Name of Work: : Operation and Maintenance of Electric Furnaces at Garia AdiMahasmashan.
Sl. No.
Item Description
1
Engagement of two (02) nos. ElectricalFurnace Operators ( Highly Skilled Category)in 3 shift during 24 hrs. having ability of fault-finding offurnace, minor repairing connected with the electrical and mechanical works including experience of trolley movement system.(As per Mpl. Secretary\"s CircularNo. 04 of 2024-25 dt.21.06.2024).
2
Engagement of one (01) nos. ElectricalFurnace Operator ( Skilled Category)in 3 shift during 24 hrs. having ability of fault-finding of furnace, minor repairing connected with theelectrical and mechanical works includingexperience of trolley movement system.(As per MplSecretary Circular 04 of 2024-25 dt 21.06.2024
3
Proportionate Casual Leave imposed as per Mpl. Secretary\"s Circular No.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7 dt.14.08.2012. Adding the totalamount of sl no 1&2 and 4.53% of it.
4
Engagement of a Reliever for operators ( Highly Skilled category) in the weekly off-Days (As per Mpl. Secretary\"s Circular No. 04 of 2024-25dt. 21.06.2024).Total nos. of off-days for an operator in a year = 52 nos. Total off -days for two (02) nos. operators= (52 X 2) nos. = 104 nos.Total working days for Relieve throughout year =104 Days[Rate Analysis for reliver wages: Total(A)= Rs. 15224.0010% agency Charges of Rs. 15224.00 =1522.40Total wages(B) = Rs. 16746.40, Daily wages = Rs. 644.09
5
Engagement of a Reliever for operators (Skilled category) in the weekly off-Days (As per Mpl. Secretary\"s Circular No. 04 of 2024-25dt. 21.06.2024).Total nos. of off-days for an operator in a year = 52 nos.Total off -days for three (01) nos. operators= (52 X 1) nos. = 52 nos.Total working days for Relieve throughout year =52 Days[Rate Analysis for reliver wages: Total(A)= Rs. 13841.0010% agency Charges of Rs. 13841.00 = 1384.10Total wages(B) = Rs. 15225.10, Daily wages = Rs. 585.58]
6
Labour chargesfor cleaning the inside of DuctPassage by opening inspection cover with VacuumCleaner and manually.
7
Labour chargesfor cleaning and checking themajor parts by opening the charging trolley
8
Labour chargesfor cleaning the Chain Sprocket byopening back portion of the front door and adjusting the counter balancing weight to make free movement of the door.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.