}

Tender For Consultancy Services For Preparation Of Detailed Project Report For Widening & Strengthening To 4L Fromkm 5.000 To Km 14.690 On Nh-20 (Champua To Rimuli), champua-Odisha

Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Detailed Project Report For Widening & Strengthening To 4L Fromkm 5.000 To Km 14.690 On Nh-20 (Champua To Rimuli). Submission Date for this Tender is 16-12-2024. Laser Printers Tenders in champua Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

45597444
Corrigendum : Tender For Consultancy Services For Preparation Of Detailed Project Report For Widening & Strengthening To 4L Fromkm 5.000 To Km 14.690 On Nh-20 (Champua To Rimuli)
Open Tender
NCB
Odisha
Champua
16-12-2024

Tender Details

Consultancy Services for preparation of Detailed Project Report for Widening & strengthening to 4L fromKm 5.000 to Km 14.690 on NH-20 (Champua to Rimuli); 1 Key Personnel (Professional Staff) 2 Team Leader cum Highway Engineer 3 Bridge Engineer 4 Highway Engineer 5 Material-cum-Geo-technical Engineer 6 Survey Engineer 7 Traffic and Safety Expert 8 Environmental Specialist 9 Quantity Surveyor 10 Land Acquisition Expert 11 Utility Expert 12 B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) 13 To be filled by Consultant 14 To be filled by Consultant 15 To be filled by Consultant 16 To be filled by Consultant 17 To be filled by Consultant 18 To be filled by Consultant 19 To be filled by Consultant 20 Support Staff 21 Office Manager 22 Typist 23 Office Boy 24 Night Watchman 25 III. Transportation (Fixed costs) 26 The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of consultants 27 Duty Travel to Site (Fixed Costs) 28 Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc. 29 Office Supplies, Utilities and Communication ( Fixed Costs ) 30 Office Supplies Drafting 31 Supplies computer 32 Running Costs 33 Domestic and International Communication 34 Office Furniture and Equipment ( Rental ) 35 Office Furniture and Equipment 36 Reports and Document Printing 37 Monthly Report (per month) 38 Inception Report & QAP 39 Environment and Social ImpactScreening Report 40 Draft Feasibility Report 41 Final Feasibility Report 42 Strip Plan with L.A. Reports 43 Draft LA and Clearances I Report 44 Final LA and Clearances I Report 45 Draft Environmental Assessment report & RAP 46 Final Environmental Assessment report & RAP 47 Draft Detailed Design Report & Drawings etc. 48 Draft EMP 49 Draft Bidding Documents 50 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc 51 Final EMP 52 Final Bidding Documents 53 Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each) 54 LA & Clearances II Report 55 IX Survey and Investigation 56 Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer. 57 Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology 58 B. Investigation (Fixed cost) 59 Road and Bridge Inventory 60 FWD Test and Pavement Evaluation 61 Roughness Survey 62 Axle Load Survey 63 Material Survey and Investigation 64 Sub-grade Investigation 65 Traffic Survey 66 Socio-economic & Census Survey/ Studies 67 Land Acquisition Studies 68 Any other investigations/surveys 69 Sub-Soil Investigation (Boring) 70 (a) Boaring in all type of soils (other than hard rock) 71 (b) Boaring in hard rock 72 NET WORK SURVEY AND GPR 73 Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority 74 GPR Survey for detection of under ground utilities 75 Cost of supply and fixing boundary pillars 76 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) 77 Land acquisition Team including support staff and logistics/transportation 78 Ex-Land revenue inspector/officer or equivalent 79 EX-kanoogo/Girdwar or equivalent 80 Ex-Patwari or equivalent 81 Typist 82 Peon 83 Logistic for Land Acquisition Team 84 Computer including necessary peripherals 85 Printer 86 Vehicles(Bolero or equivalent )with monthly running limit of 4000 km

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 08-11-2024 Pre-bid Query Other 18-11-2024
2 18-11-2024 1st Corrigendum Date 27-11-2024
3 27-11-2024 2nd Corrigendum Date 16-12-2024

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail