}

Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spe C. Tenderer Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submit Ted Bid, kapurthala-Punjab

Rail Coach Factory has published Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spe C. Tenderer Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submit Ted Bid. Submission Date for this Tender is 31-10-2024. Raw Materials Processing Machinery Tenders in kapurthala Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

45581011
Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spe C. Tenderer Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submit Ted Bid
Open Tender
Indian
Punjab
Kapurthala
31-10-2024

Tender Details

Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spe C. Tenderer Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submit Ted Bid. ] Dy. Chief Mech. Punjab 1.00 Set , Cnc Milling Machine As Per Spec No. Mech/M&P/3700/5 Rev-Nil Alongwith Preventive Maintenance During Warranty Period As Per Clause No. 16.3 & 16.7 Of Spec. ] , Camc (Comprehensive Annual Maintenance Contract) For 5 Years After Completion Of Wa Rranty Period. The Tenderer Shall Quote Year Wise Camc Cost For As Period Of 05 Years As Per Spec. The General Conditions Of Camc Are Appended With This Tender. [ Warranty Period: 2 Years, Amc Perio D: 5 Years, Rate Of Discounting: 10 % ] ] Page 1 Of 12 Run Date/Time: 05/10/2024 12:46:37Stores/Hsq/Rcf Tender Document , Cost Of Any Other Accessory Which In The Opintion Of Supplier Is Essentially Required For M Aking The Machine Fully Functional As Per Clause No. 5.1 (Iii) Of Spec. Tenderer Are Required To Attach Th E Price Break-Up Of These Accessories In Pdf File Along With Submitted Bid. ] Dy. Chief Mech. Punjab 1.00 Set , Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Etc. ] Dy. Chief Mech. Punjab 1.00 Set At (Location) Engineer/Mfg, Rcf 6 5635N094 Optional Non Stock --- No Consignee Inr (Grp01) Spares (Y) Optional Accessories Will Be Quoted By The Tenderer With Breakup Of Individual Items As Specified As Per Clause No. 4.3 (4.3.1 To 4.3.3) Of Section-I. Tenderer Are Required To Attach The Price Br Eak Up Of These Accessories In Pdf File Along With Submitted Bid. ] Dy. Chief Mech. Punjab 1.00 Set Consignee Engineer/Mfg, Rcf 7 6635N094 Optional Non Stock --- No Consignee Inr (Grp01) Spares (Y) Optional Consumables: Defined At Clause No. 6 (6.1& 6.2) Of Section-Ii Of Spec. The List Of Consumables Shall Be Furnished And Quoted Along With Their Unit Rates. Tenderer Are Required To Attach Ed The Price Break Up Of These Consum

Key Value

Document Fees
Refer document
EMD
INR 541720.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail