Tender For Beautification And Development Work Of Pallavpuram Pond, Meerut Under Amrit 2.0 Scheme, 1 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. 2 DE- WATERING BY DIESEL PUMPING SET OF HP CAPACITY INCLUDING HITE CHARGE OF PUMPING SET AND ITS POL. LABOUR ALL T&P ETC COMPLETE IN ALL RESPECT 3 Earth work 4 Exacavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and land up to 30 M. including filling, watering and ramming excavated earth into the treanches or into the space betweenthe building and the sides of foundation trenches or into the plinth and removal and disposal of surplus eartt as directed by the Engineer-in-charge upto a distance of 30M. from the foundation trenches. 5 Cartage or earth required for filling 8.0 km….sheet enclosed…. 6 (a) Earth work in cutting or in embankment in ordinary soil excavation to be in theform of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remmingand dressing the surface to required levels and slopes and also including 1.50 M. liftand 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineerincharge.(Royality removed by Govt. ) for small works/ Abadi area. (where machine can not move ) 7 Providing, laying, spreading and compacting graded aggregate to Granular Sub-Base with close graded specification including premixing the material with water at OMC in mechanical mix plant carriage of mix material by tipper to site, laying in uniform on well prepared surface and compacting in vibratory roller to achive the desired density. complete as perclose 401 (495 Tonne) 8 Supply of 100mm thick Precast cement concerete I-Shape Interlocking paver blocks ISI markconfirming to IS: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of O.P. Cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 50Mpaand weight 5 kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, T & Petc required for proper completion of the work as directed by Engineer-in-charge. 9 BENCHES 10 P/F Flower Victorian benches area- 1.6xm 0.6 m height 720 mm , approx main frame cost iron seat rectangular pipe capacity 3 seater , Length 5 ft AE 1101 11 DUSTBIN 12 Providing & fixing dustbin including of allproper comp work 13 SOLAR LIGHT 14 Su-Kam LED Solar Light 15 Watt 35 W Pannel. 15 Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surfaceetc. all complete. 16 DRAIN, MAINHOLE 17 Exacavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and land up to 30 M. including filling, watering and ramming excavated earth into the treanches or into the space betweenthe building and the sides of foundation trenches or into the plinth and removal and disposal of surplus eartt as directed by the Engineer-in-charge upto a distance of 30M. from the foundation trenches. 18 Cement Concrete with 4 cm gauge approved stone grit, coarse sand &cement in the proportion of 8:4:1 including supply of allmaterials, labour, Tools & plants etc.required for prcper completion of the work. 19 R.C.C. work with cement approved coarse sand and 2 cm. (3/4) guage approved stone ballast in the proportion 1:1.5:3, (1cement :1.5coarse sand:3 aggregate) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works strength of the concrete shall not beless than M-20 20 RCC FOR SLAB 21 M.S. (Tor steel or plain ) in Plain work such as R.C.C. R.B. Work including bending for proper shape and including supply of steel as. S.I. No. 504) 22 M.S or iron work of small sizes and section such as holding down bolts ,hold fast ,tie roads grating etc wrought torequired from including supply of steel bolts,nuts , wastage etc and their fixing required for proper completion of the work in MSgrills / stair case railing / gates / trusher / racks etc. 23 HOLDING TANK 24 Exacavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and land up to 30 M. including filling, watering and ramming excavated earth into the treanches or into the space betweenthe building and the sides of foundation trenches or into the plinth and removal and disposal of surplus eartt as directed by the Engineer-in-charge upto a distance of 30M. from the foundation trenches. 25 Concrete with 4 cm gauge approved stone ballast, coarsesand & cement, in the proportion of 6:3:1inclucing supply of all materials, labour, tools & plants etc. required proper completion of the works. 26 R.C.C. work with cement approved coarse sand and 2 cm. (3/4) guage approved stone ballast in the proportion 1:1.5:3, (1cement :1.5coarse sand:3 aggregate) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works strength of the concrete shall not beless than M-20 27 TOP SLAB 28 M.S. (Tor steel or plain ) in Plain work such as R.C.C. R.B. Work including bending for proper shape and including supply of steel as. S.I. No. 504) 29 M.S or iron work of small sizes and section such as holding down bolts ,hold fast ,tie roads grating etc wrought torequired from including supply of steel bolts,nuts , wastage etc and their fixing required for proper completion of the work in MSgrills / stair case railing / gates / trusher / racks etc. 30 LayingofHume pipe in posilion including Iabour and T&pelc. required fqr proper complelion of ihe work 31 Fixed type aerator for pond aeration. ( 1.5 kw Aquaculture roots oxygen blower pond aeration)