|
| 1 | Electrical applicance and other. |
| 2 | PVC Box (1 Per Hostel) 12 Modular |
| 3 | Plates (1 per Hostel) 12 Modular |
| 4 | Switches ( 5 per Hostel) 6 Amp |
| 5 | Socket (4 per Hostel) 6 Amp |
| 6 | MCB (1 per Hostel) 10 Amp |
| 7 | MCB Box (1 per Hostel) 1 Modular |
| 8 | Wire (75 Mtr. Per hostel) 2.5 MM, condutor-copper with PVC jacket , Flexible |
| 9 | Extension Wire, 1 MM, conductor copper with PVC jacket, flexible |
| 10 | Wire for earthing connection from electrode (15 mtr per hostel) Bare copper wire conforming with safety standards. |
| 11 | Copper coated (250 Microns) electronde for earthing & 25 Kgsilica bags (35 Mrs. Per Hostel) 58 mm , 2meters, to be dug into the ground with Chemical |
| 12 | PVC Casing for wires (50 Mtrs. Per Hostel) for electrical wiring |
| 13 | Bulb Led (1 Per Hostel) 15 Watt |
| 14 | Bulb Holder 2 Pin Angular |
| 15 | Screws ( size 35/8 & 25/7) (each hostels 1 packets = 100 nos. Screws) |
| 16 | CAT 6 Lan cable (35 Mtr average per Hostel) |
| 17 | Cat 6 Connector ( 4 per Hostel) |
| 18 | Ethernet Extender / Lan Switch ( 2 Per Hostel) |
| 19 | Wall clips for Lan cable 5 mm (each hostel 2 packet =200 pices.) |
| 20 | Wall Putty (1 kg each hostel) |
| 21 | Drilling Bits 8 MM (each hostel 3 nos. |
| 22 | PVC Tapeswith insulation (each hostel 3 nos.) |
| 23 | Extension chord (3 Sockets, 3 switches, both 5 Amp, 1.5 mtrs long cabe) |
| 24 | Transporation Charge for per hostel . |
| 25 | Labour Cost (Manpower) per hostel |
| 26 | PVC Box for bulb switch (1 Per Hostel) |