}

Tender For Rate Contract For Leakage Removal In Pipeline Under Jen Baiji Ka Talab Under Jurisdiction Of City Sub Division Gandhi Maidan Jodhpur, jodhpur-Rajasthan

Public Health Engineering Department has published Tender For Rate Contract For Leakage Removal In Pipeline Under Jen Baiji Ka Talab Under Jurisdiction Of City Sub Division Gandhi Maidan Jodhpur. Submission Date for this Tender is 04-11-2024. Earth Moving Machinery Tenders in jodhpur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

45906958
Tender For Rate Contract For Leakage Removal In Pipeline Under Jen Baiji Ka Talab Under Jurisdiction Of City Sub Division Gandhi Maidan Jodhpur
Open Tender
Indian
Rajasthan
Jodhpur
04-11-2024

Tender Details

Rate Contract For Leakage Removal In Pipeline Under Jen Baiji Ka Talab Under Jurisdiction Of City Sub Division Gandhi Maidan Jodhpur- 1 BASED ON PHED O&M BSR 20201.1= Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe 2 50/63/75mm 3 80/90mm 4 100/110mm 5 125/140mm 6 150/160/180mm 7 200/225mm 8 250/280mm 9 300/315mm 10 350mm 11 400mm 12 450mm 13 500mm 14 Add on above item no. 1.1.1 for B.T. Road 15 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 16 Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 17 Add on above no. 1.1.1 item if depth of pipeline is above3.0 mtr. 18 1.2 = Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and thenrefilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil80mm 19 100mm 20 125mm 21 150mm 22 200mm 23 250mm 24 300mm 25 350mm 26 400mm 27 450 mm 28 500 mm 29 600mm 30 Add on above item no. 1.2.1 for B.T. Road 31 Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 32 Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 33 Add on above no. 1.2.1 item if depth of pipeline is above3.0 mtr. 34 1.3 = Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil50/63/75mm 35 80/90mm 36 100/110mm 37 125/140mm 38 150/160/180mm 39 200/225mm 40 250/280mm 41 300/315mm 42 350mm 43 400mm 44 450 mm 45 500 mm 46 600 mm 47 Add on above item no. 1.3.1 for B.T. Road 48 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 49 Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 50 Add on above no. 1.3.1 item if depth of pipeline is above3.0 mtr. 51 1.4 = Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil 52 100 mm 53 125 mm 54 150 mm 55 200 mm 56 250 mm 57 300 mm 58 350 mm 59 400 mm 60 450 mm 61 500 mm 62 600 mm 63 Add on above item no. 1.4.1 for B.T. Road 64 Add on above item no. 1.4.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 65 Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr 66 Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required 67 1.5 = Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil75 mm 68 90/80 mm 69 110/100 mm 70 140/125 mm 71 180/160/150 mm 72 225/200 mm 73 250 mm 74 300 mm 75 Add on above item no. 1.5.1 for B.T. Road 76 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 77 Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 78 Add on above item no. 1.5.1 if depth of pipe line is above3.0 mtr. 79 1.6 = Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil80 mm 80 100 mm 81 125 mm 82 150 mm 83 225/200 mm 84 250 mm 85 300 mm 86 Add on above item no. 1.6.1 for B.T. Road 87 Add on above item no. 1.6.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 88 Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 89 Add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr 90 1.7 =Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degreethen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour. 91 Add on above item no. 1.7 for B.T. Road 92 Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 93 Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 94 1.8 = Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil80 mm dia pipe to 100mm 95 125 mm dia pipe to 150mm 96 200 mm dia pipe to 250mm 97 300 mm dia pipe to 350mm 98 400 mm dia pipe 99 450 mm dia pipe 100 500 mm dia pipe 101 600 mm dia pipe 102 Add on above item no. 1.8.1 for B.T. Road 103 Add on above item no. 1.8.1 for CC Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 104 Add on above item no. 1.8.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 105 1.9 = Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil80 mm to 110 mm 106 125 mm to 165 mm 107 200 mm to 300 mm 108 Add on above item no. 1.9.1 for B.T. Road 109 Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 110 Add on above item no.1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 111 1.10 = Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil80 mm to 100 mm 112 125 mm to 150 mm 113 200 mm to 300 mm 114 350 mm to 450 mm 115 500 mm to 600 mm 116 Add on above item no.1.10.1 for B.T. Road 117 Add on above item no.1.10.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 118 Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 119 1.11 = Labour charges for removal of complaint of polluted water supply to the consumers Survey of the locality of polluted water supply for preliminary assesment of source of pollution during supply hours 120 1.12 = Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size In all type Soil 50 to 75 mm 121 80-110 mm 122 125 to 165 mm 123 200 to 300 mm 124 350 to 400 mm 125 Add on above item no.1.12.1 for B.T. Road 126 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 127 Add on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 128 1.13 = Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size In all type Soil80-100 mm 129 125 to 150 mm 130 200 to 300 mm 131 350 to 450 mm 132 Add on above item 1.13.1 for B.T. Road 133 Add on above item no. 1.13.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 134 Add on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 135 1.14 = Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 136 1.15 = Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 137 RUIPD 2017/ Hydraulic Excavator of 1 cum bucket including POL 138 PWD 2019/ G-5/ 5.1 Carriages of material, earth, sand, line murram, soil upto 08 Km lead including all loading and unloading charges

Key Value

Document Fees
INR 1000 /-
EMD
INR 12000.0 /-
Tender Value
INR 6 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail