}

Tender For Supply, Installation, Testing & Commissioning Of Mgps Work At Sdh Bagidora, Dist. Banswara., 1 Sitc Of Mgps Pipe Of Medically Grade As Per Bsen-13348 With Third Party Certification From Lloyds/Tuv Degreased [Ie Free From Oil, Grease And Parti, banswara-Rajasthan

Government Departments has published Tender For Supply, Installation, Testing & Commissioning Of Mgps Work At Sdh Bagidora, Dist. Banswara., 1 Sitc Of Mgps Pipe Of Medically Grade As Per Bsen-13348 With Third Party Certification From Lloyds/Tuv Degreased [Ie Free From Oil, Grease And Parti. Submission Date for this Tender is 11-11-2024. Cutting Crimping and Punching Tools Tenders in banswara Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

45963225
Tender For Supply, Installation, Testing & Commissioning Of Mgps Work At Sdh Bagidora, Dist. Banswara., 1 Sitc Of Mgps Pipe Of Medically Grade As Per Bsen-13348 With Third Party Certification From Lloyds/Tuv Degreased [Ie Free From Oil, Grease And Parti
Open Tender
Indian
Rajasthan
Banswara
11-11-2024

Tender Documents

Tender Details

Tender For Supply, installation, testing & commissioning Of Mgps Work At Sdh Bagidora, Dist. Banswara., 1 SITC of MGPS pipe of medically grade as per BSEN-13348 with third party certification from Lloyds/TUV degreased [ie free from oil, grease and particulate matters) seamless copper pipe confirming to ASTM B88 and all copper joining done by brazing with AWSA5.8, classification BCuP-5 or BS 1845 following procedure in accordance with ASTM B828 after purging with nitrogen. All pipe cutting shall be carried out with a radial pipe cutter and copper pipe fittings shall comply with B4 alloy designation. Adequate support shall be provided while laying pipeline testing shall be done at 17 bar and after testing pipe shall be painted with two coat of enamel paint as per colour codification as per ISO 7396-Part-1 2016.Thisd partyTest reportshall be submitted. all as per approved by Engineer in charge. 2 SITC of non lubricated ball type nicel Coated Isolation Valve with adapter & PTFE Seat having quarter turn / Butterfly handle opening of following sizes suitable fo flow capacity of required LPMas per the size of valve at 4.7 bar with maximum allowable pressure of 30 bars and suitable for working temperature renging - 20 °C to 130 °C. Appropriate Test Certificate/ report of product/ accessories from OEM shall be submitted. All a per approved by Engineer in charge. For 12 MM OD pipe 3 For 15 MM OD pipe 4 For 22 MM OD pipe 5 For 28 MM OD pipe 6 For 42 MM OD pipe 7 For 54 MM OD pipe 8 SITC of Gas outlet point Oxy, (AR-4), (AR-7) and Vaccum (8.7 psig) for dispeensing medical pgases (oxygen/air/Vaccum) at point of use confirming to BSEN ISO 9 170-1:2008.. The gas outlet are quick connect type. it should have colour coding for dieffrentgas source and should accept only respective adapters as required.appropriat Test Certificate/ report of product/accessories from OEM shall be submitted. The Product should be CE Certified /CE marked. 9 SITC of BPC (back pressure compensated) flow meter with Humidifire made of nickei plated body. Double jacketed with flow gradations CE Marked on it. Desired flow will be setteided through rotary knob. Flow range shuld be between 0 to 15 lpm & work should be executed as per direction of engineer in charg. Appreoprite Test Certificate / reportof product /accessories from OEM shall be submitted. The Product should be CE Certified/ CE Marked. 10 SITC of ward suction unit (Sution Controller and Collevtion Jar - 600 ml caapicity) with posibility to configure required capcity collection Jar and should meets the reuirements as per BSEN ISO 10079-3:2009. The unit must designed to operate with the vaccum line of MGPS. The collection jar must accumpained with Vaccum regulator suitable for 0-14.7 psig with flow rate 0-55 lmp (min)for operating tempurature - 18 °C to 50 °C with ON/OFF facility. The collection Jar should be transparent, made of hogh quality polycarbonate that can be autoclaved at 121 °C for 20 minuts for reuse and provided with auto stop to avoid over spill and contamination of the suction source when the jar collection reached optimized level. The completer unit supplied with filter to protect the source and pipe line from baceterial contamination. Appropriate Test Certificate / report of product/ accessories from OEM shall be submitted . The Product shpuld be CE Certificate / CE marked 11 Suction troly 12 SITC of Valve box made of CRCA sheet duly powder coated with transparent window which is installed in the MGPS for oxygen and vaccum line and should comply with BSEN ISO 5211:2001 complete with ball type valves and gauses as required for oxygen compressed air and vaccum line. Appropriate Test Certificate / report of product/ accessories from OEM shall be submitted . The Product shpuld be CE