Deceterlised Materials provided by Contractorat his own cost) 36 Fixing H.S. type 11 KV O/D, I/D cable joints & end terminations(All material realated this work will be arranged by the contractor at his own cost) 37 11 kv 3x70/120 Sqmm outdoor box 38 11 kv 3x70/120 Sqmm indoor box 39 Hoisting of 11 KV 11 KV 3X70/120 sq mm XLPE cable by providing GI pipe of size 6” dia 3 M long on single pole support including its jumpering, complete with clamps, nut & bolts. (GI pipe, clamp with nuts & bolt provided by contractor) 40 Installation of Danger board with clamp and nut bolt, Number plate with clamp and nut bolt & Barbed wire at each pole (all required material will be provided by the contractor) 41 Installation & commissioning of T/F 25/250 KVA on DP along with HT/LT connections including DO, 11 KV TPMO set Complete in all respect at DP. (All materials like, Clamp, Nuts & Bolts etc. will be provided by the contractor at his own cost. Only T/F will be provided by the Department.) 42 Earthing of TF,metering cubical completeby 40 mm dia 2.5 Mtr. Long G.I. pipe electrodes by digging 3 Mtr. deep pits , making alternate layer of salt & charcoalandconnecting with GI Strip of size 25x6 mm with clamps, Testing of earthing as pr rule ofter complete this work result will be satisfactory then connectall connection properly (All material related this work will be arranged by the contractor at his own cost) NOTE - Attached technicalspecification & photo 43 Earthing of L.T. Cubical box/Distribution Box/ST/PCC POLE/Transformer earthingby M.S. earthling rod and connecting it with G.I. Strips of size 35x6 mm with clamp for neutral & L.T. cubical box body.(Only M.S. Earthing rod will be provided by the Department and all other required materials will be provided by the contractor at his own cost.) 44 Laying of 1x630/ 3.5*240 sqmm L.T. cable from T/F to L.T. Cubicle Box and from LT Cubical Box to LT Line with proper lugging and tagging with the help of copper Z/L Clamp. (Only L.T. Cable will be provided by the Department and all other required materials like as Alu. Lug, Z/L Clamps etc. will be arranged by the contractor at his own cost as per site requirement.) 45 Cartage, Errection, Commissioning and grouting of 11 KV HT Metering cubical and 11 KV CVT complete with making foundation for cubical, earthing & its proper connection. (Allmaterial except 11 KV CVT UNIT & 11 KV HT Metering cubical will be arranged by the contractor at his own cost) 46 Errection & Commissioning of 11 KV VCB 400A/200A/100A/5A, 24V in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. Fixing of 11 KV switchgears rag bolt, mounting and all connection properly.