Boards / Undertakings / PSU has published Tender For Dust Suppression And Water Systems Package For Lara Stpp Stage Ii 2X800 Mw Chhattisgarh. Submission Date for this Tender is 07-11-2024. Feeder Pillar Tenders in Raigarh Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

45785652
Tender For Dust Suppression And Water Systems Package For Lara Stpp Stage Ii 2X800 Mw Chhattisgarh
Open Tender
Indian
Chhattisgarh
Raigarh
07-11-2024

Tender Documents

Tender Details

Dust Suppression And Water Systems Package For Lara Stpp Stage Ii 2X800 Mw Chhattisgarh , 1.1- Design, Engineering Including Basic Engineering, Detailed Engineering, Preparation And Submission Of Engineering & Civil Assignment Drawings/ Calculations/ Datasheets/ Quality Assurance Documents/ Field Quality Plans, As Built Drawings, Commissioning Procedures, Operation & Maintenance Manuals, Performance Guarantee Test Procedures And Obtaining Approval From Customer / Customer’S Consultant / Bhel. , 2.1- Complete Potable Water System From Pump Houseconsisting Of Pumps With Drive Motors (1W+1S), Duplex Strainers, Re-Circulation Line, Motorized & Manual Isolation Valve At Terminal Points, Coupling, Drive Base Frames, Foundation Bolts, Grouting Material,Cables; Pipes, Pipe Fittings, Pipe Support, Other Accessories; Puddle Flanges, Valves , Fittings, Pvc Tanks - 250 Ltrs, Wrapping & Coating & Painting,Materials Catering To Entire Chp, Bmhp, Lhp & Ghp Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E , 2.2- Complete Service Water System From Pump House Consisting Of Pumps With Drive Motors (1W+1S), Duplex Strainers, Re-Circulation Line, Motorized & Manual Isolation Valve At Terminal Points, Coupling, Drive Base Frames, Foundation Bolts, Grouting Material,Cables; Pipes, Pipe Fittings, Pipe Support, Other Accessories; Puddle Flanges, Valves , Fittings,Quick Release Coupling, Flexible Hose With Hose Box/Hose Reeling Drum, Pvc Tanks - 250 Ltrs (As Applicable), Wrapping & Coating & Painting,Materials Catering To Entire Chp, Bmhp, Lhp & Ghp Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.3- Complete Dry Fog Dust Suppression System/ Ultra Fine (Cold Fog) Type Dust Suppression System From Pump House Consisting Of Water Pumps With Drive Motors (1W+1S) (Vfd As Applicable), Coupling, Base Frame, Foundation Bolts, Grouting Material,Screw Type Air Compressors With Drive Motor(1W+1S) As Applicable; Dry Fog/ Cold Fog Nozzle Assembly; Flow Activation Unit (Fau); Pressure Regulating Unit (Pru); Pressure Regulating Valve; Manifolds; Headers; Valves, Duplex Filters, Air And Water Line Filters, Water Pump Inlet & Outlet Gate, Valves; Air Receivers & Accessories; Pipes, Pipe Fittings & Pipe Support; Wrapping, Coating & Painting Materials, Starter Panels & Associated Electrics For Pumps & Compressors, Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.4- Complete Coal Stockyard Dust Suppression System (Plain Water Sprinkling Dust Suppression System)From Pump House Including Tapping Point With Qrc & Hose For Make-Up Water System For Stacker Cum Reclaimer Machine Mounted Ds System, Consisting Of Pumps With Drive Motors (1W+1S), Coupling, Base Frame, Foundation Bolts, Grouting Material, Sprinklers With Necessary Valves, Support Structures; All Valves ; Duplex Filters; Solenoid Valves And Solenoid Box Assemblies; Pipes, Pipe Fittings & Pipe Support; Wrapping, Coating & Painting Materials; Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.5- Complete Gypsum Stockyard Dust Suppression System (Plain Water Dust Suppression System With Fogging Nozzles) From Pump House Consisting Of Pumps With Drive Motors (1W+1S), Coupling, Base Frame, Foundation