}

Tender For Estimate For Improvement Of Infrastructures And Providing Raw Water Lifting System And Construction Of Boosting Station For Village Sandil Distt. Jind., narwana-Haryana

Government Departments has published Tender For Estimate For Improvement Of Infrastructures And Providing Raw Water Lifting System And Construction Of Boosting Station For Village Sandil Distt. Jind.. Submission Date for this Tender is 29-10-2024. Chemical Supply Tenders in narwana Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

45860461
Tender For Estimate For Improvement Of Infrastructures And Providing Raw Water Lifting System And Construction Of Boosting Station For Village Sandil Distt. Jind.
Open Tender
Indian
Haryana
Narwana
29-10-2024

Tender Documents

Tender Details

Tender For Estimate For Improvement Of Infrastructures And Providing Raw Water Lifting System And Construction Of Boosting Station For Village Sandil Distt. Jind.; 1 Recovery rate of old dismentaled bricks bats..... 2 Supply, erection, testing of reputed make LED light 150 watts with fitting, wiring and accessories complete in respects. 3 Supplying, erection, testing and commissioning of horizontal motor pumping set for Raw water having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. Discharge Capacity ( LPM) 2000 Power capacity ( BHP) 25 4 Recovery rate of old dismantled bricks size..... 5 Design construction, testing and commissioning of 0.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing,Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling.Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (BASED ON SCADA SYSTEM- 0.50 MLD) 6 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only) 7 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)Operation and maintenance 1st year Operation and maintenance after defect liability period 8 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 2nd year Operation and maintenance 9 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1)3rd year Operation and maintenance 10 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 4th year Operation and maintenance 11 Operation and Maintenance ofRaw water lifting system, rising main from water works to lifting system and 0.50 MLD capacity water treatment plantatwater worksas per schedule-IV for a period of 5 year after 12 month defect liability period after three months of trial run. (will be charged to the A/Mtc. Estimate) complete in all respects as per approved NIT. 1) 5th year Operation and maintenance

Key Value

Document Fees
INR 15000 /-
EMD
INR 461166.0 /-
Tender Value
INR 2.30 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail