Bids Are Invited For Installation Of Artificial Wall For Rock Craft And Slithering Earth Work , Plinth level , Finishing and reinforcement , Sand Work , R C C Work , MS Bolts , Structural Steel work , Fixing plates , Rain Shed , Face three D panels , Safety equipment Earth work is excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 mtr width and 10 sqm on plan), including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. all kinds of soil., Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 4mm nominal size), Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement –all wok up to plinth level 1:1.5:3(1 cement : 1.5 coarse sand :3), Sand pit Wall with filling loose Sand, Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo Mechanically Treated bars., MS Bolts round holding down of Anchor bolts with nuts and washer plates, Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat f approved steel, Providing and fixing MS Chequered plate 5mm thick (As per drawing), roviding and fixing Rain shed sheet at top platform., Designing, providing & fixing polyester resin fiber glass reinforced 3D/2D panel with minimum 6mm thickness at center & 10 mm at flanges 3D panels are modular in shapes and 2D panels are flat in shapes. Panels shall have provision of insert arrangement for fixing holders/protection points/belay point and arrangement at top for fixing security system (chain anchors) at top. The panels should be able to withstand climbers weight, weather proof for outdoor use and meet norms as per climbing STANDARDS. The panel will have sand finish on one side with slight abrasion on climbing side. Overhang and other standard should be as per drawing and as directed by designer. Wall should be so designed that it can be used for multipurpose training such as beginner/ intermediate/advance level and climbing competition. Face 1 (10 x 5 Mtr) -3D Panels, SS Fixed important chain anchors, Movable Climbing Holds (providing and Fixing), Climbing Rope 10mm, Harness, Screw Carabineers, Fig of 8, Quick draws, GRI-GRI, Belay Gloves Total Quantity : 10828