Bolts, Grouting Material, Sprinklers With Necessary Valves, Support Structures; All Valves ; Duplex Filters; Solenoid Valves And Solenoid Box Assemblies; Pipes, Pipe Fittings & Pipe Support; Wrapping, Coating & Painting Materials; Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.6- Complete Plain Water (Water Spray Shall Be Of Fogging Type) Dust Suppression System For Track Hopper Complex Periphery From Pump House Consisting Of Pumps With Drive Motors (1W+1S), Coupling, Base Frame, Foundation Bolts, Grouting Material, Water Spray Nozzles And Headers With Necessary Valves, Support Structures; All Valves ; Duplex Filters; Solenoid Valves And Solenoid Box Assemblies; Pipes, Pipe Fittings & Pipe Support; Wrapping, Coating & Painting Materials; Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.7- Complete Make Up Water System For Paddle Feeder Machine Mounted Dss In Trackhopper From Pump House Consisting Of Pumps With Drive Motors (1W+1S), Coupling, Base Frame, Foundation Bolts, Grouting Material,Piping & Accessories; Taps With Isolation Gate Valve; Inlet/Outlet/Drain Gate Valves, Float Valves & Non-Return Valves For Rcc Tanks; Inlet Solenoid & Manual Gate Valve/ Outlet Drain Valve, Level Switch For Rcc Storage Tank (Near Track Hopper); Duplex Filters; Ring Headers Inside Track Hopper, Quick Release Couplings, All Valves; Pipes, Pipe Fittings & Pipe Support; Wrapping, Coating & Painting Materials; Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.8- Complete Zero Liquid Discharge System For Achieving Effective Separation Of Plant Water From Storm Water, Plant Water Collection, Its Transfer, Treatment& Recycled/Reused Of Area Wash Water ( Plant Water) Generated From Entire Chp, Bmhp, Lhp & Ghpgallery , Tps & Buildings And Stockpiles Consisting Ofpumping System Leading Up To Coal Settling Pond Through Pipeline, Intermediate Effluenttransfer Pumps (1W + 1S) At Collection Pit (As Per Requirement) Pumping Up To Plant Water Drain Or Directly To Settling Pond, Valves, Fittings, Wrapping & Coating, Complete With Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.9- Design & Supply Of Complete Coal Slurry Settling Pond With Coagulant Aid Preparation And Dosing Facilities Consisting Of Tanks, Agitators, Pumps Complete With All Necessary Piping, Fittings, Sluice Gates & Baffle Plates And Other Accessories As Per System Requirement And With Associated Electricals And C&I. , 2.10- Decanted Water Transfer Pumps Complete With Drive Motors (1W+1S), Coupling, Base Frame, Foundation Bolts, Grouting Material, Connecting Piping Up To Rcc Tanks Of Pump House Along With Supports & Fittings, Level Switches, Gauges, Other Instruments, Etc. Water Pump Inlet & Outlet Gate, Valves, Pipes, Pipe Fittings & Pipe Support; Damper, Wrapping, Coating & Painting Materials, Complete With Its Accessories As Per Technical Enquiry Specification, With Electrical And C&I As Per Section-E. , 2.11- Portable Submersible Type Pumps Of Capacity 100 M3/Hr., 20 Mwc For Draining The Water From The Cssp, With Hose Pipes, Connectors Etc. , 2.12- Sump Pumps Complete Including Drive Motor, Discharge Piping, Level Switches, Valves, Accessories & Support Structure, Anchor Bolts, Gi Gratings Etc. Along With All Electrics And C&I For All Underground Portions Of Entire Chp, Bmhp, Lhp & Ghp (1W+1S At Each Facility) , 2.13- Complete Compressed Air System For Bobr Wagon Opening In Track Hopper Complex Consisting Of Oil Free Compressors (1W+1S), Air Receiver, Piping, Pipe Supports, Valves, Qrcs, Etc. , 3.1- Mechanical Mandatory Spares For Ds & Water System( As Per Annexure-7 Total For Mechanical Mandatory Spares For Ds & Water System------(A) ) Note1 : If Any Item Appearsin More Than One Place Same Shall Be Considered By The Bidder Irrespective Of Duplicity And Price Shall Be Considered Accordingly. Note2 : Bidder Shall Not Indicate Not Applicable Against Any Of The Spare (Except For Those Items For Which If Applicable Is Specified). In Case Of Not Applicability, Functionally Equivalent Spare To Be Mentioned With Price In The Relevant Price Schedules , 3.2- Electrical C& I Mandatory Spares For Ds & Water System ( As Per Annexure-7 Total For Electrical C&I Mandatory Spares For Ds & Water System ------(B) ) Note1 : If Any Item Appearsin More Than One Place Same Shall Be Considered By The Bidder Irrespective Of Duplicity And Price Shall Be Considered Accordingly. Note2 : Bidder Shall Not Indicate Not Applicable Against Any Of The Spare (Except For Those Items For Which If Applicable Is Specified). In Case Of Not Applicability, Functionally Equivalent Spare To Be Mentioned With Price In The Relevant Price Schedules , 4.1- Receipt, Unloading, Lifting/Shifting To Closed/Open Storage, Shifting To Erection Location, Storage, To Make Approach Road Wherever Required, Round The Clock Security For Both Open Storage Yard , Closed Storage Shed& Erected Material Till Completion Of Work, Erection, Alignment, Carrying Out Pre-Commissioning, Commissioning, Performance Guarantee Tests, Reliability Test Run, Obtaining Provisional Acceptance Certificate (Pac), Final Acceptance Certificate (Fac) And Handing Over Of The Equipment’S Which Is Under The Scope Supply And Service Of The Bidder. , 4.2- Construction Of Open Storage Yard And Closed Storage Shed: A. Construction Of Temporary Closed Covered Storage Shed For Storage & Preservation Of All Supplied Material For This Package (With Minimum Dimensions: Base Area Of 300 Sq. M. X Height 8M) With Concrete Flooring, Sloped Roof And Rolling Shutter. B. Open Storage Yard: Bidder Shall Also Consider Fencing Of Open Storage And Site Fabrication Area As And When Allocated At Site. C. Bidder To Build Its Own Site Office And Make Arrangement For Field Hostel For Its Staff. , 4.3- Final Painting At Site After Erection. , 5.1- Operation & Maintenance(As Defined In The Enquiry Specification) , 6.1- Training Module Comprising Following Aspect: - Product Design - Basic Design Features - Theory & Principle Of Operation - Latest Technological Trends - Testing Facilities - Operational Feedback - O&M History/Problems - Manufacturing Process - Operation & Maintenance Of Plant - Trouble Shooting And Fault Analysis - Familiarization Of Special Maintenance Techniques - Special Tool And Tackles Familiarization , 6.2- Safety Training: After The Design And Installation Are Developed And Supervised By Qualified Engineers Familiar With Recognized Safety Features And Requirements, The Next Priority Should Be Personnel Training. Operating And Maintenance Personnel And Their Supervisors Should Be Initially And Then Periodically Retrained In Safe Operating Procedures, Recognizable Hazards, Precautions And The Maintenance Of A Safe Work Place. Accordingly, Contractor To Provide The List Of Proper Tools And Tackles To Operate And Maintain The Machine In An Adequately Safe Condition. Employees Should Be Made Aware Of, And Forbidden To Enter, Hazardous Areas. The Training Proposal By Contractor Must Include Safety Training Module For Site Personnel. , 7.1- Total Freight/ Transportation Charges For Supply Of Plant & Equipment (Main Supply) , 7.2- Total Freight/ Transportation Charges For Supply Of Plant & Equipment (Mandatory Spares)

Key Value

Document Fees
Refer document
EMD
INR 4000000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail