|
| 1 | Schedule \"A\" Part - I (RCC Road) Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 3 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:0.75:1.5 (1 Cement : 0.75 coarse sand (zone-III) derived from naturalsources : 1.5 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 4 | Supply and laying of vapour barrier as per direction of EIC |
| 5 | Schedule \"A\" Part - II (Drainage) Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 6 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 8 | 12 mm cement plaster finished with a floating coat of neat cement ofmix :1:4 (1 cement: 4 fine sand) |
| 9 | Schedule \"A\" Part - III (Hume pipe culvert) Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 10 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 11 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement: 3 coarse sand (zone-III) derived fromnatural sources : 6 graded stone aggregate 20 mm nominalsize derived from natural sources) |
| 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 13 | 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) |
| 14 | Providing and laying non-pressure NP2 class (light duty) R.C.C.pipes with collars jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement : 2 fine sand) including testing of jointsetc. complete :600 mm dia. R.C.C. pipe |
| 15 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete |