Supply Of Material For Construction Of Kitchen Room For Government High School At Hunashyala P.Y Village Of Mudalagi Taluka. - Broken Stone Aggregate 20 Mm Size,,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 40 Mm Size,,Coarse Sand (Zone Iii),,Portland Cement,.,Mixer (Concrete) - 1 Cum Capacity.,,Add Watering Charges At 1 % On Material.,,Add Sundries Charges At, 1 % On Material.,Over Head, & Other Miscellaneous Charges,Plasticizer / Super Plasticizer.,.,Hom Of Vibrator 0.71 Days.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Jungle Wood Runners And Plank.,,Casurina Poles 75 - 100 Mm Dia.,Add Handling Loading And Unloading At 2% On Material.,,Tmt Bars Fe 500,.,Binding Wire,.,Rubble Stones.,,Bond Stone 20 X 20 X 45 Cm.,,Mixer (Concrete Small Used In Culvert.),Stone At Quarry-1,Laboratory Asst. (Sslc Passed)/Mate/Supervisor,,Add For Scaffolding 5 Per Cent Of Cost Of Labour And Material,Add Sundries Charges At 1 % On Labour.,,Add Watering Charges At 1 % On Labour.,,Ms Pipes Of 80 Mm To 100 Mm Dia,,Rms Gusset Plate,,Corbon Electrodes.,,Burnt Bricks Class 35 (Non Modular).,,Casurina Poles 100 - 150 Mm.,,Add Handling Loading And Unloading At 1% On Material.,,Add Sundries Charges At, 2 % On Material,Welder Grade I,,Hom Of Cutting And Grinding Machine.,,Tools And Plants At 2% Of Material,Unit Cost As Per The Specification.,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Add Cutting And Other Wastage 5%,,Hom Of Machinaries For Planing,.,M.S Rods,,Ms Flat,.,Fitter Class 1,Add Hom Of Welding And Grinding Machine At 4% On Material,,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,,Painter Class I.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Enamel Metal Paint.,,Add Brush At 1% On Cost Of Paint.,,Aluminium Window Frame Section 1.20 Mm Thick,,Nylon Rollers,.,Rubber Beading For Shutters Beading.,,Pvc Edge Beading.,Alluminium Tower Bolt - 20 Cm.,.,Alluminium Handles - 15 Mm.,.,Cleat Angles_,Chrominum Plated Screws.,.,A 5.50 Mm Thick Plain Glass,Add 15% Wastage For Glass-02,Fabricator-01,Mason Class I (With Tools)-02,Add Hom Of Welding And Grinding Machine 2% On Material-02,Vitrified Tiles 600 X 600 Mm,Mathi/Nandi Wood Scantling,,Dry Distemper.,.,Whitening,.,Add Brush, Putty Glue At 5% On Cost Of Paint,Plastic Emulsion Paint-02,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Enamel Paint,.,Mechanic Class Ii / Mechanic Hmp Grade I/Eme Grade,Hom Of Welding And Grinding Machine.,,Add-01,Lumpsum Material