Tender For Labour Rate Contract for the financial year 2024-25 for material handling job & Allied works such as loading, un-loading, carriage, verification and stackingofLine, sub-station Materials and Equipment viz. Power & Distribution Transformers, ACSR (Conductors of all sizes), Cables (of all sizes), ST Poles,PCC Poles, CR Panels, 11KV VCB’s , 1 Poles: Unloading of Steel Tubular/ Cement Poles by Manual/ Mechanical means, verification and stacking of same. 2 ST Poles 8 Mtr 3 ST Poles 9 Mtr 4 ST Poles 11 Mtr 5 ST Poles 13 Mtr 6 PCC Poles 8 Mtr 7 PCC Poles 9 Mtr 8 PCC Poles 11Mtr 9 Poles: Carriage of Steel Tubular/ Cement Poles by Manual/ Mechanical means, from sacking site and loading of same on trucks 10 ST Poles 8 Mtr 11 ST Poles 9 Mtr 12 ST Poles 11 Mtr 13 ST Poles 13 Mtr 14 PCC Poles 8 Mtr 15 PCC Poles 9 Mtr 16 PCC Poles 11Mtr 17 Poles: Physical Verification, Carriage and Stacking Back Steel Tubular/Cement Poles 18 ST Poles 8 Mtr 19 ST Poles 9 Mtr 20 ST Poles 11 Mtr 21 ST Poles 13 Mtr 22 PCC Poles 8 Mtr 23 PCC Poles 9 Mtr 24 PCC Poles 11Mtr 25 Condcutor: Unloading of ACSR Conductor Drums by Mannual/Mechanical means, verification and storage of same 26 ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum 27 ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum 28 ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum 29 ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum 30 ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum 31 ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum 32 ACSR Zebra Conductor Avg 1.0 Km/Drum 33 Condcutor: Carriage of ACSR Conductor Drums from storage site to loading site and loading of same into truck 34 ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum 35 ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum 36 ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum 37 ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum 38 ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum 39 ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum 40 ACSR Zebra Conductor Avg 1.0 Km/Drum 41 Condcutor: Physical verification, carriage & stacking back ACSR Conductor 42 ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum 43 ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum 44 ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum 45 ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum 46 ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum 47 ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum 48 ACSR Zebra Conductor Avg 1.0 Km/Drum 49 Transformers: Unloading of Transformers by Mannual/ Mechanical means, verification and carriage to storage site including storage of same 50 10 MVA/33/11KV Power Transformers 51 6.3 MVA/33/11KV Power Transformers 52 10 MVA/66/11 KV Power Transformers 53 3.15 MVA/33 KV Power Transformers 54 630 KVA Distribution Transformers 55 400 KVA Distribution Transformers 56 250 KVA Distribution Transformers 57 200 KVA Distribution Transformers 58 100 KVA Distribution Transformers 59 63 KVA Distribution Transformers 60 25 KVA Distribution Transformers 61 Transformers: Carriage of Transformers from storage sie to loading site and laoding of same into truck. 62 10 MVA/33/11KV Power Transformers 63 6.3 MVA/33/11KV Power Transformers 64 10 MVA/66/11 KV Power Transformers 65 3.15 MVA/33 KV Power Transformers 66 630 KVA Distribution Transformers 67 400 KVA Distribution Transformers 68 250 KVA Distribution Transformers 69 200 KVA Distribution Transformers 70 100 KVA Distribution Transformers 71 63 KVA Distribution Transformers 72 25 KVA Distribution Transformers 73 Transformers: Physical verification, carriage and stacking back transformers. 74 10 MVA/33/11KV Power Transformers 75 6.3 MVA/33/11KV Power Transformers 76 10 MVA/66/11 KV Power Transformers 77 3.15 MVA/33 KV Power Transformers 78 630 KVA Distribution Transformers 79 400 KVA Distribution Transformers 80 250 KVA Distribution Transformers 81 200 KVA Distribution Transformers 82 100 KVA Distribution Transformers 83 63 KVA Distribution Transformers 84 25 KVA Distribution Transformers 85 Unloading of PVC / XLPE/LT/HT Aluminium Cable Drums by mannual/mechanical means, verification and carriage to storage site including storage of the same. 86 95 sqmm 1 core PVC Cable 87 120 sqmm 1 core PVC Cable 88 185 sqmm 1 core PVC Cable 89 240 sqmm 1 core PVC Cable 90 300 sqmm 1 core PVC Cable 91 400 sqmm 1 core PVC Cable 92 630 sqmm 1 core PVC Cable 93 400 sqmm XLPE Cable 11 KV Grade 3 Core 94 300 sqmm XLPE Cable 11 KV Grade 3 Core 95 240 sqmm XLPE Cable 11 KV Grade 3 Core 96 185 sqmm XLPE Cable 11 KV Grade 3 Core 97 120 sqmm XLPE Cable 11 KV Grade 3 Core 98 11 KV Single Core XLPE 630 mmsq 99 33 KV Single Core XLPE 630 mmsq 100 185 mmsq 3.5 core PVC Cable 101 300 mmsq 3.5 core PVC Cable 102 ABC 120 mmsq 5 Core PVC Cable 103 LT ABC 3Cx120 mmsq 104 LT ABC 3Cx50 mmsq 105 LT ABC 3Cx35 mmsq 106 LT ABC 3Cx25 mmsq 107 HT Cable 3Cx185 mmsq 108 HT Cable 3Cx120 mmsq 109 HT Cable 3Cx50 mmsq 110 Carraige of PVC / XLPE/LT/HT Aluminium Cable Drumsfrom storage site to loading site and loading of same into truck 111 95 sqmm 1 core PVC Cable 112 120 sqmm 1 core PVC Cable 113 185 sqmm 1 core PVC Cable 114 240 sqmm 1 core PVC Cable 115 300 sqmm 1 core PVC Cable 116 400 sqmm 1 core PVC Cable 117 630 sqmm 1 core PVC Cable 118 400 sqmm XLPE Cable 11 KV Grade 3 Core 119 300 sqmm XLPE Cable 11 KV Grade 3 Core 120 240 sqmm XLPE Cable 11 KV Grade 3 Core 121 185 sqmm XLPE Cable 11 KV Grade 3 Core 122 120 sqmm XLPE Cable 11 KV Grade 3 Core 123 11 KV Single Core XLPE 630 mmsq 124 33 KV Single Core XLPE 630 mmsq 125 185 mmsq 3.5 core PVC Cable 126 300 mmsq 3.5 core PVC Cable 127 ABC 120 mmsq 5 Core PVC Cable 128 LT ABC 3Cx120 mmsq 129 LT ABC 3Cx50 mmsq 130 LT ABC 3Cx35 mmsq 131 LT ABC 3Cx25 mmsq 132 HT Cable 3Cx185 mmsq 133 HT Cable 3Cx120 mmsq 134 HT Cable 3Cx50 mmsq 135 Physical Verification, carriage and stacking backPVC / XLPE/LT/HT Aluminium Cable Drums 136 95 sqmm 1 core PVC Cable 137 120 sqmm 1 core PVC Cable 138 185 sqmm 1 core PVC Cable 139 240 sqmm 1 core PVC Cable 140 300 sqmm 1 core PVC Cable 141 400 sqmm 1 core PVC Cable 142 630 sqmm 1 core PVC Cable 143 400 sqmm XLPE Cable 11 KV Grade 3 Core 144 300 sqmm XLPE Cable 11 KV Grade 3 Core 145 240 sqmm XLPE Cable 11 KV Grade 3 Core 146 185 sqmm XLPE Cable 11 KV Grade 3 Core 147 120 sqmm XLPE Cable 11 KV Grade 3 Core 148 11 KV Single Core XLPE 630 mmsq 149 33 KV Single Core XLPE 630 mmsq 150 185 mmsq 3.5 core PVC Cable 151 300 mmsq 3.5 core PVC Cable 152 ABC 120 mmsq 5 Core PVC Cable 153 LT ABC 3Cx120 mmsq 154 LT ABC 3Cx50 mmsq 155 LT ABC 3Cx35 mmsq 156 LT ABC 3Cx25 mmsq 157 HT Cable 3Cx185 mmsq 158 HT Cable 3Cx120 mmsq 159 HT Cable 3Cx50 mmsq 160 C&R Panels: Unloading of 11 KV VCB Panels by mannual/ mechanical means, verification and carriage to storage site including storage of same 161 11 KV VCB Panels Sets (1+3) 162 11 KV VCB Panels Sets (1+4) 163 11 KV VCB Panels Sets (1+5) 164 11 KV VCB Panels Sets (2+5) 165 11 KV VCB Panels (Incomer) 166 11 KV VCB Panels (Outgoing) 167 33 KV C&R Panels 168 Line Panels 169 Transformer Panels 170 C&R Panels: Carriage of 11 KV VCB Panels from storage site to loading site and loading of same into truck. 171 11 KV VCB Panels Sets (1+3) 172 11 KV VCB Panels Sets (1+4) 173 11 KV VCB Panels Sets (1+5) 174 11 KV VCB Panels Sets (2+5) 175 11 KV VCB Panels (Incomer) 176 11 KV VCB Panels (Outgoing) 177 33 KV C&R Panels 178 Line Panels 179 Transformer Panels 180 C&R Panels: Physical verification, carriage and stacking back 11 KV VCB Panels 181 11 KV VCB Panels Sets (1+3) 182 11 KV VCB Panels Sets (1+4) 183 11 KV VCB Panels Sets (1+5) 184 11 KV VCB Panels Sets (2+5) 185 11 KV VCB Panels (Incomer) 186 11 KV VCB Panels (Outgoing) 187 33 KV C&R Panels 188 Line Panels 189 Transformer Panels 190 Other Key Materials: Unloading of below key materials by mannual/ mechanical means, verification and carriage to storage site including storage of same. 191 Transformer Oil Fresh (in barrels of 210 ltrs) 192 11 KV Hor Gap Fuse Sets 193 Portable Oil Filtration Plant 194 33 KV Isolators with E/B 195 33 KV Isolators without E/B 196 11 KV Disc Insulators 197 33 KV Disc Insulators 198 11 KV Pin Insulators with Pins 199 33 KV Pin Insulators with Pins 200 LT Shackle Insulators 201 Sundary Materials/Un-Serviceable Material 202 33 KV VCB 203 33 KV LAs 204 33 KVCTs 205 66 KV SF-6 Breaker 206 66 KV CTs 207 66 KV Isolators with E/B 208 66 KV Isolators without E/B 209 Battery Charger 36 V 210 IPC for phases (120.120) 211 IPC for bare messanger (70-70) 212 IPC for street lighteningwire (16-16) 213 IPC for phase (50-50) 214 IPC for messenger (35-35) 215 IPC for phases (120-50) Pole DB 216 IPC for bare messenger (70-50) Pole DB 217 Pole DB Three Phase 218 DB (LT)100 KVA with MCCB with 2 Ckts 219 DB (LT) 250 KVA with MCCB with 2 Ckts 220 DB (LT) 400 KVA with MCCB with 2 Ckts 221 11 KV 3-Phase Isolaors (800 Amps) 222 11 KV 3 Phase Gang Operated Switch (600 Amps) 223 11 KV 3 Phase DO Fuse Set 224 11 KV LAs Sets 225 Dead end clamp with mounting arrangement for HT AB Cable 226 Suspension clamp with mounting arrangement for HT AB Cable 227 Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm 228 Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm 229 Suspension clamp with mounting arrangement for LT AB Cable 230 End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable 231 End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable 232 End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable 233 Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable 234 Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable 235 Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable 236 Mid Span joints for LT AB Cable 3C x 50 Sqmm 237 Mid Span joints for LT AB Cable 50 Sqmm 238 Mid Span joints for LT AB Cable 35 Sq mm 239 Mid Span joints for LT AB Cable 16 Sq mm 240 Mid Span joints for LT AB Cable 3C x 120 Sqmm 241 Mid Span joints for LT AB Cable 120 Sqmm 242 Mid Span joints for LT AB Cable 70 Sq mm 243 Mid Span joints for LT AB Cable 16 Sq mm 244 Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete 245 7/3.15 mm dia GI stranded wire 246 GI Earthing Rods 247 S.W.G. 6 248 Other Key Materials: Carriage of material from storage site to loading site and loading of same into truck 249 Transformer Oil Fresh (in barrels of 210 ltrs) 250 11 KV Hor Gap Fuse Sets 251 Portable Oil Filtration Plant 252 33 KV Isolators with E/B 253 33 KV Isolators without E/B 254 11 KV Disc Insulators 255 33 KV Disc Insulators 256 11 KV Pin Insulators with Pins 257 33 KV Pin Insulators with Pins 258 LT Shackle Insulators 259 Sundary Materials/Un-Serviceable Material 260 33 KV VCB 261 33 KV LAs 262 33 KVCTs 263 66 KV SF-6 Breaker 264 66 KV CTs 265 66 KV Isolators with E/B 266 66 KV Isolators without E/B 267 Battery Charger 36 V 268 IPC for phases (120.120) 269 IPC for bare messanger (70-70) 270 IPC for street lighteningwire (16-16) 271 IPC for phase (50-50) 272 IPC for messenger (35-35) 273 IPC for phases (120-50) Pole DB 274 IPC for bare messenger (70-50) Pole DB 275 Three Phase 276 100 KVA with MCCB with 2 Ckts 277 250 KVA with MCCB with 2 Ckts 278 400 KVA with MCCB with 2 Ckts 279 11 KV 3-Phase Isolaors (800 Amps) 280 11 KV 3 Phase Gang Operated Switch (600 Amps) 281 11 KV 3 Phase DO Fuse Set 282 11 KV LAs Sets 283 Dead end clamp with mounting arrangement for HT AB Cable 284 Suspension clamp with mounting arrangement for HT AB Cable 285 Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm 286 Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm 287 Suspension clamp with mounting arrangement for LT AB Cable 288 End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable 289 End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable 290 End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable 291 Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable 292 Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable 293 Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable 294 Mid Span joints for LT AB Cable 3C x 50 Sqmm 295 Mid Span joints for LT AB Cable 50 Sqmm 296 Mid Span joints for LT AB Cable 35 Sq mm 297 Mid Span joints for LT AB Cable 16 Sq mm 298 Mid Span joints for LT AB Cable 3C x 120 Sqmm 299 Mid Span joints for LT AB Cable 120 Sqmm 300 Mid Span joints for LT AB Cable 70 Sq mm 301 Mid Span joints for LT AB Cable 16 Sq mm 302 Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete 303 7/3.15 mm dia GI stranded wire 304 GI Earthing Rods 305 S.W.G. 6 306 Other Key Materials: Physical verification carriage and stacking back 307 Transformer Oil Fresh (in barrels of 210 ltrs) 308 11 KV Hor Gap Fuse Sets 309 Portable Oil Filtration Plant 310 33 KV Isolators with E/B 311 33 KV Isolators without E/B 312 11 KV Disc Insulators 313 33 KV Disc Insulators 314 11 KV Pin Insulators with Pins 315 33 KV Pin Insulators with Pins 316 LT Shackle Insulators 317 Sundary Materials /Un-Serviceable Material 318 33 KV VCB 319 33 KV LAs 320 33 KVCTs 321 66 KV SF-6 Breaker 322 66 KV CTs 323 66 KV Isolators with E/B 324 66 KV Isolators without E/B 325 Battery Charger 36 V 326 IPC for phases (120.120) 327 IPC for bare messanger (70-70) 328 IPC for street lighteningwire (16-16) 329 IPC for phase (50-50) 330 IPC for messenger (35-35) 331 IPC for phases (120-50) Pole DB 332 IPC for bare messenger (70-50) Pole DB 333 Three Phase 334 100 KVA with MCCB with 2 Ckts 335 250 KVA with MCCB with 2 Ckts 336 400 KVA with MCCB with 2 Ckts 337 11 KV 3-Phase Isolaors (800 Amps) 338 11 KV 3 Phase Gang Operated Switch (600 Amps) 339 11 KV 3 Phase DO Fuse Set 340 11 KV LAs Sets 341 Dead end clamp with mounting arrangement for HT AB Cable 342 Suspension clamp with mounting arrangement for HT AB Cable 343 Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm 344 Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm 345 Suspension clamp with mounting arrangement for LT AB Cable 346 End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable 347 End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable 348 End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable 349 Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable 350 Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable 351 Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable 352 Mid Span joints for LT AB Cable 3C x 50 Sqmm 353 Mid Span joints for LT AB Cable 50 Sqmm 354 Mid Span joints for LT AB Cable 35 Sq mm 355 Mid Span joints for LT AB Cable 16 Sq mm 356 Mid Span joints for LT AB Cable 3C x 120 Sqmm 357 Mid Span joints for LT AB Cable 120 Sqmm 358 Mid Span joints for LT AB Cable 70 Sq mm 359 Mid Span joints for LT AB Cable 16 Sq mm 360 Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete 361 7/3.15 mm dia GI stranded wire 362 GI Earthing Rods 363 S.W.G. 6 364 Personnel Protective Equipments: Unloading of following Personnel Protective Equipments by Mannual/mechanical means. Verification and carriage to storage site including storage of the same. 365 Full body safety harness, 366 workman safety shoes, 367 safety helmets, 368 high voltage gloves, 369 high voltage detector sets 220/132 KV 370 high voltage detector sets33/11 KV 371 Earthing discharge rods 11/33 KVKV System 372 Earthing discharge rods 132-220 KV System 373 Carriage of Personnel Protective Equipments from storage site to loading site and loading of same into truck. 