| 1 | Earth work in hard soil or gravelly soil within 50m. initial lead and 1.5m initial lift including roughdressing and breaking clods to maximum 5cm to 7cmand laying in layers not exceeding 0.3m in depth and asper the direction of the Engineer-in-charge. |
| 2 | Supplying, filling in foundation and plinth with sand in 22.5 cm (9”)thicklayersincludingwateringandrammingwithcost, conveyance, royalties and taxes of sand with labour and T&P requiredfortheworketc.complete(Measurementwillbe taken on finished compacted section only). |
| 3 | Cement concrete of proportion (1:4:8) in foundation and floors using 4cm (1½”) size clean hard black crusher broken granite stonemetalofapprovedqualityandfromapprovedquarry including hoisting,lowering and laying concrete inlayers not exceeding15cm.(6”)thicktotherequiredlevelramming,watering,curingetc.completeincludingcost,conveyance,royaltiesandexcludingGSTofallmaterialswithalllabour,cessandT&Prequiredfortheworketc.completeinall respect. |
| 4 | R.C.C.workM-20grade using20mmand10mmsizeblack hard crusher broken granite chips including hoisting lowering layingandcentringshutteringandfinishingtheexposed surface smooth providing groves or beds wherever necessary includingcost,conveyance,royaltiesandexcludingGSTand costofallmaterialsandlabourwithT&Prequiredforthe worketc.completeinallrespectexcludingthecostofM.S. RodsorTorsteelandbindingwiresandlabourchargefor bending binding and tying grills as directed by the Engineer – in charge in Ground Floor. |
| 5 | Ground floor |
| 6 | (a) Column base |
| 7 | (b) Plinth band |
| 8 | (c) Lintel |
| 9 | (d) Column and beam |
| 10 | (e) Sun shade and Chajja |
| 11 | (f) Roof Slab |
| 12 | Supplying, fitting andplacinguncoatedHYSDbar reinforcement complete as per drawing and technical specification including cost, conveyance and excluding GST of allmaterialswithlabour, cessand T&Petc. requiredforthe work complete. |
| 13 | Ground floor |
| 14 | FlyAshbrickmasonryincementmortar(1:6)inPlinth& Foundation work using fly ash bricks of23cm x 11cm x 8cm sizehavingacrushingstrengthofnotlessthan75kg/cm2 withdimensionaltolerance±2%includingsplayscutting circularmouldingchamferingandcorbelling andsimilarsuch typeofworkswithallnecessaryprojectionswateringand curing including cost, conveyance, royalties and excluding GST of all materials with all labour, cess and T&P required for the work complete in all respect in all floors. |
| 15 | FlyAshbrickmasonryincementmortar(1:6)in Super strucutre work using fly ash bricks of23cm x 11cm x8cmsizehavingacrushingstrengthofnotlessthan75kg/cm2withdimensionaltolerance±2%includingsplays cutting circular moulding chamfering and corbelling and similarsuch type of works with all necessary projections watering and curing including cost, conveyance, royalties and excluding GST of all materials with all labour, cess and T&P required for thework complete in all respect in all floors. |
| 16 | Ground floor |
| 17 | 6mmthickcementplaster(1:4)toRCCsurfacesfinished smoothincludingcloseddeepchippingandslurrytreatment including watering and curing with cost, conveyance, royalties andexcludingGSTofallmaterialswithalllabourandT&P required for the work etc. complete in all respect. |
| 18 | Ground floor |
| 19 | 12mm(5/8”)thickcementplaster(1:6)finishedsmoothto inside rough surfaceof 9”/10” thick brick wallsafter rakingoutthejointsincludingwateringandcuringwithcostwithcost, conveyance, royalties and excluding GST of all materialswith all labour, T&P required for the work etc. complete. |
| 20 | Ground floor |
| 21 | 16mm(½”)thickcementplaster(1:6)finishedsmoothto outside smooth surface of brick walls after raking out the jointincluding watering and curing with cost, conveyance, royaltiesandexcludingGSTofallmaterialswithalllabourandT&Prequired for the work etc. complete in all respect. |
