Tender for the work of binding and opening of Ganjaga River Dengurpur Ghat Pantoon Pool, 1 Supply of wooden anchors made of Euquiliptis ballies of standard design of size 1.80x1.80x3.10 M with different size of ballies , Mallahi nails ang includings cost of cartage labour and T&P etc complete 2 Supply of 28 mm dia Garware Garphil Poly Propeliene ISI mark rope for anchoring of pantoons including cost of material its loading , unloadiing cartage upto Tela Ghat store 3 Supply of Nariyal rope 1.25 to 1.5 dia dry of approvedquality including cost of material carriage upto site etc complete 4 Supply of sand filled Plastic E. C. bags ( Volume 1 Cft ) including cost od sand bags labour , stiching with sutly complete and cartage upto the place of anchoring 5 Supply of bagai badh of good quality including cost of material carriage upto site etc complete 6 Supply of Mallahi nails of approved make and good quality 7 Supply of Equiliptis ballies of 10 cm diaincluding cost of material , loading, unloading andcarriage upto Telaghat Store 8 suplly of nut bolts of including cost of bitumen cost materail carriage upto site complete 300x30mm 9 suplly of nut bolts of including cost of bitumen cost materail carriage upto site complete 150x30mm 10 suplly of nut bolts of including cost of bitumen cost materail carriage upto site complete 300x16m 11 suplly of nut bolts of including cost of bitumen cost materail carriage upto site complete MS Wather 12 Supply of U Clamp for clamping of chequred platesincluding cost of material carriage upto site etc complete 13 Levelling & Dressing of road surfaceincluding cutting / filling including labour T& P etc complete work as per direction of E/I 14 Earth work in cutting or in embankment for cambering of approach link Road including filling pits and Kagar Cutting due to errosion of Ganga riverin proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I SI No. 251 15 Earth work in cutting or in embankment for cambering of approach link Road including filling pits and Kagar Cutting due to errosion of Ganga riverin proper longitudinal and side grade and slope as per level given at site including cost of labour T & P complete work as per direction of E/I SI No. 251 16 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of work RS joshi(5.2M) 17 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of work RS joist 18 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of workRalling post 19 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of worksal sleeper 20 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of worksal edging 21 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of workchequerd plate 22 Cartage & laying of following materials from Ghat store to bridge /pile/road site including loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of workOther material such as PP rope , Coir rope washer , U clamp wire rope , Nut Bolts and M S Plate 23 Carriage of Pontoons from the place of anchoring down steam of the bridge to the bridgealignment in water and fixing the same with other pontoons pair of bridge including all labour , T&P etc required for the proper completion of work as direction of E/I 24 Erection of Pile approach including carriage of decking material & ballies including pilling after making shoes complete ( Labour only) 25 Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with the help of 300x16 mm size nut bolts at 1.25 m c/c excluding cost of material 26 Painting of railing post including paint and labour etc As SI no 643 27 Fixing of 10 mm railing wire in three row through hole of railing post and holes of verticals ballies post and making wire stay of each row and tightening with the help of railing wire clamp as direction of E/I 28 Clamping of Chequered plate 29 Relaying of Chequered plates to proper alignment and level including shifting upto 30 m and all labour T&P complete work as per direction of E/I for proper completion of work 30 Maintenance of 2 row chaqured plate as 5 Month ( 31000 x 5 month = 155000) 31 Opening of U Clamp from chequered plate 32 Dismantalling of pontoons in pairs & proper anchoring at right side (Tela Side) including all labour T&P etc required for proper completion of work as per direction of E/I 33 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of work RS joist(5.2m) 34 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of work RS (10-00m) 35 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of work RS Rsiling post 36 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of worksal sleaper 37 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of worksal eding 38 Dismentalling of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to Tela ghat site store and alsoincluding loading , unloading, labour, T&P etc placing as per direction of E/I required for proper completion of workchequerd plate 39 Other material such as PP rope , Coir rope washer , U clamp wire rope , Nut Bolts and M S Plate 40 Maintenance and watch & ward of anchor pantoon in pair from the period of dismentalling to till the errction of pantoon bridge and keeping the pantoon in pairs in safe position during the floods and receding floods 41 Repair of old damaged pontoons with 6 mm thick M.S. Chequered plate including cost of electrode for electric welding. Including all material, labour T&P etc complete and its arrangment required for proper completion of the wrok as per direction of E/I. 42 Repair of spokes/ring of pontoon with 65x65x6 mm size angle cutting and welding Including cost of all material, labour T&P etc complete. 43 Cleaning and Painting of Pontoon withrolling of pontoon for painting by crane Including cost of all material, labour T&P etc complete. 44 Testing of Pontoon by pressure testing including cost of rent machine T&P & POL