| 1 | SCHEDULE \"A\" CONSULTANCY SERVICES |
| 2 | Topographical survey for site by picking all natural and man made feature from the site,prepatation of plans (maps) showing all permanent features, including buildings, large trees, pucca& Kutcha nullas, nearby roads/approaches, railway track, culverts, overhead transmission & communication lines, ridge, boundary wall, fencing, demarcation line & leavels @ 5m grid in both directions, contours at iterval of 0.1m and supply soft copies in CD/DVD and hard copies in 5 sets. Level Sheet superimposed in Site Plan.Note :- The Location of site plan shall be provided y GE(P) Bathinda and calculations of earthwork quantites on the basis of proposed level has given by Engineer-in-Charge. |
| 3 | Soil Investigation is to be carried out as per IS-1892 Bore hole dia shall be 150mm. Depth of bore shall be decided as per the soil condition and may be taken 15m or N value reaches 50, whichever is earlier. |
| 4 | Note:Under this test following results also be provided: (a)Grain size analysis, identification & classification of soil.(b)Unit weight (bulk density), natural moisture content, liquid limit, plastic limit. Shrinkage limit, plasticity index, specific gravity.(c)Dry density, degree of saturation of soil.(d)Free swelling index & swelling pressure if expansive soil is encountered.(e) Shear parameters (C- analysis).(f) Consolidation test & permeability test.(g)Depth of water table below ground level.(h)Presence of loose soil. If any and its depth.(j) If weak soil with lesser N value as specification in table-1 of IS 1893 (Part-) 2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial action to be adopted shall be specified.(k)SPT test shall be done at 1.0m interval.(l) Recommendation for filling under floor and filling under protection including plinth protection.(m) For open foundation, calculation of net SBC at 1.5m, 2m, 3.0m from shear as well as settlement criteria. SBC values shall be calculated based on C- analysis as well as SPT value. For calculation formula given in IS 6403 shall be used.(n)Recommendation regarding type of foundation to be adopted & net SBC/Pile capacity to be adopted. Also, recommendation shall be given regarding stability of soil and soil stabilization required, if any.(o)Borehole position duly marked on plan and their distance from adjacent prominent reference points. Plan size of bldgs shall also be marked in the plan. This plan shall be signed by GE, AGE & Soil consultant.(p) Bore log details shall be as per Appx \"D\" of IS 1892 Nvalues depth wise shall also be shown in bore log details. Bore log details shall be signed by GE, AGE & soil consultant.(q)Colour photograph on A4 size photo paper of the site with the locations of the boreholes duly flagged should be submitted. The photographs should also preferably include any reference structure and the identification of the same be marked.(r)Undisturbed soil sample shall be collected at 1.5m interval and at change of strata. |
| 5 | Bore hole dia shall be 150mm, Depth of bore shall be decided as per the soil condition and may be taken 25m or N value reaches 50, whichever is earlier for OHR. |
| 6 | Crushing strength, degree of weathering (CR value) and RQD of rock samples |
| 7 | Chemical analysis of soil and recommendation and type of cement to be used for RCC foundation |
| 8 | Chemical analysis of ground water (water to obtained from bottom of bore hole) |
| 9 | K-value of soil 0.5m depth required in case of swimming pool/UG water retaining structure. |
| 10 | Plate load test for ascertaining SBC at the proposed level of foundation specified for OHT only. |
| 11 | Modulus of subgrade reaction. |
| 12 | As per IS-1892 clause 3.6.5.3, drilling for 3.0m depth inside the rock is essential to ensure that boulders or layers of cemented soil are not mistaken for rock. |
| 13 | Note :- A CD containing video evidence of the depth of each borehole and machinery deployed at site location will be provided which is inclusive in above quoated rate |