| 22 | Ground floor |
| 23 | Supplying, Fitting and fixing Vitrified tiles in Floors of size 600mm x 600 mm of approved make conforming to IS13755 laid on 25mm thickcementmortar[1:1] fillingjoinedwith whitecementofapprovedqualityincludingallmaterials, labour, excludingGST,T&Petc.requiredforthe work all complete as per direction ECI. [For New work only] |
| 24 | Ground floor |
| 25 | Fixing Vitrifiedtiles in dados, skirting and risers of steps on 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including rubbing and polishing completeasper direction of Engineer-in-charge. |
| 26 | Ground floor |
| 27 | Fixing industrial chequred tiles in Floors, Treads on steps & landing on 25 mm thick bed of cementmortar[1:1]joinedwithneat cement slurry mixed with pigment to match the shade of the Tilesincludingrubbingandpolishing complete including rubbingandpolishingetc. completeincludingwateringand curing with cost, conveyance, royalties and excludingGST of all materials with all labour and T&P required for the work etc. complete in all respect. |
| 28 | Ground floor |
| 29 | Fixing Ceramic Glazed walltiles in Dado, Skirting and rises of steps on 12 mm thick cementmortar [1:3] joinedwithneatcement slurrymixedwithpigmenttomatchtheshadeoftheTiles includingrubbingandpolishingcomplete includingrubbing and polishing etc. complete including watering and curing with cost, conveyance, royalties and excluding GST of all materials with all labour and T&P required for the work etc. complete in all respect. |
| 30 | Ground floor |
| 31 | Wall Priming onecoats on new work with wall water bound primer ofapproved shadeas per direction of Engg-in-Charge. |
| 32 | Ground floor |
| 33 | FinishinginsidewallswithDistemperofapprovedshadeon new work two coats to give an even shade including watering and curing with cost, conveyance, royalties and excluding GST of all materials with all labour and T&P required for the work etc. complete in all respect. |
| 34 | Ground floor |
| 35 | Painting two coats with weather seal coat paint over a coat of primer with water bound cement paint including cost, conveyance, excluding GST of all materials, labour and T&P etc. complete. |
| 36 | Ground floor |
| 37 | Supplying ,fitting, fixing of factory made single leaf rigid FRP composite door shutter of 32mm thick,laminated with to GRP skins with wood grain finished fabricated using UV stabilized Isopthalic gal coat and one layer of 450 gsm E-glass chopped strand mat (CSM) impregnated with orthopathalic ,polyster resin including fitting of all fixtures like hinges,towerbolt,handle,aldrop etc with cost,conveyance and taxes of all materials and labour etc. complete. |
| 38 | Ground floor |
| 39 | Supply fitting and fixing MS grill with Iron work wrought and put up in window grating including drilling holes in choukathas etc. complete as per direction of Engg-in-Charge . |
| 40 | Ground floor |
| 41 | Enamel Painting two coats with enamel paint over one coat of primer of approved quality etc. complete as per direction of Engg-in-Charge . |
| 42 | Ground floor |
| 43 | Laying fixing of precast ring of 0.9mtr dia , 0.3mtr heightand 0.05 mtr thick with all fitting. |
| 44 | ELECTRIFICATION |
| 45 | Recssed wiring to light point & Exhaust fan point with 1.5 sqmm FR PVC Insulated single core multistandard copper conductor of ISI marked with 20mm dia non metalic PVC flexible conduit with 5A ,250V modular type switch of ISI marked & ceiling rose of ISI markedmounted on MS BOXhavingfront back light cover of suitable size, MS box with 1.5 sqmm FR PVCinsulated single core multistrand copper conductor and earth wire including all accessories and connection as per direction of Engineer in charge(make of wire=Finollex/L& T/Anchor/Havels/V-guard/Great white)(deducting the cost of S/Fof 100mmx100mmx60mm M.S Box with Backlite cover-1no)Group-A(1.1.1.1-1.24.2) |
| 46 | -do- Group-B(1.1.2-1.24.2) |
| 47 | -do- Group-C(1.1.3 - 1.24.2) |
| 48 | Ressed wiring to Fan point in Group-B |
| 49 | S/F of 18 SWGfollowing size of modular GI box along with accessories in recess wiring including cutting the wall and making board thesame in case of recess conduit as required(1.24) 2 module. |
| 50 | do.......6 Module |
| 51 | do.......12 Module |
| 52 | S/F of 5 amp switch and 5A socket( Modular type)out let of make Anchor/Havells on existing board. |
| 53 | Wiring for circuit/sub main wiring alongwith earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked confirming to IS-694/1990 in 20mm dia non metallic heavy duty flexible conduct 1.6mm in recessed PVC conduit as required (Make of wire-Finolex/L & T /Anchor/Havels/V-guard) 2x1.5sqmm + 1x1.5sqmm(1.8.1) |
| 54 | do- 2x2.5sqmm +1x1.5sqmm(1.8.2) |
| 55 | do- 2x4sqmm +1x1.5sqmm(1.8.3) |
| 56 | S/F of \"B\" series SP MCB of 6amp rating 240volt B series MCB for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection testing and commissioning etc as required single pole(SP)(2.6.1) |
| 57 | S/F of batten holder BK angle holder ISI marked including connection etc instead of celling rose(1.29-1.28) |
| 58 | S/F of 3nos 5 amp switch and 3nos 5A socket(modular type) out let of make Anchor/Havells on existing board. |
| 59 | Supply ,Installation,Testingand commissioningof 48\"\" A.C ceiling fanwithout regulator including allconnection complete.(Make:-Usha/Crompton / Havells/Anchor/ Orient/Polycab ) |
| 60 | S/F of electric step ceiling fan regulater in existing switch box including connetion with 1.5 sqmm FR pvc insulated single core multistrand copper conductor earthing the regulator as required(1.38) |
| 61 | S/Fof 10Watt LED Bulb ( Make -Crompton/ Havells/ HPL/Philips/Polycab) |
| 62 | INTERNAL AND EXTERNAL PHD WORK |
| 63 | Laying of 110mm nominal diameter UPVC sewer line including cost of materials. |
| 64 | Supplying, fitting and fixing of 500 liter capacity double layer rotational moulded cylindrical vertical water storage tank (ISI marked)alongas per specification and direction of engineer in charge. |
| 65 | Providing & Fixing to walls/floor the following nominal diameter pipe, fittings including cost of pipe, making good the damage, etc. |
| 66 | (a) 25mm dia PVC pipe in all floors |
| 67 | (b ) 15mm dia PVC pipe in all floors |
| 68 | Supply, fitting and fixing of C.P. screw down bib cock (TAP) of 15mm diameter in ground floor |
| 69 | Supply,fittingandfixingof CPconcealedscrewdownstopcockof15mm diameter. |
| 70 | Supply, fitting and fixing of wash hand basin with hole (size 550x400mm)including fixing CP brass waste, fixing of 32mm PVC waste pipe, fixing 15mm dia CP pillar cocks, fixing 12mm dia connection pipe & water connection etc. complete including cost of all materials in ground floor and first floor as per specification and direction of engineer in charge. |
| 71 | Fitting and fixing of porcelain E.W.C with P-trap Size 580x440mm in CC(1:5:10)using 40mm size cbhg metal including cost of materials in ground floor and first floor as per specification and direction of engineer in charge as per specification and direction of engineer in charge. |
| 72 | Supply, fitting and fixing ofPVC low level 10lit capacity cistern with complete fixtures, all complete in ground floor and first floor as per specification and direction of engineer in charge. |
| 73 | Supply, fitting and fixing of following components/assesories at proper places, all complete in ground floor and first floor as per specification and direction of engineer in charge. |
| 74 | (a) 110mm PVC SWR coupler |
| 75 | (b) 110mm plain PVC tee |
| 76 | (c ) 110mm pipe clip |
| 77 | (d) 110mm PVC vent cowl |
| 78 | (e) 110 mm dia plain bend |