Tender For Shifting Work Of Electrical Utilities Under Edd, Banda, 1 The work of erection of 33 KV/11 KV HT & LT Lines due to shifting of above lines from Vill. Paprenda to Chilla Bye-Pass for widthening/extension of Road from Banda-Chilla Road in Banda City fed from 33/11 KV Sub-Station, CHILLA (BANDA) of EDSD, PAILANI under FULL DEPOSIT SCHEME 2024-25 under EDD, BANDA, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. Details of the work as given below ;- 2 Safe cartage of PCC Pole 8.5 Mtr. Long from ESC to site of work. 3 Safe cartage of ST Pole 13 Mtr. Long from ESC to site of work. 4 Safe cartage of ST Pole 11 Mtr. Long from ESC to site of work. 5 Cartage of line Material Viz. Weasl/DOG conductor, GI Wire, Cross Arm, Earthing, XLPE/ABC Cable, Stay, clamps, channel, angle etc. 6 Erection of PCC Pole 8.5 Mtr. Longas single Support Structure, including complete HT/LT fittings of all related accessories as per direction of Engineer Incharge/RESSPO Manual. 7 Erection of ST Pole 11/13 Mtr. Longas single Support Structure, including complete HT/LT fittings of all related accessories as per direction of Engineer Incharge/RESSPO Manual. 8 Erection of ST Pole 11/13 Mtr. Longas Double Pole Structure, including complete HT/LT fittings of all related accessories as per direction of Engineer Incharge/RESSPO Manual. 9 Concreting/Grouting of newly erected single pole structure on 8.5 Mtr. PCC poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work. 10 Concreting/Grouting of newly erected single/double pole structure on 11/13 Mtr. ST poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work. 11 Erection of stay set complete at digging of pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 as per RESSPO norms alongwith nozeling & binding of stay set, stay. 12 Fixing of earthing rod as per direction of supervising engineer/RESSPO manual, including the cost of labour, T&P etc. required for proper completion of work. 13 Laying and sagging of ACSR of Weasl/Dog conductor with stringing, binding & jumpering, including with fixing of all material as per site requirement for 33 KV/11 KV Lines. 14 Laying and sagging of ABC Cable 3x120+1x95+1x16 Sq.mm., including with all material as per site requirement. 15 Dismentling & removal of existing/erected old & damaged PCC/STP/Joist/Rail Pole as Single/Double Pole structure with its accessories from old lines due to shifting and loading/unloading & cartage of dismentled line material (Scrape)/poles from site to store. 16 Guarding of 11 KV over head Lines crossing by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESSPO Manual. 17 Fixing of T-Off Channel alongwith fitting of all accessories as per RESSPO manual. 18 Erection & fixing of LT Distribution Boxes on single pole/double poles including with ABC Cable. 19 Fixing of Danger Board alongwith fitting of all accessories as per RESSPO manual. 20 Making/construction of new plinth for 250 KVA T/F & erection of Bericating (Fencing) of T/F as per RESSPO Manual. All material related to erection of plinth & fencing (Bericating) arranged by contractor at his own cost. The material used in execution of work should be the best quality, including the cost of labour, T&P and carrier etc. required for proper completion of work. 21 Chopping of Tree Branches Coming in the vicinity of the lines during execution of the above works.