Housing Urban and Rular Development Government Departments Closing in 0 days TDR #45957202

Tender For Rather Check Road Including Other Links

Issued by Government Departments · Anantnag, Jammu And Kashmir
Tender Value
16.06 Lakhs
Estimated cost
Bid Submission
02 Nov 2024
0 days left
EMD
32136
Bank guarantee accepted
Document Fee
800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Anantnag → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Rather Check Road Including Other Links- 1 Supply and laying of RCC spun pipes of different dia as per requirement at site, including earth cutting , laying of cushion over pipes and laying of pipes in proper grade complete as per direction of engineer incharge including cost of pipes and carriage from source to site all job complete : 300mm dia 2 Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). 3 Providing and layingwet mix macadam(Size range 53mm to 0.075mm) including premixing the material with water at OMC in mechanical mix plant, transporting the mixed material by mechanical transport from plant to site of work and laid with paver finisher compacting with vibratory road roller of 8-10 Ton capacity to achieve the required density as per specification and includingcost and carriage of the materials complete jobcomplete 4 Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom.On bituminous surface @ 0.25 Kg/sqm. 5 Providing and laying 50mm thick bituminous macadam using crushed stone aggegate of quaility size and grading as specified in CPWD specification and straight run bituminous of grade 80/100, 3.5% by weight of total mix including hot mixing of stone aggregate, Evotherm and bituminous hot mix plant transporting mixed material upto site of work and laid with paver finisher and compacting with road roller of 8 to 10 tonne capacity to achieve the density , including carriage all job complete 6 Providing and laying of 25mm thick Semi Dense asphaltic base course using mineral aggregate satisfying the gradation set out in specifications with 5% binder content by weight of total mix with the aid of hot mix plant and paver finisher including rolling wit road roller of 8 to 10 tonne capacity to achieve the required compaction and density25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix), lime filler @ 2% (percentage by weight of Aggregate) and EVotherm prepared in Drum Type Hot Mix Plant of 60-90 TPH Capacity 7 Providing and laying of 6mm thick seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all carriages complete job. 8 Supplying and filling of RBM/Khak bajree /quarrymuckin Berm/Shoulder Fillingincluding carriage spreading , consolidation loading , unloading all complete job 9 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : 10 P/L dry stone soling hand packed tightly including all crriages involved complete job 11 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size including all carriages 12 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size 13 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding Thermo-Mechanically Treated bars of grade Fe-500D or more all complete upto plinth level 14 Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns etc. for mass concrete 15 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Welded 16 The estimated rates are exclusive of 18% GST. However the GST @18% shall be paid on gross amount excluding labour cess proportionately.

BOQ

Name of Work: Rather Check road including other links
Sl. No. Item Description
1Supply and laying of RCC spun pipes of different dia as per requirement at site, including earth cutting , laying of cushion over pipes and laying of pipes in proper grade complete as per direction of engineer incharge including cost of pipes and carriage from source to site all job complete : 300mm dia
2Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means).
3Providing and layingwet mix macadam(Size range 53mm to 0.075mm) including premixing the material with water at OMC in mechanical mix plant, transporting the mixed material by mechanical transport from plant to site of work and laid with paver finisher compacting with vibratory road roller of 8-10 Ton capacity to achieve the required density as per specification and includingcost and carriage of the materials complete jobcomplete
4Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom.On bituminous surface @ 0.25 Kg/sqm.
5Providing and laying 50mm thick bituminous macadam using crushed stone aggegate of quaility size and grading as specified in CPWD specification and straight run bituminous of grade 80/100, 3.5% by weight of total mix including hot mixing of stone aggregate, Evotherm and bituminous hot mix plant transporting mixed material upto site of work and laid with paver finisher and compacting with road roller of 8 to 10 tonne capacity to achieve the density , including carriage all job complete
6Providing and laying of 25mm thick Semi Dense asphaltic base course using mineral aggregate satisfying the gradation set out in specifications with 5% binder content by weight of total mix with the aid of hot mix plant and paver finisher including rolling wit road roller of 8 to 10 tonne capacity to achieve the required compaction and density25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix), lime filler @ 2% (percentage by weight of Aggregate) and EVotherm prepared in Drum Type Hot Mix Plant of 60-90 TPH Capacity
7Providing and laying of 6mm thick seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all carriages complete job.
8Supplying and filling of RBM/Khak bajree /quarrymuckin Berm/Shoulder Fillingincluding carriage spreading , consolidation loading , unloading all complete job
9Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :
10P/L dry stone soling hand packed tightly including all crriages involved complete job
11Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size including all carriages
12Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size
13Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding Thermo-Mechanically Treated bars of grade Fe-500D or more all complete upto plinth level
14Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns etc. for mass concrete
15Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Welded
16The estimated rates are exclusive of 18% GST. However the GST @18% shall be paid on gross amount excluding labour cess proportionately.

AI Tender Summary

OUR REF NO 45957202
AUTHORITY Government Departments
TENDER VALUE 16.06 Lakhs
LAST DATE 02-11-2024
Authority
Authority Name Public Works Department
Work Description Tender For Rather Check Road Including Other Links- 1 Supply and laying of RCC spun pipes of different dia as per requirement at site, including earth cutting , laying of cushion over pipes and laying of pipes in proper grade complete as per direction of engineer incharge including cost of pipes and carriage from source to site all job complete : 300mm dia 2 Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). 3 Providing and layingwet mix macadam(Size range 53mm to 0.075mm) including premixing the material with water at OMC in mechanical mix plant, transporting the mixed material by mechanical transport from plant to site of work and laid with paver finisher compacting with vibratory road roller of 8-10 Ton capacity to achieve the required density as per specification and includingcost and carriage of the materials complete jobcomplete 4 Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom.On bituminous surface @ 0.25 Kg/sqm. 5 Providing and laying 50mm thick bituminous macadam using crushed stone aggegate of quaility size and grading as specified in CPWD specification and straight run bituminous of grade 80/100, 3.5% by weight of total mix including hot mixing of stone aggregate, Evotherm and bituminous hot mix plant transporting mixed material upto site of work and laid with paver finisher and compacting with road roller of 8 to 10 tonne capacity to achieve the density , including carriage all job complete 6 Providing and laying of 25mm thick Semi Dense asphaltic base course using mineral aggregate satisfying the gradation set out in specifications with 5% binder content by weight of total mix with the aid of hot mix plant and paver finisher including rolling wit road roller of 8 to 10 tonne capacity to achieve the required compaction and density25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix), lime filler @ 2% (percentage by weight of Aggregate) and EVotherm prepared in Drum Type Hot Mix Plant of 60-90 TPH Capacity 7 Providing and laying of 6mm thick seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all carriages complete job. 8 Supplying and filling of RBM/Khak bajree /quarrymuckin Berm/Shoulder Fillingincluding carriage spreading , consolidation loading , unloading all complete job 9 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : 10 P/L dry stone soling hand packed tightly including all crriages involved complete job 11 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size including all carriages 12 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size 13 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding Thermo-Mechanically Treated bars of grade Fe-500D or more all complete upto plinth level 14 Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns etc. for mass concrete 15 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Welded 16 The estimated rates are exclusive of 18% GST. However the GST @18% shall be paid on gross amount excluding labour cess proportionately.
Basic Detail
Tender No ENIT45ivisionVailoo24-25
Bidding Type Tender
Location
City Anantnag
State Jammu And Kashmir
Key Dates
Publish Date 28 Oct 2024
Submission Date 02 Nov 2024
Open Date 04 Nov 2024
Finance
Tender Value 16.06 Lakhs
Tender Fee 800
EMD 32136
Exemption Not Available
Document List
a06d2c95-dae5-4ac6-a9f9-ae2a697b5254.html
BOQ_792992.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 28, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 02, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 04, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a06d2c95-dae5-4ac6-a9f9-ae2a697b5254.html

xls

BOQ_792992.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender