| 1 | SH:Earthwork |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned,including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.Ordinary soil upto 3 m depth |
| 4 | Construction of embankment with approved material obtained from borrow pits , transporting to site , spreading , grading to required slope & compacting to meet requirement of Tables 300.1 & 300.2 as per Technical Specification Clause 301. |
| 5 | Construction of hill side drain in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1, (iv) Cement plaster 15 mm thick 1:4 on stone masonry |
| 6 | SH:Pavement Work |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density ( including aggregate plugging as shown in drawing), complete as per Technical Specification Clause 401.For Grading I Material |
| 8 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. |
| 9 | Providing , laying, spreading and compacting stone agrregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 10 | Construction of earthen shoulderwith suitable material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement as per Technical Specification Clause 303 |
| 11 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 12 | Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg/sqm on the prepared granular surfaces treated with primer& cleaned with Hydraulic broom as per Technical Specification Clause 503 |
| 13 | Mix Seal Surfacing.Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level |
| 14 | SH: Concrete Works |
| 15 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 |
| 16 | Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) |
| 17 | Providing and laying reinforced cement concrete pipe1000 mm NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.1000 mm dia |
| 18 | Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109Coursed rubble masonry (2nd sort) in 1:4 cement mortar |
| 19 | Pointing with Cement Mortar (1:3) on stonekwork as per technical specification Clause 613.3 |
| 20 | Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 |
| 21 | Providing PCC M20 Architectural Coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clause 615 |
| 22 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 |
| 23 | Providing concrete for plain / reinforced concrete in foundations complete as perdrawings and technical specifications Clauses 802, 803, 1202 & 1203PCC Grade M 15Nominial mix (1:2.5:5) |
| 24 | Plain / reinforced concrete in substructure complete as perdrawings and technical specifications Clauses 802, 804, 805, 806, 1202 & 1204RCC Grade M 20 |
| 25 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specification Clauses 702, 704,1202 and 1203. CRM 2nd Sort (II) in 1:3 cement mortar |
| 26 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specification Clauses 702, 704,1202 and 1203. CRM 2nd Sort (II) in 1:5 cement mortar |
| 27 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204, III Random rubble masonry, iii In cement mortar (1:5) |
| 28 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. PCCGrade M15. Nominal Mix. 1:2.5:5 |
| 29 | Providing and laying reinforced cement concrete in superstructure as per drawing and Technical Specifications Clauses 800, 1205.4 and 1205.5RCC Grade M20. Nominal Mix.1:2:4 |
| 30 | SH: Others |
| 31 | Back filling behined abutment, wing wall and return wall complete as per drawing and Technical specificationClauses 120.,3.8. 1. Granular Material. |
| 32 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 33 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 34 | Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar(From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 35 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as pe |
| 36 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragmentweighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 |
| 37 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 |
| 38 | Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 |
| 39 | Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302I) Stone/Boulder |
| 40 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 41 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. |
| 42 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(B) Cement Concrete |
| 43 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.Above 900 mm dia hume pipe |
| 44 | SH: Setting Out |
| 45 | i) 1 km reference benchmark & working benchmark |
| 46 | ii) reference pillar |
| 47 | Construction of Reference Pillar/Bench mark/Job Pillar as per drawing & specification. |
| 48 | SH: Road Safety & Furnitures |
| 49 | Providing and fixing \"Logo\" of PMGSY Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size |
| 50 | Providing and Fixing PMGSY Logo Board at starting pointProviding and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx260cm above G.L.),(Size of board 1x |
| 51 | Providing and Fixing Title information Board of PMGSY Project (RCC)Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245 |
| 52 | Providing and Fixing Maintenance information Providing and Fixing Citizen information Board of PMGSY Project(RCC)\"A\"Providing and fixing of typical PMGSY Citizen information sign board as per MORDspecifications and drawing of cast-in-situ RCC,(Size of R |
| 53 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per drawing and Technical Specification Clause 1703(i) Ordinary Kilometer stone (precast) |
| 54 | (ii) 200m Stone (precast) |
| 55 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly |
| 56 | Road Markers/Road Stud with Lens ReflectorProviding and fixing of road stud 100 x 100 mm die cast in aluminium, resistant tocorrosive effect of salt and grit, fitted with lense reflectors, installed in concrete orasphaltic surface by drilling holes 30 |
| 57 | Rumble StripsProvision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. |
| 58 | Routine Maintenance |
| 59 | First Year |
| 60 | Second Year |
| 61 | Third Year |
| 62 | Fourth Year |
| 63 | Fifth Year |
| 64 | GST |
| 65 | Add GST @ 18% |