Certificate / CE markedFor Three gas 13 For Four gas 14 SITC of microprocessor based auto alarm system (digital type) suitable for medical gas service provided with audible and visual alarm for MGPS Zoning. It should monitors the current status of oxygen /compressed air pressure in distribution pipeline of central medical supply system and trigger the alarm to alert. The system should comply BSEN IS0: 73 96- 1 :2007For Three Gas Services 15 For Four Gas Services 16 SITC of Color Coded high Pressure RubberTube for Positive Pressure Gases / vacuum. Appropriate Test Certificate/report o product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge. 17 SITC of Bed Head Panel of 900 -1500 MM long made out from high strength extruded aluminium with powder coating with at least 4 nos 6/16 Amp switch socket and provision for required number of gas outlet points as suggested by the client.Appropriate Test Certificate/report o product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge. 18 Providing and fixing of Rail clamp for mountin ward vaccum unit on bed head panel com Plete as required 19 P&F of Bed Panel accessories like Monitor Tray, Utility Basket, Vacuum Slider, Infusion PumP Pole with IV hooks, with proper nut bolts and screw and with Proper finishing . Appropriate Test Certificate/report o product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge.Utility Basket 20 Vacuum Slider 21 Infusion Pump Pole 22 Moniter Tray 23 SITC of Automatic Gas Control Panel for Each oxygen/Nitrous 0xide - Control Panel .out made for M.S. duly Powder coated. Compact and fully automatic manifold control Panel cover made of M.S. duly power coated. Compact and ffully automatic manifold control system for Oxygen service. Easy to maintain and use. Designed with both safety and continuity of flow supply at a constant pressure via two banks of bottled gas cylinders with following status monitoring. A -Bank in use [Green Indicationi f - EmPW bank [Red Indication). Control Panel should have built in LED display to indicate Normal, High & Low line pressure. It.should have facility to test all above indicators working perfectly. the control panel should include pressure gauge to indicate the gas pressure of each header and pipe line distribution pressure. Capable to provide a distribution flow rate in excess of 1200 LPM. The control panel should incbrporate manual bypass system in case of failure of shifting mechanism. It should be of CE Certificate / CE marked. All as per approved engineer incharge. 24 SITC of Oxygen/Nitrous Oxide Manifold System [8+8) with tail pipes NRV - manifold system comprise of bank of 8+8 cylinders (Bulk cylinder of D type) capacity manifold high pressure copper pipe of size 1/2 x14 swg (approx. 2.0320 mm) & high pressure fitting made of high tensile strength brass be used to connect the cylinders to the header assemblies with 16 no,s non return valves & 16 nos high pressure flexible tail pipe is made of copper pipe of 1/3x16 swg (approx. L.6256 mm) the manifold is hydraulically tested at 225kg/cm2 pressure it is also degreased and is to be offered duly wrapped in a polythene bag.Appropriate Test Certificate/report of product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge. 25 SITC of Emergency Oxygen/ Nitrous Oxide Manifold System (2+2)with tail pipes NRV and One DGSS Reglator of minimum 600 LPM capacity- manifold system comprise of bank of 2+2 cylinders (Bulk cylinder of D type ) cpacity manifold high pressure copper pipe of size1/2 ID X 14swg(approx 2.0320) & high pressure fitting made of high tensile stenth brass be used to connect the cylinders to the header assemblies with 4 no no non return valves & 4 nos high pressure flexible tail pipe is made of coper pipe of1/3 X 16 swg (approx 1.6256 mm) the manifold hydraulically tested at 225 kg/cm pressure it is also defreased and is to be Note : Providing if Cylinders is in the scope of Hospital / end Client. Approcriate Test Certificate / report of product /accessoriesfrom OEM shall be submitted . The Product should be CE Certified / CE marked. All as per approved engineer incharge. 26 SITCof Dessicsnt Air Dryer Output Capacityas below with Certified Microproccessor Controller with dewpoint based changeover option . Pre- filter rating 0.3 microns , Shuttle valve for Low Pressure drop. All Aluminiumresist oxidtion & scale formtion , Dewpoint better than -40 C including fixing on wall with required T & P mking connections etc complete in all respect.Appreoprite Test Certificate / reportof product /accessories from OEM shall be submitted. All as per approved engineer incharge. 27 SITC of Compressed Air System should consist of 1 nos. Air Compressors with Electric Motors, Electrical Switch Gear and Automatic Control SYstem of following Specifications:a)- Air Compressor L(0ne) Nos; Type Non-lubricated / Oil-free; MinimumCapacity 24.43 cfm (Poston Displacement) at 8.5 kg/cm2: Coolong air cooled.b) Drive- Electric Motor 1 [one) Nos; Capacity 75 HP; Speed L440 rpm (syn.); Drive Belt drive; Electricity supply 440 volt, 50 Hz. 3 Phasec) Starter Star/Delta Control & Switchgear with overload protection.including making PCC foundation and fixing withbolts , anti vibration pad and making connections complete as required. Appropriate Test Certificate/report of product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked.All as per approved engineer incharge. 28 SITC of vacuum Pump of Singlestage , capacity minimum 3141 LMP/ 111 CFM (Piston displacement ). The pump should be suited for maximum working pressure of 29 inch mercury (730 mm mercury) The pump should be fittedwith MS channel frame complete having vibration isolators with 1 nos. silencers at vacuum pump discharge end. The pump should be air coold. 1 set of isolation valve, on return and filter should be proviede with pumps. Drive assembly The electrical drive for vcuum should be consist of suitable TEFC induction motor operating at 1440 RPM and connectd through a V- belt The motor should be suited for 415 V+ 10% 50HZ . 3 phase SC supply. Capacity : 7.5 HPof a reputed make Vacuum Switch: Vacuum Switch of 0-760 mm range should provided, it should have both NO/NC contracts and suitable for 230 V 50 Hz.. AC supply. The vacuum switch should be housed in weatherproff casing with 3/8 BSP gas service connetion at the bottom of assembly. Vacuum filter :1 Nos vacuum with drain valve . This filter should be non-ferrous and inlie. Including making PCC foundation and fixing with bolts, anti vibration pad and making connection completer as required. Appropriate Test Certificate/report of product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge. 29 SITCof Compressed air filtration system and regulating systum :One set of 3 - stage filter The filters should be made of die cast aluminums housing with epoxy power paint on the outside and anodized surface treatment inside to prevent corrosion and ensure extra long life. The filters should have maximum contaminant removal efficiency with minimum pressure drop. Total 3-stage of filters should be used as mentioned below:-Stage 1 : coalescing filters for generalpurpose protection, removing liquid water and oil aerosol to 0.1 mg/cum. [0.1 pm) and particles down to 5 micron.Stage 2 : particular filter for dust protection, removing particles down to 1 micron. Stage 3 : high efficiency coalescing filters, removing liquid water and oilaerosol to 0.01 mg/cu.m. (0.01 pip) and particles down to 0.0L micron.Janatics regulator 1/2 or 3/4 to be installde for regulating the Output air pressure. . Appropriate Test Certificate/report of product/accessories from OEMshall be submitted. The Product shpuld be CE Certificate / CE marked. All as per approved engineer incharge. 30 SITC of Hot dipped galvanized ( inside and outside ) and powder coated . Air/ Vacuum receiver tank fas per lS:7938-L97 6 and upto date amendment) for compressed air system to dampen out pulsation and condense and trap the moisture in the compressed air and also to let oil and other impurities settle down before air passes into the piping with safety valve , Drain Valve , Pressure gauge and fusible plugs of 1000 litres capacity complete as required including fixing with bolts and making cinnections complete as required.Appropriat Test Certificate/report of product/accessories from OEMshall be submitted. 31 SITC of PLC Based Cascading Duplex electrical control panel suitable for 2 nos vacuum pump(1O /7.5 / 5 HP) and 2nos compressor [15 HP).Electrical Control panel with duplexing and cascading facility of air compressor- Zrios and vacuum pumps- 2 nos. powder quoted Electrical panel made out from CRCA sheet with independent starting units, with 250 Amp MCCB with spreader links of 250 Amp as incomer including rotary handle, Amp/Volt/Freq meter with required CTs , Indication lamp, push button, programmable logic controller, SMPS 1.5 A to 2.1A , Control relay,Contactors of required ratings ,timer,TP and SP MCBs as required , single phase preventer, over load protection relay, with 2 nos Star delta & 2 nos DOL starter including control wiring etc. complete with testing etc as required.(Brand of components used in Cascding panel should be as per Group I of Electrical BSR). 32 Providing & Fixing ISO certified company made on load change swutch, front handle operated, four polee 415 operatinghandle , source seprator and phase barrier included , conforming to IS/IEC 60947-3 : I999 including connections testing etc. as requoredAppropriate Test Certificate/report of product/accessories from OEMshall be submitted.

Key Value

Document Fees
INR 1500 /-
EMD
INR 256000.0 /-
Tender Value
INR 1.28 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail