| 1 | All materials having IS specification or approved quality should be used along the work. The work should be done as per the directions of department officials at site. All DBs and switchboards should be concealed. |
| 2 | APPENDIX-1 Chengannur Sree Mahadevar Devaswom in Aranmula group- M&M festival in 1200 ME.- Providinglight arrangements on hire basis to the information centre, Police Aid post, information center in Railway station and Arattukadavu etc.. |
| 3 | Hire and labour charges for providing 400 W metal halide lamp fitting for the first day. ie, on 15-11-2024 |
| 4 | Do…do…. For additional days from 16-11-2024 to 18-01-2025 |
| 5 | Hire and labour charges for providing 1×40 W patties type fluroscent fitting with all Accessories and tubes for the first day.ie, on 15-11-2024 |
| 6 | Do…. do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 7 | Hire and labour charges for providing 20 mm PVC pipe with accessories for the first day. ie, on 15-11-2024 |
| 8 | Do…do… For additional 64 days from 16-11-2024 to 18-01-2025 |
| 9 | Hire and labour charges for providing 2×3/20 SWG PVC insulated copper Wire clipped with 12 SWG GI wire and Giving connection for the first day. ie, on 15-11-2024 |
| 10 | Do…do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 11 | Hire and labour charges for providing 1200 mm sweep ceiling fan and giving connection for 1st day. ie, on 15-11-2024 |
| 12 | Do…do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 13 | Hire and labour charges providing 3 phase 4 way MCB DB with 40 A 4 pole isolator, 40A 4pole ELCB and giving connection for 1st day ie, on 15-11-2024 |
| 14 | Do…do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 15 | Hire and labour charges for providing main board consisting of 100 A TPN SDF with 100 A TPN bus bar chamber as incomer and 3 nos. of 63A TPN SDF as outgoing and giving connection for the first day. ie, on 15-11-2024 |
| 16 | Do…do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 17 | Hire and labour charges for providing Ordinary pipe earthling as required for the first day. ie, on 15-11-2024 |
| 18 | Do…do… for additional 64 days from 16-11-2024 to 18-01-2025 |
| 19 | APPENDIX-2Malayalapuzha Devaswom in Aranmula group- M&M festival in 1200 ME.-Providing temporary illumination and light arrangements to the temple structure and temple premises. |
| 20 | Hire and labour charges for providing 1x40W strip type fluorescent fittings with all accessories and tubes for the first day ie, on 15-11-2024 |
| 21 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 22 | Hire and labour charges for providing 400W metal halide lamp fittings for first day ie, on 15-11-2024 |
| 23 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 24 | Hire and labour charges for providing Serial set consisting of 22/24 Miniature type bulb with colour paper covering in position and giving connection etc for the first day ie, on 15-11-2024 |
| 25 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 26 | Hire and labour charges for providing 20mm PVC pipe with accessories for the first day ie, on 15-11-2024 |
| 27 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 28 | Hire and labour charges for providing 2×3/20 SWG PVC insulated copper Wire clipped with 12 SWG GI wire and Giving connection for the first day. ie, on 15-11-2024 |
| 29 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 30 | Hire and labour charge for providing 4x7/20 SWG PVC insulated copper wire clipped with 12 SWG GI wire and giving connection for first day ie, on 15-11-2024 |
| 31 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 32 | Hire and labour charges for providing 4x16 sq. mm AYFY cable conforming to IS 1554 part 11964 and giving connection for the first day ie, on 15-11-2024 |
| 33 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 34 | Hire and labour charges providing 3- phase 4-way MCB DB with 40 A 4 pole isolator, 40A 4pole ELCB and giving connection for first day ie, on 15-11-2024 |
| 35 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 36 | Hire and labour charges for providing main board consisting of 100A TPN SDF with 100 A TPN bus bar chamber as incomer and 3 nos of 63 A TPN SDF as outgoing and giving connection for the first day ie, on 15-11-2024 |
| 37 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 38 | Hire and labour charges for providing 100 A 4 pole on load changeover with 9 nos phase indication lamps on suitable size iron angle stand for the first day ie, on 15-11-2024 |
| 39 | Do….do for additional 64 days ie, from16-11-2024 to 18-01-2025 |
| 40 | Hire and labour charges for providing ordinary pipe earthing as required for the first day ie, on 15.11.2024 |
| 41 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 42 | Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for first day ie, on 15-11-2024 |
| 43 | Do…do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |
| 44 | Hire and labour charges for providing the mike set announcement using the following accessories and giving connection. For the first day. ie, on 16.11.2023(a)250 w power amplifier -2nos(b)125w power amplifier -1nos (c) Horn with including transformer -8nos (d)microphone -1 nos(e)24v/18A/25plate battery with lead wire and battery charger - 2 nos(f)3/20 VIR insulated copper wire-10coil (g)7/20 VIR insulated copper wire-2coil etc. complete. |
| 45 | Do….do for additional 64 days ie, from 16-11-2024 to 18-01-2025 |