|
| 1 | Removing of 100HP Ht. Motor |
| 2 | Fixing of 100HP Motor |
| 3 | Removing, dismantling, assembly & re-erection of 350 HP VT Pump |
| 4 | Transportation to & fromsite to workshop &back(90kmx2) |
| 5 | Cutless bearing neoprene rubber |
| 6 | Line Shaft Sleeve |
| 7 | Top shaft threaded sleeve (SS410) |
| 8 | Top Shaft (SS316) |
| 9 | Line Shaft (SS3I6) |
| 10 | ThreadedLouplin for Shafts (SS316) |
| 11 | Neoprene nibbe busheswithAluminumPiece for, bearing housing ratchet |
| 12 | Gun Metal Néck ring for bowl assembly |
| 13 | Bowl Assembly Shaft (SS 316) |
| 14 | GunMetalBushforCasingbowl&stuffing box |
| 15 | Drilling,Bushing,TappingwithRetappingto Bearing Housing with New Bolts |
| 16 | Hydra Charges |
| 17 | SS shaft throughout |
| 18 | of Pump using Tools, Bearing Pullers, Labours, etc. |
| 19 | Cleaning of Bearing Housing using Diesel Cotton Waste, Anti Sticking Liquid, etc. |
| 20 | Providing & Fixing of following Spares |
| 21 | Bearing294l6 EL — XL |
| 22 | Bearing 6020 M/C4 |
| 23 | Housing Packing |
| 24 | Assembling Fitting of Bearing Housing using Mounting to Pump with Proper Alignment \" |
| 25 | Fixing of Motor |
| 26 | Commissioning with Test & Trials |
| 27 | To & Fro Transportation |
| 28 | Removing and dismantling of motor of EOT including Brake Linear Assembly, Gears, Wire rope using tools and labours etc. |
| 29 | Overhauling & Cleaning of Brake Linear, Brake Drum Assembly using Rustoline Cotton Waste Diesel, etc. including labour and material. |
| 30 | Providing and fixing of following Parts to EOT |
| 31 | New Brake Liner |
| 32 | New Electrical oil set for Clutch operation 10 clutch |
| 33 | On/off/up/down/left/right 10 way switch |
| 34 | Rope Guide |
| 35 | Wire Rope 10mm |
| 36 | Cable guide |
| 37 | Internal wiring of panel board with new contractors, connectors, lugs , etc |
| 38 | Assembling all parts together with test & trials. |
| 39 | Overhauling and Servicing of 3 Tonne EOT including dismantalling , cleaning, assembling & fixing with test & trial |
| 40 | Providing & fixing limit switch |
| 41 | Internal wiring of panel board with new contractors, connectors, lugs , etc |
| 42 | On/off/up/down 4 way switch |
| 43 | Assembling all parts with test and trial |
| 44 | JAW Contact |
| 45 | Trip Coil 110 V |
| 46 | Trip Coil 110 V |
| 47 | Limit Switch 2 NO + 3 NC |
| 48 | Limit Swithc 1 NO + 1 NC |
| 49 | Fuse BS2692 |
| 50 | Fuse VFT 11/3A |
| 51 | ABB, REJ 601 Relay Base Model |
| 52 | Breaker control Switch (TNC) |
| 53 | Master Trip Relay 110 V DC |
| 54 | Local Remote Switch |
| 55 | Service & Installation charges |
| 56 | Dismantling of following Sluice Valves |
| 57 | a) 300 mm |
| 58 | b) 400 mm |
| 59 | c) 450 mm |
| 60 | Cleaning of all Sluicevalves internal & external using tools labours diesel cotton waste etc |
| 61 | Lapping of Sluice Valve gate sheet rings to match body sheet rings using special lapping solutions and stones |
| 62 | Providing and fixing of following spares |
| 63 | a) Nutbolts with double washers |
| 64 | b) Rubber packings |
| 65 | c) T Bolts with Nuts |
| 66 | d) Gland packings |
| 67 | Assembling of following Sluice Valves |
| 68 | a) 300 mm |
| 69 | b) 400 mm |
| 70 | c) 450 mm |
| 71 | Colouring including red oxide and paint |
| 72 | Motor Rewinding 335 HP |
| 73 | Motor Disambling 335HP |
| 74 | Motor Housing 335HP |
| 75 | Motor bearing 335HP |
| 76 | Removing & Dismantling of Bearing Housing |
| 77 | 25HP motor rewinding |
| 78 | 2HP motor rewinding |
| 79 | 7HP motor rewinding |
| 80 | Removing & Fixing 25HP |
| 81 | Removing & Fixing 2HP |
| 82 | Removing & Fixing 07HP |
| 83 | 25HP LT statar repair |
| 84 | 2HP LT statar repair |
| 85 | 7HP LT statar reapir |
| 86 | Contactor 10Ampstar-delta |
| 87 | Contactor 18Amp star-delta |
| 88 | Relay 6 Amp star-delta |
| 89 | Realy 12Amp star-delta |
| 90 | L&T upto 10Amp Statar |
| 91 | 25Amp glass fuse |
| 92 | PVC tape |
| 93 | Aluminium Tape |
| 94 | DEO 5Amp |
| 95 | DEO 6Amp |
| 96 | Rabbur sheet |
| 97 | Oil 68 Castrol |
| 98 | Gress AP3 |
| 99 | High Temp Gress |
| 100 | Air Blower pump servicing, gressing & Oiling |
| 101 | Sluice valve Greessing 300mm |
| 102 | Sluice valve Greessing 250mm |
| 103 | Sluice valve Greessing 400mm |
| 104 | Sluice valve Greessing 450mm |
| 105 | Sluice valve Greessing 100mm |
| 106 | Sluice valve Greessing 150mm |
| 107 | Sluice valve Greessing 200mm |
| 108 | Sluice Valve checknut 100mm |
| 109 | Sluice Valve checknut 150mm |
| 110 | Sluice Valve checknut 200mm |
| 111 | Sluice Valve checknut 250mm |
| 112 | Sluice Valve checknut 300mm |
| 113 | Sluice Valve checknut 400mm |
| 114 | Sluice Valve checknut 450mm |
| 115 | S.V Spindle 100mm |
| 116 | S.V Spindle 150mm |
| 117 | S.V Spindle 200mm |
| 118 | S.V Spindle 250mm |
| 119 | S.V Spindle 300mm |
| 120 | S.V Spindle 400mm |
| 121 | S.V Spindle 450mm |
| 122 | Dismantling 100mm SV |
| 123 | Dismantling 150mm SV |
| 124 | Dismantling 200mm SV |
| 125 | Dismantling 250mm SV |
| 126 | Dismantling 300mm SV |
| 127 | Dismantling 400mm SV |
| 128 | AssemblingS.V 100mm |
| 129 | AssemblingS.V 150mm |
| 130 | AssemblingS.V 200mm |
| 131 | AssemblingS.V 250mm |
| 132 | AssemblingS.V 300mm |
| 133 | AssemblingS.V 400mm |
| 134 | AssemblingS.V 450mm |
| 135 | VT pump spider |
| 136 | VT pump Spider Rubber Bushing |
| 137 | Impeller |
| 138 | Ring Impller |
| 139 | Bearing sleeve |
| 140 | Coupling Half driver |
| 141 | Coupling half pump |
| 142 | Key coupling |
| 143 | Ball coupling |
| 144 | Nut shaft adjusting |
| 145 | Gasket |
| 146 | Gland |
| 147 | pipe column |
| 148 | bearing throttle |
| 149 | plate sole |
| 150 | flange top & Bottomcolumn pipe |
| 151 | strainer |
| 152 | collet impeller lock |
| 153 | coupling shaft |
| 154 | bearing lineshaft enclosed |
| 155 | Liner bowl |
| 156 | sole plate |
| 157 | Deflector |
| 158 | Deflector |
| 159 | Overhaulingof33kvindoortypeVCB1250amp |
| 160 | Overhaulingof33kvoutdoortypeVCB1250amp |
| 161 | Overhaulingof3.3kvindoortypeVCB650amp |
| 162 | Overhaulingof3.3kvindoortypeVCB1000 amp |
| 163 | Overhaulingof3.3kvindoortypeVCB1250 amp |
| 164 | Replacement of Vaccume Circuit Breaker spare |
| 165 | i)Vaccume Intrupter |
| 166 | ii)Tulip12Fingure |
| 167 | iii)Female Epoxy Spout |
| 168 | iv)Spring Charging Motor Mechanisam |
| 169 | v)Rackin /out Machanisam |
| 170 | vi)Under voltagecoil |
| 171 | vii)Trippingcoil |
| 172 | viii)Closingcoil |
| 173 | ix)PushOn/Offswitch |
| 174 | x)ContactArm |
| 175 | Overhaulingof3.3kvVaccumeContactor400 amp |
| 176 | Overhaulingof3.3kvVaccumeContactor600 amp |
| 177 | ReplacementofVaccumeContactorspare |
| 178 | i)JawContact |
| 179 | ii)Insulator |
| 180 | iii)FemaleEpoxySpout |
| 181 | iv)LimitSwitch |
| 182 | v)Auxilaryswitch |
| 183 | vi)Fuse |
| 184 | OverhaulingofACB1000amp |
| 185 | OverhaulingofACB1250amp |
| 186 | ReplacementofAirCircuitBreaker spare |
| 187 | i)Undervoltagecoil |
| 188 | ii)Trippingcoil |
| 189 | iii)Closingcoil |
| 190 | iv)SpringChargingMechanisam |
| 191 | v)AuxilarySwitch |
| 192 | Overhaulingof33KVMainIncomerPanel |
| 193 | Overhaulingof3.3KVMotorFeederpanel |
| 194 | Overhaulingof3.3KVMainIncomerPanel |
| 195 | TestingofMainIncomer/MotorFeederPanel |
| 196 | OverhaulingofRTCCPanel |
| 197 | Testing&CalibrationofRelay |
| 198 | RepairingABBmakeRelay |
| 199 | Overhaulingof33KVOutdoorCT |
| 200 | Overhaulingof33KVOutdoorPT |
| 201 | Replacementof33KVCurrentTransformer |
| 202 | i)IndoortypeCT |
| 203 | ii)Outdoortype CT |
| 204 | Replacementof33KVPotentialTtransformer |
| 205 | i)IndoortypePT |
| 206 | ii)Outdoortype PT |
| 207 | Replacementof33kvLightningArrester |
| 208 | i)IndoortypeLA |
| 209 | ii)Outdoortype LA |
| 210 | Replacementofindoortype3.3kvCT |
| 211 | Replacementofindoortype3.3kvPT |
| 212 | VCBBatteryChargerPanel |
| 213 | i)TestingofBatteryBankofVCB |
| 214 | ii)OverhoilingofBatteryChargerPanel |
| 215 | ReplacementofDryTypeBatteryBankofVCB |
| 216 | ReplacementofInverter |
| 217 | ReplacementofInverterBattery |
| 218 | i)100Ah |
| 219 | ii)200Ah |
| 220 | iii)250Ah |
| 221 | Painting of Switch yard Structure at Dhuktan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. |
| 222 | Painting of Switch yard Structure at Maswan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. |
| 223 | Painting of CLF BridgeStructure at Dhuktan WTP with one coat of Anti-Corrosive paint and over it Two Coat of Oil paintasdirectedbyEngineerinCharge,chargesinclude ScrappingofStructure,labouretccomplete |
| 224 | Painting of CRCA sheet of various Panel at Maswan HW & Dhuktan WTP with powder coated one coat of red lead paint and over it two coat enamel paint as directed by EngineerinCharge,chargesincludeScrappingof Structure,labouretccomplete |
| 225 | Painting of MS Structure with one coat of Anti-Corrosive paint and over it Two Coat of Oil paint as directed by EngineerinChargeinDhuktanWTP,chargesinclude ScrappingofStructure,labouretccomplete |
| 226 | ReplacementofInsulator |
| 227 | i)33kvOutdoorpostinsulator |
| 228 | ii)33kvIndoorinsulator |
| 229 | iii)3.3kvindoorinsulator |
| 230 | AllPolyPropyleneHTCapacitor |
| 231 | i)TestingofCapacitorBank |
| 232 | ii)ReplacementofCapacitorBank |
| 233 | iii)OverhoilingofCapacitorPanel |
| 234 | Supply,Errect&CommisioningofRelay |
| 235 | i)ABBOverVoltage |
| 236 | ii)ABBUnderVoltage |
| 237 | iii)ABBOverCurrent&EarthFault |
| 238 | iv)ABBMasterTrip |
| 239 | v)ABBMotorProtection |
| 240 | vi)ABBTripCircuitSupervision |
| 241 | vii)PowerFactorControl |
| 242 | viii)PLARelay |
| 243 | ix)AuxilaryRelay |
| 244 | x)AutomaticVoltageRegulation |
| 245 | Replacement of Copper BusBar |
| 246 | Replacement of Aluminium BusBar |
| 247 | Replacement of Annunciator |
| 248 | Replacement of Hooter |
| 249 | Replacement of Temprature Scanner |
| 250 | Replacement of MultiFuction Meter |
| 251 | Replacement of Ammeter |
| 252 | Replacement of Voltmeter |
| 253 | ReplacementofPushButton |
| 254 | ReplacementofPilotLamp |
| 255 | ReplacementofSelectorSwitch |
| 256 | ReplacementofElectronicTimmer |
| 257 | ReplacementofHourMeter |
| 258 | Servicing&Overhoilingofoutdoor GOD |
| 259 | Servicing&OverhoilingofoutdoorDOSet |
| 260 | TransformerOilFiltration |
| 261 | SupplyNewTransformer Oil |
| 262 | TransfomerPostInsulator |
| 263 | i)HTside |
| 264 | ii)LTside |
| 265 | TransformerBreather |
| 266 | i)ForHT Transformer |
| 267 | ii)ForLTTransformer |
| 268 | TransformerRewindinginFactoryincludingReplacement of Gasket, Painting of Inner & outer surface, To & Fro charges,loading&unloadingCharges |
| 269 | 60kvaTransformer |
| 270 | 100kvaTransformer |
| 271 | 200kvaTransformer |
| 272 | 415kvaTransformer |
| 273 | 630kvaTransformer |
| 274 | 750kvaTransformer |
| 275 | 1000kvaTransformer |
| 276 | TransformerOveningforimprovingmeggervaluein FactoryincludingReplacementofGasket,Paintingof Inner & outer surface, To & Fro charges, loading & unloadingCharges |
