Supply Of Materials To grey water management Work At Kanadakur Village Of Kanadakur Gp Of Kushtagi Tq Wetland & Septic Tank Works - Brokenstone Aggregate 20 Mm Size,Brokenstone Aggregate 12 Mm To 10 Mm Size,Coarsesand(Zone Iii),Portland Cement.,Mason Class 2 (With Tools)-,Mixer (Concrete) - 1 Cum Capacity,Add Watering Charges At 1 % On Material,Add Sundries Charges At 1 % On Material,Tmt Bars Fe 500,Binding Wire,Silver Oak Or Equivalent Planks 38 Mm Thick.,Casurina Poles 100 - 150 Mm,Ms Flat.T,Bolts And Nuts,Add Handling , Loading And Unloading At2,Add Sundries Charges At2 % On Material,Brick Bats25 To 100Mm,Water Proofing Materials.,Mason Class I (With Tools),Stone Aggregate(Single Size) 40 Mm Nominalsize,Pvc Pipe Of 10Kgcum,110 Mm,Pvc Pipe Of 10Kgcum,160 Mm,Hom Of Vibrator 0.71 Days.,Stone Aggregate(Single Size )-20Mm Nominal Size,Pvc Pipe Of 10Kgcum,75 Mm,Plasticizer/Super Plasticizer,Add Watering Charges At 2% On Material,,Pvc Pipe Of 4Kg/Cum,63Mm,Jungle Wood Runners And Planks.S,Mixer (Concrete Small Used In Culvert).,Add Providing And Removing Scaffolding At 3% On Labour.,Cost Of 6.5Mm M.S Coil,Fabrication Charges,Labour Charges For Handing Errection Of Rcc Rings At 5%,Transportation Charges Of Materiels Beyond 5 Km At10%,Rubble Stones.,Bond Stone20x20x45cm,Size Stone 20X20x25cms,Boulders,Pipe 1200Mm Rcc Np3 Pipeincluding Coller At Site