374 Full body safety harness, 375 workman safety shoes, 376 safety helmets, 377 high voltage gloves, 378 high voltage detector sets 220/132 KV 379 high voltage detector sets33/11 KV 380 Earthing discharge rods 11/33 KVKV System 381 Earthing discharge rods 132-220 KV System 382 Physical Verification, carriage and stacking back personnel protective equipments 383 Full body safety harness, 384 workman safety shoes, 385 safety helmets, 386 high voltage gloves, 387 high voltage detector sets 220/132 KV 388 high voltage detector sets33/11 KV 389 Earthing discharge rods 11/33 KVKV System 390 Earthing discharge rods 132-220 KV System 391 Unloading of Control Cable Drums by mannual/ mechanical means. Verification and carriage to storage site including storage of the same. 392 2 Core 2.5 mm sq Control Cable 393 4 Core 2.5 mm sq Control Cable 394 6 Core 2.5 mm sq Control Cable 395 8 Core 2.5 mm sq Control Cable 396 10 Core 2.5 mm sq Control Cable 397 12 Core 2.5 mm sq Control Cable 398 Carriage of Control Cable Drums from storage site to loading site and loading of same into truck 399 2 Core 2.5 mm sq Control Cable 400 4 Core 2.5 mm sq Control Cable 401 6 Core 2.5 mm sq Control Cable 402 8 Core 2.5 mm sq Control Cable 403 10 Core 2.5 mm sq Control Cable 404 12 Core 2.5 mm sq Control Cable 405 Physical verification, carriage and stacking back Control Cable Drums 406 2 Core 2.5 mm sq Control Cable 407 4 Core 2.5 mm sq Control Cable 408 6 Core 2.5 mm sq Control Cable 409 8 Core 2.5 mm sq Control Cable 410 10 Core 2.5 mm sq Control Cable 411 12 Core 2.5 mm sq Control Cable 412 Unloading of XLPE Twin Core Cable Drums by mannual/ mechanical means. Verification and carriage to storage site includig storage of the same. 413 10 mm sq Twin Core Cable (Armoured) 414 10 mm sq Twin Core Cable (Un-Armoured) 415 16 mm sq Twin Core Cable (Armoured) 416 16 mm sq Twin Core Cable (Un-Armoured) 417 Carriage of XLPE Twin Core Cable Drums from storage site/Unrolling, Measurement, Cutting to loading site and loading of same into truck 418 10 mm sq Twin Core Cable (Armoured) 419 10 mm sq Twin Core Cable (Un-Armoured) 420 16 mm sq Twin Core Cable (Armoured) 421 16 mm sq Twin Core Cable (Un-Armoured) 422 Physical verification carriage and stacking backXLPE Twin Core Cable Drums 423 10 mm sq Twin Core Cable (Armoured) 424 10 mm sq Twin Core Cable (Un-Armoured) 425 16 mm sq Twin Core Cable (Armoured) 426 16 mm sq Twin Core Cable (Un-Armoured) 427 Unloading/ Loading/ Physical Verification by mannual/mechanical means of the following material: 428 10-60 Amp 1 Phase Energy Meters 429 3-Phase Energy Meters 430 Prepaid/ Smart Energy Meters 431 33 KC Ct/PT Units 432 Earth Wire 433 11 KV 630 Amp Isolator with Earth Switch 434 Misc. items like fittings, nuts bolts, MCBs etc 435 Surface Dressing/ ground clearance within store area, including uproating of unwanted vegetation, thorny bushes, small trees etc, & then its disposal properly for smooth handling of material. 436 Repair and maintenance of existing illumination in store yard and divisional permises viz:Tighteneing of loose conductor including straightening of fexisting poles and providing of spacers between the conductors (Line length 1 Km 3 wire LT Line) 437 Providing and fixing of one No street light LED 90 watts of reputed make with hardware fitting complete job having warranty as per firms norm. 438 Repair and maintenance of existing non-functional street lights installed in store yard. 439 AMC for the existing 30 MT Electronic Weigh Bridge (through authorized service provider) installed in the store yard. Load Cells 30 MT Make Multi Weigh.a) AMC Changes will be paid annually after verification from concerned AEE.b) AMC will be comprehensive nature including all parts except load cell & PCB.c) Provide two routine maintenance per year besides breakdown.d) Specially trained mechanic be sent fortnightly for routine calibration.e) In case of breach of contract, division has the right to terminate the contract without any liability on it to get same done from other source at the cost and risk of the contractor. 440 Unloading by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. 441 Loadingby mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. 442 Physical Verification, Carriage by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. 443 Providing and fixing of 0.8 KVA Invertor alongwith maintenance free 12 Volt Battery of reputed make