| 277 | 60kvaTransformer |
| 278 | 100kvaTransformer |
| 279 | 200kvaTransformer |
| 280 | 415kvaTransformer |
| 281 | 630kvaTransformer |
| 282 | 750kvaTransformer |
| 283 | 1000kvaTransformer |
| 284 | TransformerServicing&OverhoilingatSiteWashingof Coil by Oil, Attending minor leakages by replacing necessary gasket packing, tightening of Bushing & necessaryfitting,paintingoutersurface |
| 285 | 60kvaTransformer |
| 286 | 100kvaTransformer |
| 287 | 200kvaTransformer |
| 288 | 415kvaTransformer |
| 289 | 630kvaTransformer |
| 290 | 750kvaTransformer |
| 291 | 1000kvaTransformer |
| 292 | Servicing&OverhaulingofHTTransformerOLTC TestingofRTCC&OLTC RepairingTransformerTapChanger |
| 293 | Supply,Errect&CommisioningofTapPositionIndicator |
| 294 | Supply,Errect&CommisioningofOilTemperature IndicatorofHTTransformer |
| 295 | Supply,Errect&CommisioningofWindingTemperature IndicatorofHTTransformer |
| 296 | Supply,Errect&CommisioningofMagneticOilGuageof HTTransformer |
| 297 | Supply,Errect&CommisioningofBuchhlozRelayofHT Transformer |
| 298 | CarryingoutTestofEquipments |
| 299 | i)HighportTestofCable |
| 300 | ii)InsulationResistanceTestofTransformer/Motor |
| 301 | iii)WindingResistanceTestof Transformer/Motor |
| 302 | iv)EarthingTestof Transformer/Motor/Panel |
| 303 | v)MagneticBalancingTestofTransforme |
| 304 | vi)VectorGroupTestofTransformer |
| 305 | vii)PolarindexTestofTransformer |
| 306 | viii)ContactResistanceTestofVCB |
| 307 | ix)VibrationTestofMotor |
| 308 | Supply,Erect&CommisioningofCable |
| 309 | i)33Kv3core95Sq mmAlXLPE |
| 310 | ii)33Kv3core120Sq mmAlXLPE |
| 311 | iii)33Kv3core240SqmmAl XLPE |
| 312 | iv)33Kv3core400SqmmAl XLPE |
| 313 | v)4core50SqmmArmoured Al |
| 314 | vi)4core25SqmmArmouredAl |
| 315 | vii)3.5core95SqmmAl |
| 316 | viii)3.5core50Sq mmAl |
| 317 | ix)3core1SqmmAl |
| 318 | x)2core1SqmmAl |
| 319 | xi)1SqmmFlexible cable |
| 320 | xi)2core10SqmmAl |
| 321 | xii)3core10Sq mmAl |
| 322 | SupplyErrect&CommisioningofCableTermination Kit |
| 323 | i)33kv400SqmmIndoor |
| 324 | ii)33kv300SqmmIndoor |
| 325 | iii)33kv400Sqmmoutdoor |
| 326 | iv)33kv300Sqmmoutdoor |
| 327 | v)3.3kv240SqmmIndoor |
| 328 | vi)3.3kv120SqmmIndoor |
| 329 | vii)3.3kv240SqmmOutdoor |
| 330 | viii)3.3kv120SqmmOutdoor |
| 331 | SupplyErrect&CommisioningofCableStraightJointKit |
| 332 | i)33kv400 Sqmm |
| 333 | ii)33kv300 Sqmm |
| 334 | iii)3.3kv240 Sqmm |
| 335 | iv)3.3kv120Sqmm |
| 336 | Supply,Erect,CommiosioningofExhaustFanHeavy Duty 450mm,1400RPM |
| 337 | SupplyErect,Commiosioningof24WEnergyEfficient LED Tube |
| 338 | SupplyErect,Commiosioningof40WEnergyEfficient LED StreetLight |
| 339 | SupplyErect,Commiosioningof60WEnergyEfficient LED StreetLight |
| 340 | SupplyErect,Commiosioningof100WEnergyEfficient LEDFlood Light |
| 341 | SupplyErrect&CommisioningContactor |
| 342 | i)Threepole63amp |
| 343 | ii)Threepole100amp |
| 344 | iii)Fourpole100 amp |
| 345 | iv)Fourpole200amp |
| 346 | v)Fourpole300 amp |
| 347 | vi)Fourpole400 amp |
| 348 | vii)Fourpole600amp |
| 349 | SupplyErrect&CommisioningMCCB |
| 350 | i)Threepole100amp |
| 351 | ii)Threepole200amp |
| 352 | iii)Threepole300amp |
| 353 | iv)Threepole400 amp |
| 354 | v)Threepole600 amp |
| 355 | SupplyErrect&CommisioningMCB |
| 356 | i)Singlepole6to32amp |
| 357 | ii)Singlepole40to64amp |
| 358 | iii)Doublepole6to32amp |
| 359 | iv)Doublepole40to64amp |
| 360 | v)Threepole6to32amp |
| 361 | vi)Threepole40to64amp |
| 362 | vii)Fourpole6to32amp |
| 363 | viii)Fourpole40to64amp |
| 364 | SupplyErrect&CommisioningofSwitch Gear |
| 365 | i)Fn/sfu100 amp |
| 366 | ii)Fn/sfu200amp |
| 367 | iii)Fn/sfu250 amp |
| 368 | iv)Fn/sfu300 amp |
| 369 | v)Fn/sfu400amp |
| 370 | vi)Fn/sfu600amp |
| 371 | SupplyErrect&CommisioningofFuse |
| 372 | i)5 amp |
| 373 | ii)10amp |
| 374 | iii)20amp |
| 375 | iv)30amp |
| 376 | v)50amp |
| 377 | vi)100amp |
| 378 | vii)200amp |
| 379 | SupplyErrect&CommisioningofD.O.Fuse |
| 380 | i)10amp |
| 381 | ii)25amp |
| 382 | iii)50amp |
| 383 | SupplyErrect&CommisioningofIndoorFuse |
| 384 | i)3.3kv10amp |
| 385 | ii)3.3kv20amp |
| 386 | iii)3.3kv30amp |
| 387 | iv)33kv50amp |
| 388 | v)33kv70amp |
| 389 | SupplyErrect&CommisioningofHRCFuse |
| 390 | i)6 amp |
| 391 | ii)10amp |
| 392 | iii)16amp |
| 393 | iv)32amp |
| 394 | v)64amp |
| 395 | SupplyErrect&CommisioningofChangeOverSwitch |
| 396 | i)100amp |
| 397 | ii)200amp |
| 398 | iii)300amp |
| 399 | iv)400amp |
| 400 | SupplyAlCableLugs |
| 401 | i)50mm |
| 402 | ii)95mm |
| 403 | iii)120mm |
| 404 | iv)185mm |
| 405 | v)240 mm |
| 406 | vi)300mm |
| 407 | vii)400mm |
| 408 | SupplyAlCableGland |
| 409 | i)95mm |
| 410 | ii)120 mm |
| 411 | iii)185mm |
| 412 | iv)240mm |
| 413 | v)300 mm |
| 414 | vi)400mm |
| 415 | 5ampelectricpointwithallmaterial |
| 416 | 16ampelectricpointwithall material |
| 417 | 32ampelectricpointwithall material |
| 418 | 64ampelectricpointwithall material |
| 419 | BoilerSuite |
| 420 | RainySuite |
| 421 | SafetyShoes |
| 422 | Hand Gloves |
| 423 | GumBoot |
| 424 | SafetyHelmet |
| 425 | SafetyBelt |
| 426 | WD40(500ml) |
| 427 | CRC(500ml) |
| 428 | BearingOil |
| 429 | BearingGrease |
| 430 | BearingHighSpeedGrease |
| 431 | Providing & Fabrication of MS Structural work which is essential for Motor, Transformer, VCB, CLF,and any other WTP equipments as directed by Engineer in charge, charges include Cutting, Welding, hoisting, bolting, fixing, erectinginpositionasrequiredandapplyonecoatof Anti-Corrosive paint and over it two coat of oil paint etc complete |
| 432 | Providing & Fabrication of CRCA Sheet for boxes, panel boxes etc include cutting, bending, welding, drilling, rivetingwithdulypowdercoatedonecoatofredlead paint&twocoatofenamelpaintetccomplete |
| 433 | 335HP VTPumpJyoti/Kirloskar/ FlowMore Make@Maswan&Dhuktan |
| 434 | Re-erectionandLevelingof Pump Removingmotor |
| 435 | Dismantling,Cleaning,overoilingandPump assembly Re-erectionofMotor Totalshaft runoutcheck&Epoxypaintingwithtwocoatredoxide |
| 436 | Checknutofimpeller |
| 437 | Copperlockwasher |
| 438 | Impeller |
| 439 | Impellerkey |
| 440 | Wearingring |
| 441 | Shaftsleeveofbellmouth |
| 442 | cutleesbearingstainlesssteel |
| 443 | Muff-couplingstainlesssteel |
| 444 | Split-ringstainless steel |
| 445 | Sleevestainless steel |
| 446 | Shaftstainlesssteel |
| 447 | Headshaft |
| 448 | Impeller shaft |
| 449 | staffingbox |
| 450 | staffingbox packing |
| 451 | Staffingboxbrasssleeve |
| 452 | StaffingboxGlandsleeve |
| 453 | Staffingboxpackingcover |
| 454 | SSnutboltwithwasher |
| 455 | Balancingof impeller |
| 456 | Totalcouplingsetwithreachedlock |
| 457 | Coppertub |
| 458 | Reachedpin |
| 459 | Reachedcouplingwithlock |
| 460 | Reflector |
| 461 | Bearinghousingcovers |
| 462 | BearingSKF Make |
| 463 | G Bearing |
| 464 | 20 mm dia.GateValve |
| 465 | 20mm dia.G.I Drainpipe |
| 466 | 20mm dia.AirValve |
| 467 | CouplingBush |
| 468 | Couplingnutbolt |
| 469 | Gasket10mmthick |
| 470 | PressureGuage |
| 471 | 5HP to 30 HP CentrifugalPump anyMake@ Maswan/ Shelwali |
| 472 | Removing motor,Dismantling , Cleaning , overhauilingPumpassembly,Re-erectionofMotor&pump Checknutofimpeller |
| 473 | Impeller |
| 474 | Impellerkey |
| 475 | Wearingring |
| 476 | Sleevestainless steel |
| 477 | Shaft key |
| 478 | Headshaft |
| 479 | Impeller shaft |
| 480 | StaffingboxGlandsleeve |
| 481 | Staffingboxpackingcover |
| 482 | Balancingof impeller |
| 483 | Reachedcouplingwithlock |
| 484 | Bearinghousingcovers |
| 485 | BearingSKF Make |
| 486 | CouplingBush |
| 487 | Couplingnutbolt |
| 488 | Gasket05mmthick |
| 489 | Sluice Valve 350mm @ Maswan & Shelwai Repair work |
| 490 | Removing,Dismentling,cleaning&Re- erectionofValve |
| 491 | CheckNut |
| 492 | NutBolt |
| 493 | Spindle |
| 494 | O Ring |
| 495 | Wedge |
| 496 | RefluxValve350mm at Maswan& Shelwali Reapir work Removing,Dismentling,cleaning&Re- erectionofValve |
| 497 | NutBolt |
| 498 | O Ring |
| 499 | Wedge |
| 500 | ButterflyValve 250mm@Maswan & Shelwali Removing,Dismentling,cleaning&Re- |
| 501 | NutBolt |
| 502 | O Ring |
| 503 | GearBox at Maswan& Shelwali Removing,Dismentling,Cleaning&Re-erectionofGearBox |
| 504 | NutBolt |
| 505 | GearORing |
| 506 | WormGear |
| 507 | HelicalGear |
| 508 | Gear Shaft |
| 509 | Roller Bearing |
| 510 | Washer |
| 511 | ActuatorofValve at Maswan&Shelwali Removing,Dismentling&Re-erectionof Actuator |
| 512 | RewindingofMotor |
| 513 | LimitSwitch |
| 514 | TorqueSwitch |
| 515 | HelicalPinion Gear |
| 516 | LockNut |
| 517 | FlashMixer/AlumAgigator at Maswan & Shelwali |
| 518 | Rewindingof3 HPMotor |
| 519 | Rewindingof5 HPMotor |
| 520 | Rewindingof7.5HP Motor |
| 521 | Servicing&overhoilingofGearBox |
| 522 | Drive Shaft |
| 523 | RadialFlow Paddle |
| 524 | Coupling |
| 525 | RewindingofMotor |
| 526 | Upto2.5 HP |
| 527 | Above2.5HPto 5HP |
| 528 | Above5HPto7.5HP |
| 529 | Above7.5HPto 10HP |
| 530 | DOLstarterfor Motor |
| 531 | Upto2.5 HP |
| 532 | Above2.5HPto 5HP |
| 533 | Above5HPto7.5HP |
| 534 | Above7.5HPto 10HP |
| 535 | StarDeltastarterforMotor |
| 536 | Above15HP to20HP |
| 537 | Above20HP to25HP |
| 538 | OverhaulingofMotor |
| 539 | Upto2.5 HP |
| 540 | Above2.5HPto 5HP |
| 541 | Above5HPto7.5HP |
| 542 | Above7.5HPto 10HP |
| 543 | ClarifloculatorBridg Shelwali |
| 544 | SprocketWheel |
| 545 | SprocketRollerChain |
| 546 | DrivingWheel |
| 547 | RubberScrapper |
| 548 | ReductionGearBox |
| 549 | SelfalignBearingofwheel |
| 550 | ThrustBearingof Bridge |
| 551 | RadialBearingofBridge |
| 552 | EOTCrane at Maswan&Shelwali DismentlingCrane,Gearbox&Motor Re-AssemblingCrane,Gearbox&Motor |
| 553 | Reverse-ForwardAssembly |
| 554 | Up-DownAssembly |
| 555 | Brake Coil |
| 556 | Brake liner |
| 557 | Brake shoe |
| 558 | Clutchplatespring |
| 559 | RopeDrum |
| 560 | WireRope |
| 561 | HelicalGear |
| 562 | PinionGear |
| 563 | LimitSwitch |
| 564 | Auxilary Contact |
| 565 | Remoteof Crane |
| 566 | 15HPAirCompressor at Maswan /Shelwali |
| 567 | RemovingofAirCompressor&Motor ReassemblingofAirCompresor&Motor |
| 568 | HP/LPPiston assembly |
| 569 | PistonRing |
| 570 | ConnectingRod |
| 571 | HP/LPValve assembly |
| 572 | Crank Shaft |
| 573 | Oil seal |
| 574 | HP/LP AirHead assembly |
| 575 | Bush |
| 576 | V -Belt |
| 577 | Gasket |
| 578 | 50mm dia.SluiceValve |
| 579 | 50mm dia.RefluxValve |
| 580 | 50mmdia.SolenoidvalveAssembly |
| 581 | FlashMixer at Maswan /Shelwali |
| 582 | Removing,Dismentling&CleaningofFlash MixerwithMotor &Gearbox ReassemblingofFlashMixerwithMotor&Gearbox |
| 583 | Oil seal |
| 584 | Sleeve |
| 585 | O ring |
| 586 | Wormgear |
| 587 | Bearing |
| 588 | Piniongear |
| 589 | MotorFan cover |
| 590 | Gear pin |
| 591 | Bearing Housing |
| 592 | AlumAgigator at Maswan /Shelwali |
| 593 | Oil seal |
| 594 | O ring |
| 595 | Wormgear |
| 596 | Bearing |
| 597 | Piniongear |
| 598 | Gear pin |
| 599 | Bearing Housing |
| 600 | Bearing Housing |