Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Overhauling of Disconnecting Switch Total quantity 1 is equal to 50 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Assistance in testing of Disconnecting Switch Total quantity 1 is equal to 50 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Tightness of terminal connections of a circuit breaker all three poles Total quantity 1 is equal to 12 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Assistance in testing of a circuit breaker all three poles Total quantity 1 is equal to 12 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Single Tension or Suspension string for single conductor Total quantity 1 is equal to 220 Nos for two years; Service Prov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Single Tension or Suspension string for triple conductor Total quantity 1 is equal to 170 Nos for two years; Service Prov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Double Insulator Tension or Suspension string for single conductor Total quantity 1 is equal to 120 Nos for two years; Se.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Running Joints Total quantity 1 is equal to 300 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Jumper connection Total quantity 1 is equal to 200 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of sky wires Total quantity 1 is equal to 55 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning of 220kV Insulators ie CT or PT or LA or Bus post and others Total quantity 1 is equal to 275 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Assistance in testing of CT or PT or LA or Transformer Bushing All three phases Total quantity 1 is equal to 42 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Wave trap Total quantity 1 is equal to 8 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of Bus post insulator mounted horizontally and fixed on wall at CWPH and TB3 Total quantity 1 is equal to 80 Nos for two yea.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Cleaning and tightness of 16 point 5 kV by 6 point 6 kV Isolated phase bus duct Total quantity 1 is equal to 4 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of gasket of inspection box of Bus Duct Total quantity 1 is equal to 100 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of neoprene bellow size approx Dia 800 to 1200mm Total quantity 1 is equal to 3 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of neoprene bellow size approx Dia 450 to 600mm Total quantity 1 is equal to 3 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Single Tension or Suspension string for triple conductor Total quantity 1 is equal to 2 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Single Tension or Suspension string for single conductor Total quantity 1 is equal to 2 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Double insulator tension or Suspension string of one set for single conductor Total quantity 1 is equal to 2 Nos for two years; Serv.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Bus Post Insulator Total quantity 1 is equal to 2 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Insulator of Disconnecting Switch or CT or EMPT or CVT Total quantity 1 is equal to 2 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Wall mounted insulator at CWPH and TB 3 Total quantity 1 is equal to 2 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments Version 2) - RR Site Unit 3 and 4; Replacement of Conductor or jumper upto twenty meter length Total quantity 1 is equal to 6 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of Sky wire 60 meter length Total quantity 1 is equal to 5 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of 245 kV Circuit Breaker Pole complete unit of one phase Total quantity 1 is equal to 3 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; Replacement of 245kV CT or CVT or EMPT or LA complete unit of one phase Total quantity 1 is equal to 5 Nos for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site Unit 3 and 4; The visit charges of four persons from bidders premises to RR Site for carrying out the operational emergency task mentioned at Srno15 if any Total Quantity :