Madurai District Construction Of New Mini Community Sanitation Complex ( Ladies ) In Union Primary School Kongapatti Village Vadugapatti Panchayat Usilampatti Block , Madurai District Construction Of New Mini Community Sanitation Complex ( Ladies ) In Union Primary Schoolkongapattivillage Vadugapatti Panchayat At Usilampatti Block , Earth Work Excavation For Foundation In All Soils Such As Red Earth ,Hard Stiff Clay Soil, Stiff Black Cotton Soil, Hard Redearth,Shales, Murrams, Gravel,Hard Rock Not Requiring Blasting Ete Complete., , Cement Concrete 1:4:8 Mix Usin 40 Mm Hbgs Metal Inculding Cost And Coveyance Of All Materials To Site Including Labour For Mixing ,L Aying,Curing Etc Complete., , Brick Work In Cement Mortor 1:5 (One Cement And Live Sand) Using Ii Class Bricks For The Following Including Mixing Mortar And All Other Labour Charges Etc Complete Above Basement , Supplying And Erecting Shuttering Including Necessary Support For Plance Surface In Foundation Basement And Roof Sllabs Struting Upto 3.29 M Height For Plane Surfaces For Floors For Rcc Column Footings Columns Plinth Beam And Connecterd With Foundations Grade Beams, Raft Slabs Stair Case Steps, Bed Blocks, Critical Pier, Etc Beams Roof Slabs, Using Mild Steelsheets Of Size 90 X 60 Cm And 10 Gouge Stiffened, Welded With Steel Angles Of Size 25 Mm X 25 Mm X 3Mm For Boarding Laid Over Silver Oak (Country Wood) Joists Of 10 Cm Size X 6.5 Cms Size Spaced At Abour 90 Cms Center To Center And Supported Cauanna Props Of 10 Cm To13 Cms Spaced At 75 Cms To Center To Center Etc., Complete Complying With Standard Specification And As Directed (Si - 155) , Cement Concrete 1:1.5:3 (One Cement One And Half Sand And Three Machine Broken Stone) Using 20 Mm Iss Gauge Machine Broken Hbg Metal For Rcc Works Excluding Cost And (Abrication Otreinforcement And Centerning Shuttering Charges But Including Curing And Providing Fixtures Like Fan Clampsin The Rcc Floor Or Roof Wherever Necessary And Bearing Surfaces Of Walls Sides And Bottom Of Slab, Beam Etc., Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three Sand) 12Mm Thick And With Kraft Paper Without Claming Extra Etc As Directed By The Departmental Officers Complete Complying With Standard Specification. , As Per Steel Shedule , Plastering With Cement Mortar 1:5 (One Cement And Five Sand ) 12Mm Thick In All Floors Including Mixing Mortar, Working In All Heights Curing Watering With All Leads And Lifts For Good Water Etc., Complete Complying With Standard Specification. , Plastering With Cement Mortar 1:3 (One Cement And Three Sand ) 10Mm Thick In All Floors Including Mixing Mortar, Working In All Heights Curing Watering With All Leads And Lifts For Good Water Etc., Complete Complying With Standard Specification. , Ceramic Tiles Flooring Laying With New Ceramic Tiles Of Size 305X305x6 Mm Laid In C M 1:3 Inculdingcost Of White Cement And Labour Charges Etc , Dadooing Using 200X300 Any Colour Glazed Tiles Fixed Over 12Mm Thick Cement Plaster In Cm 1:2Including All Charges Et., Complete , Supplying And Painting The Walls With Two Coats Of Oil Bound Distemper Over One Coat Of Water Based Cement Primer Including Cost For Distemper, Primer, Cleaning And Scrapping The Walls, Rendering The Wallssmooth With Necessary Putty, Brushes, Scaffolding Arrangements, Labour Charges, Etc., As Per Standard Specification.(The Colour And Shade Of The Distemper Shall Be Got Approved By The Executive Engineer Before Use Of Work). , Painting Two Coats Of Newly Plastered Wall Surface With Ready Mixed Plastic Emulsion Paint Of First Class Quality And Of Approved Colour Over A Priming Coat Including Thorough Scrapping, Clean Removal Of Dirt, And Including Necessary Plaster Of Paris Putty, Wherever Required Etc., Complete Complying With Standard Specification. , Towards The Cost And Supply Of Iwc With Foot Rest And P-Trap,Including All Charges Etc., Complete , Supplaying For 500 Lit Sintax Tnak Arrangements , Supplaying For Steel Door Miled Steel Cost And Convance And All Labour Chargs Etc Complete , Providing Name Board , Water Supply Arrangements , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}