| 1 | Labour |
| 2 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 3 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 4 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 5 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 6 | Providing Stay for LT poles incl. digging & back filling pit. |
| 7 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 8 | Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole). |
| 9 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 10 | Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. conveyance (except pole). |
| 11 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 12 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 13 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 14 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 15 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 16 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 17 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 18 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 19 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 20 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 21 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 22 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 23 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 24 | Erection of suspension clamp for LT ABC of any size |
| 25 | Providing Cable Tie |
| 26 | Installing One No. Insulation piercing connector of size Main:16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 27 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 28 | Installation of Insulation piercing connector for main to service line main :25-95 sqmm, Tap : 25-95 sqmm |
| 29 | Installation of Pre-insulated lugs for 16sqmm |
| 30 | Installation of Pre-insulated lugs for 70sqmm |
| 31 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 32 | Providing End Caps |
| 33 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 34 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |