}

Tender For Supply Of Equipment/Material, Design, Erection, Testing And Commissioning For Sop To Jica By Prov. New 11/0.4Kv, 63 Kva S/Stn Twis Chabuan A/W 11Kv Ht Line And 3-Ph Lt Line In Es Sidhatha Uesd Jawali. (Ts No. 46/2024-25), jawali-Himachal Pradesh

Government Departments has published Tender For Supply Of Equipment/Material, Design, Erection, Testing And Commissioning For Sop To Jica By Prov. New 11/0.4Kv, 63 Kva S/Stn Twis Chabuan A/W 11Kv Ht Line And 3-Ph Lt Line In Es Sidhatha Uesd Jawali. (Ts No. 46/2024-25). Submission Date for this Tender is 01-10-2024. Electrification Work Tenders in jawali Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

45395849
Tender For Supply Of Equipment/Material, Design, Erection, Testing And Commissioning For Sop To Jica By Prov. New 11/0.4Kv, 63 Kva S/Stn Twis Chabuan A/W 11Kv Ht Line And 3-Ph Lt Line In Es Sidhatha Uesd Jawali. (Ts No. 46/2024-25)
Open Tender
Indian
Himachal Pradesh
Jawali
01-10-2024

Tender Documents

Tender Details

tender For Supply Of Equipment/Material, Design, Erection, Testing And Commissioning For Sop To Jica By Prov. New 11/0.4Kv, 63 Kva S/Stn Twis Chabuan A/W 11Kv Ht Line And 3-Ph Lt Line In Es Sidhatha Uesd Jawali. (Ts No. 46/2024-25)-11 KV HT Line 2 Prov. ACSR (6/1/3.35, 50 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} 3 Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) 4 Prov. Muffs with concerete filling 5 X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 6 GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm 7 Cross Arm: [Channel Iron (100x50x6 mm), Length:1270 mm i/c tolerance of 100 mm either side) x 6 Structure 8 Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x6 structures 9 Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] 10 Prov. & fabrication of Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm & X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm forDoub. Pole Str. i/c clamp (2 No. per set) 11 Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] Δ Formation 12 Prov. Pin Insulator with GI Pin 13 Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting 14 Prov. GO AB Switch Unit (11kV, 400A,)O/D type 15 Prov. D.O Fuse Unit 16 Prov.Stay set complete HT i/c Egg 17 Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL) 18 Prov. HT Earthing set complete 19 Eye Hook for earth wire 20 Prov. GI Wire 8 SWG. (Prov. By HPSEBL) 21 Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro structure: 2 No ] 22 Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro structure: 2 No] 23 Prov. Danger Plate (250X200X1.6 mm) 24 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 25 Prov. Barbed Wire 26 Prov. Aluminium Paint 27 MS Channel Iron: 75x40x6, Length : 2400 m for Road crossing 28 Erection of 9 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. 29 Erection of 9 Mtr. ST pole double structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. 30 Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. 31 Erection of HT Earthing set complete 32 Erection of G.O. switch 400 Amp. Comp. 33 Fixing of jumper 34 Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). 35 Sagging of GI Wire i.e. laying, stringing and sagging & binding(Single wire per KM). 36 Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.200Km) 37 63 KVA Trsanformer 38 Prov. Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA 39 Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) 40 Prov. Muffs with concerete filling 41 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line 42 Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 43 Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 44 Prov. Transformer Bed, Belting & Knee Bracing 45 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed 46 Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] 47 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 48 Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 49 Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing 50 Prov. Transformer LT Distribution Box and GO Switch fixing Assembly 51 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 52 Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 53 Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm 54 Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 55 Prov. D.O Fuse Unit 56 Prov. Lighting Arrester, 9 kV Station Class(Porcelain Type) 57 Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) 58 Prov. Stay set complete 59 Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL) 60 Prov. Pipe Earthing Set 61 Prov. LT Distribution Panel Box WithMCCB 40 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 63 KVA DTR 62 Prov. Half Clamp (M.S. Flat 50X6 mm) 63 Prov. Full Clamps (M.S. Flat 50X6 mm) 64 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 65 Prov. Aluminium Thimble(Prov. By HPSEBL) 66 Prov. Copper Thimble(Prov. By HPSEBL) 67 Prov. Danger Plate 68 Prov. Barbed Wire 69 Prov. LT Cable (3.5 Core) 95 mm² 70 Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box(CT-100-200/5A) (Prov. By HPSEBL) 71 Prov. Aluminum Paint. 72 Prov. Prov. 6/1/3.35, 50mm² 73 Prov. Transformer structure Chain Link fencing , Angle Iron ,Gate etc & Protection plinth (Civil Work as per HPSR) . 74 Erection of 63 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect. 75 Prov. Transportation charges & Mannual carriage of 63 KVA pole mounted distribution S/Stn. 76 3-Ph LT Line 77 Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} 78 Prov. Steel Tubular Poles (8 m, Working Load > 180 kgf/m²) 79 Prov. RCC Muffs 80 Prov. C.I. X-Arm (75x40x6) i/c Clamp 81 Prov. Stay set L.T. i/c Egg & Clamp). 82 Prov. Stay Wire (7/3.15 m) (6.0 kg Per Stay Set) (Prov. By HPSEBL) 83 Prov, Full Clamps ( 1 No for Stay Set) 84 Prov, Half Clamp for X-arm 85 Prov. GI Wire (Prov. By HPSEBL) 86 Prov. D.I. iron (Prov. By HPSEBL) 87 Prov. Shackle Insulator. (Prov. By HPSEBL) 88 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 89 Prov. Earthing Set 90 Prov. Aluminium Paint 91 Erection of ST pole 8 Mtr. long , digging of pit, errection of X-Arm, Shackle insulator, filling of pit , painting of pole & ramming with concerete filling of RCC Muff 92 Erection of L.T. stay set i.e. digging of pit, fixing of stay road, noseling & titening. 93 Erection of LT Earthing set complete 94 Sagging of Conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). 95 Sagging of GI WIre i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). 96 Mannual carriage of material 1 KM LT line considering average distance from road to site of work (0.080 Km) 97 Prov. GO Switch & DO Fuse Unit For Existing HT Line 98 Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 99 Prov. D.O Fuse Unit 100 X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 101 Prov. & fabrication of Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm & X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm forDoub. Pole Str. i/c clamp (2 No. per set) 102 Prov. Pin Insulator 103 Prov. Half Clamp 104 Prov. MS Nuts and Bolt 105 Erection of GO Switch & DO Fuse Unit Complete in all respect 106 Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.030Km) 107 Prov. Poles for strengthening of existing Spur 108 Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) 109 Prov. Muffs with concerete filling 110 Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) 111 Prov. Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures 112 Prov. Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] 113 Prov. Pin Insulator with GI Pin 114 Prov. Stay set complete HT i/c Egg 115 Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL) 116 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 117 Prov. Aluminum Paint. 118 Erection of 9 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. 119 Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. 120 Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.030Km) 121 Prov. Desktop Computer [HP All-in-One Core i7 (16 GB DDR4/1 TB/512GB SSD/Windows 11 Home/Intel Graphics/23.8 Inch Screen/24-cr0037in) with MS Office] for office of sr. executive engineer. 122 Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.

Key Value

Document Fees
INR 590 /-
EMD
INR 13870.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail