Supply Ofms Back Clamp For 9 Mt Psc Pole As Per Tender Specification , Supply Of M.S Back Clamp For 9.0M Psc Pole (300 Kgs) , 0.6Kva Ups , M.S Back Clamp For 9.0M Psc Pole (300 Kgs) , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Ordinary Soil , Semi Rocky Soil , Heavy Rocky Soil Where Blasting/ Cheseling Required [Specific Approval Should Be Obtained From Concerned Ee] , Stay Pit , In Ordinary Soil [0.95 X 0.6 X 1.2M] , Semi Rocky Soil , Stay Pit In Heavy Rocky Soil Where Blasting/ Cheseling Reqiured [Specific Approval Should Be Obtained From Concerned Ee] , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Erection Of 7.5M / 8.0M Poles [Rcc / Psc] , Erection Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Stay Set , Erection Stay Set Complete , Stay Erection Without Rod And Pit , Replacement Of Stay Rod Only. (Including Stay Pit Excavation & Refilling & Erection) , Replacement Of Guy Shackle Only In Existing Stay , Erection Of Line Materials , Fixing Of Lt 1 Ph X Arm , Fixing Of Lt/Ht Ti Fitting , Fixing Of Lt 3 Ph X Arm , Fixing Of 3[1/2] V` X Arm , Fixing Of4[1/2] V` X Arm , Fixing Of 5 V X Arm , Fixing Of Tapping Channel / Guarding X Arm , Providing Of Line Spacers In Lt Lines 1 Phase , Providing Of Line Spacers In Lt Lines 3 Phase , Erection Of Ab Switch With Pt Insulator & Jumpering Complete , Erection Of Centre Rotating Switch Ab Switch Complete , Fixing Of Ht Pin Insulator / Strain Disc , 11 Kv Pin Insulator With Pin , 11 Kvstrain Disc / Polymer Disc With Hardware , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pinstrain Disc/Polymer Discwith Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Ofhg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangementdouble , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp/Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt[ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt[ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Ofcoconut Tree , Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof[ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantlingof 3[1/2] V` X Arm , Dismantlingof Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kvstrain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kvstrain Disc With Hardware , Dismantlingof Lt Pin Insulator With Pin , Dismantlingof Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductoracsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductoracsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter