| 1 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Average filling depth 150 mm),includingall labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete. |
| 2 | NH-69 from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 3 | Removal of earth from the choked hill side drain and disposing it on the valley side manually,includingall labour, lead, lifts, loading, unloading ,transporting etc., complete. |
| 4 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete (For new road) - In area of light jungle by manual means. |
| 6 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 7 | Road Surface cleining using Mechanical Broom Hydraulic(Machine will be provided with Fuel and operator by the contractor) |
| 8 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 9 | BILL NO.2: ROAD PROPERTY MAINTENANCE |
| 10 | Replacement of \"W\" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70 cm above ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to confirm to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per Clause 811. |
| 11 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 12 | BILL NO -3 : PERFORMANCE BASED PAVEMENT REPAIR & ROAD MAINTENANCE |
| 13 | Providing treatment and repair to pot holes/ruts of any depth/patch repair of all types of bitumen pavement complete as per Technical Specification Clause 3004.2, and as per direction of Engineer by using paving grade bitumen/emulsion/cold ready mix material. The Job includes removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per Clause no.503,back filling with material of equivalent specification to the original construction and finished with 40mm thick BC layer as per Clause no.507. Compacting trimming and finishing the surface to form a smooth continuous surface all as per Clause no.3004.2 of Technical Specifications. and other items mentioned in Clause 3 of Section 7 of contract agreement such as C&G, maintenance of shoulder, maintenance of sign boards etc. |
| 14 | NH-69from Km 71.00 to Km 82.60(As per Detailed Estimate) |
| 15 | NH-69fromKm 89.500to Km 111.50(As per Detailed Estimate) |
| 16 | Utilization of Rescue Ambulance including man power {Emergency Medical Technician) +Driver) (Specification as per ministry circular dated 09.02.2021) |
| 17 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |
| 18 | Utilisation of Tow Away Crane/Vehicle including manpower (Driver +Helper) (Specification as per ministry circular dated 09.02.2021) |
| 19 | NH-69from Km 71.00 to Km 82.60 & Km 89.500to Km 111.50(As per Detailed Estimate) |