}

Tender For Work To Be Done Under Full Deposit Scheme Head Against Various Approved Packages Under Electricity Distribution Section Ii, Etawah., 1 Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Inclu, etawah-Uttar Pradesh

Government Departments has published Tender For Work To Be Done Under Full Deposit Scheme Head Against Various Approved Packages Under Electricity Distribution Section Ii, Etawah., 1 Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Inclu. Submission Date for this Tender is 09-10-2024. Bolts Tenders in etawah Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

45527122
Tender For Work To Be Done Under Full Deposit Scheme Head Against Various Approved Packages Under Electricity Distribution Section Ii, Etawah., 1 Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Inclu
Open Tender
Indian
Uttar Pradesh
Etawah
09-10-2024

Tender Documents

Tender Details

tender for Work to be done under full deposit scheme head against various approved packages under Electricity Distribution Section II, Etawah., 1 Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 ST/PCC pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 AB Cable 1x16+1x25 5 ACSR Dog Conductor 6 ACSR Weasel Conductor 7 Cable Alluminium PVC 2x16 Sqmm 8 Cable Alluminium PVC 3.5x70 Sqmm 9 33 Kv XLPE Cable 3x120 Sqmm 10 25 KVA Distribution Transformer 11 63 KVA Distribution Transformer 12 Erection ofsinglesupportbyST/PCC pole includingfixingcompleteHT/LT fittingsasperRESSPOMunualincludingthecostoflabour, T&P and carrier etc. required for proper completion of work. 13 Groutingofsinglesupport ST/PCC pole asperRESSPOManual including of the cost of labour,T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 14 Erection & grouting ofdouble pole including fixing completeHT/LTfittingasperRESSPOManualincludingthe cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 15 Laying, sagging, stringing, binding & jumpering of ACSR Dog Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 16 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 17 Layingspreading,liftingandfinalsaggingofArialBunched Cable(allsize). includingfixingof allaccessoriesasper RESSPO Manual and as per direction ofsupervising engineer, includingthecostofarrangementoflabour,T&Pcarrieretc. required for proper completion of work. : 18 Erection and grouting of staycomplete including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 19 Fixing &connectingofearthingrods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 20 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 21 Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 22 Digging, laying and back filling of 3X120 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 23 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Outdoor Type) Suitable for XLPE 3x120 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 24 Guardingof HT/LT 11 Kv Line with GI wire as per RESPO Norms. includingthe costofarrangementoflabour, T&P etc required for proper completion of work. 25 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 26 Disc Fitting 27 Disc Insulator 28 Stay Clamp 29 T/F Base Angle 30 DP Clamp 31 Pin Insulator 32 T-Off Channel 33 Dropper Channel 34 Top Channel 35 Nut Bolt 36 11 Kv Cross Arm 37 F Clamp 38 Holding Clamp 39 Fuse Set 40 Guarding Angle 41 LT Distribution Box 42 Suspension Clamp

Key Value

Document Fees
INR 1180 /-
EMD
INR 8330.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Notice 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail