tender for Soil investigation, Design and Supply of all materials, labour, T&P etc. complete required for completion of following works of “Nagar Palika Parishad Kasganj Water Supply Scheme”:i) Construction of Over Head Tank,Pump house, Boundary wall with gate, Staff quarter, LCS Room, Site Development, Approach Road, Repairing of Over Head Tank & CWR Cum Pump House.ii) Laying & Jointing of Rising Main, Water Supply Distribution Network, House Connections.iii) Construction of Tube Wells including PLC SCADA and automation of all Tube Wells & OHT as per specifications in tender document complete in all respectThe scope of work includes commissioning, testing, trial & run, defect liabilities and handing over the complete works of “Nagar Palika Parishad Kasganj Water Supply Scheme” with its appurtenant works to Nagar Palika Parishad Kasganj, Distt. Kasganj, (U.P.) Sl. No. Item Description 1 CIVIL WORKS 2 ESTIMATE FOR PUMP HOUSE IN ZONE 3 Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (1.8x1.2x3.0)m as per departmental type design and drawing (drawingno‐D‐2)andasperthe specificationsforcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer ‐in ‐ charge. 4 Rebore tubewell platform and existing pump house plaster, painting & Pointing etc. completed. 5 Rising Main 6 Supply of ISI mark DI K-7/K-9 S&S pipes & specials (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality) including supply & fiing of specials with all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading. stacking etc. complete as directed by Engineer-in-charge. 7 150mm dia D.I Class- k9 8 200mm dia D.I Class- k7 9 200mm dia D.I Class- k9 10 250mm dia D.I Class- k7 11 Excavation Work 12 Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer ‐in ‐charge. 13 ordinary soil 14 Valve Chamber 15 Supply of following size of D.I.. D/F sluice valves as per I.S. 780-1960 tested to 10 Kg/Sq.m fixing in pipe line trenches, jointing and testing complete. 16 150mm dia D.I Class- k9 17 200 MM dia D.I CLASS- K9 18 250 mm dia D.I Class- k9 19 Supply of all materials, labour T&P and construct masonary type sluice valve chamber. 20 Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 21 150mm dia D.I Class- k9 22 200mm dia D.I Class- k7 23 200mm dia D.I Class- k9 24 250mm dia D.I Class- k7 25 Carting, laying and jointing of the following sizes of sluice valveinto the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 26 150mm dia D.I Class- k9 27 200mm dia D.I Class -k9 28 250mm dia D.I Class- k9 29 Dismantling and reinstatement of following type of road surfaces for laying of pipe line including sorting out of serviceable material and disposal of unserviceable materials. 30 Dismantling of Interlocking Road 31 Reinstatment of Interlocking Road (with 40% new tiles and 60% used old tiles) 32 Dismantling of C.C. Road 33 Reinstatment of C.C. Road 34 Dismantling Bituminous surface 35 Reinstatement Bituminous surface 36 Dismantling of BOE Road 37 Reinstatement of BOE road 38 R.C.C Overhead Tank 39 Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging min 0.6m above ground level with main components, soil testing and assuming bearingcapacity of soil as 8 MT, including cost of supply of design and drawings. All the water retaining components of OHT shall be casted in M‐30 grade cement concrete and minimum grade of concrete of foundation and staging should be M‐25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456 Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part‐III for wind load on structure and including 1M wide RCC doglegged staircase with separate coloumns, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia,Ultra Sonic Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309‐1969 and ISS 3013‐1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet(300mm), outlet(300mm), overflow and washout as per latest / relevant I.S. specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.‐ 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats. 40 1200 Kl /18M Staging 41 1200 Kl /16M Staging 42 1100 Kl /20M Staging 43 Testing Bearing Capicity of soil. 44 Repairing of 750 kl /19 m staging over head tank 45 Repairing of 2100 kl cwr cum pump house 46 Distribution System 47 Supply of High Density Polyethylene Pipes & electro-fusion specials (HDPE (PN-6)/PE-100), confirming to IS 4984 / 14151 / 12786 / 13488 (and other related I.S. codes) in coils / standard lengths with necessary jointing material like electro-fusioncoupler for Joints/Junctions , flanged joint, including all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading & stacking the same in covered shade duly protecting from sunrays & rains etc. complete as directed by Engineer-in-charge. 48 HDPE PIPE PE-100, PN-6 49 90 mm dia 50 110 mm dia 51 125 mm dia 52 140 mm dia 53 160 mm dia 54 D.I. K-7 Pipe 55 200 mm dia 56 250 mm dia 57 300 mm dia 58 350 mm dia 59 400 mm dia 60 Carting laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 61 HDPE PIPE PE-100, PN-6 62 90 mm dia 63 110 mm dia 64 125 mm dia 65 140 mm dia 66 160 mm dia 67 D.I. K-7 Pipe 68 200 mm dia 69 250 mm dia 70 300 mm dia 71 350 mm dia 72 400 mm dia 73 Distribution System - Pipeline Excavation 74 Distribution System - Connections 75 Provision for Single Tap making ferrule house connection in 90 to 160 mm dia distribution main with fixing of saddle pieces, connection fittings, GM ferrule of 15mm dia including brass tape with welded, 20mm dia (OD) HDPE pipe (12.5 kg/cm2) and 20 mm dia (OD) G.I. pipe class B upto house holder also including excavation of trenches, supply of all fittings maerials, labour, T&P etc. all work complete but excluding dismantling and reinstatement of all type roads as per direction of engineer incharge. 76 House service connections 77 For 90mmto 110mm dia 78 For 125mm to 160mm dia 79 For 180mm to 250mm dia 80 For 300mm dia 81 For 350mm to 500mm dia 82 Sluice valve chamber (masonry Type) - dia upto 200 mm ‐ 1000 (L) x 1200 (W) x 1300 (H) mm 83 Sluice valve chamber (surface box Type) 84 Sluice valve chamber (surface box Type) - Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) 85 Air Valve Chamber 350 (L) x 350 (W) x 500 (H) mm 86 D.I.. D/F Sluice/Scour valves as per I.S. 780 suitable for a working pressure of 10 Kg/Sqm. 87 Sluice valve ‐ 350 mm dia 88 Sluice valve ‐ 300 mm dia 89 Sluice valve ‐ 250 mm dia 90 Sluice valve ‐ 200 mm dia 91 Sluice valve ‐ 150 mm dia 92 Sluice valve ‐ 125 mm dia 93 Sluice valve ‐ 100 mm dia 94 Sluice valve ‐ 80 mm dia 95 Scour Valve 96 Scour valve ‐ 80 mm dia 97 Air valve 20 mm dia 98 Carting from store to site of work, lowering, fixing and jointing of following fittings in trenches. 99 D.I. Sluice valve 100 Sluice valve ‐ 350 mm dia 101 Sluice valve ‐ 300 mm dia 102 Sluice valve ‐ 250 mm dia 103 Sluice valve ‐ 200 mm dia 104 Sluice valve ‐ 150 mm dia 105 Sluice valve ‐ 125 mm dia 106 Sluice valve ‐ 100 mm dia 107 Sluice valve ‐ 80 mm dia 108 Scour Valve 109 Scour valve ‐ 80 mm dia 110 Air valve 20 mm dia 111 Construction of 1.5 m high and 230 mm thick boundary wall with 300 mmx300 mm thick pillar made in Brick masonry in 1 cement and 4coarse sand mortar, the spacing between two pillar should not be more than 3.5m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer ‐in ‐ charge. (Drawing No.D‐1) 112 Boundary Wall (for Campus Area) 113 Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm th. around RCC, as per departmental type design and drawing (Drawing No. D‐1) and as per specifications laid down in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer‐in‐charge. 114 MS Gate 115 ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer ‐in ‐charge. 116 Inter Locking Pavement for Approach Road 117 Drain for campus 118 Construction of LCS ROOM 119 Provide all materials labour, T&P etc. and construct single room staff quarter / office room at water works site identified by the Engineer‐in‐charge as per department type design and drawing and specifications of civil works laid down in the bid document, includingallmaterial labour,T&Petccompleteforproper completion of work as per instructions of Engineer ‐in ‐charge. (Drawing No.D‐7) Extra depth for Site conditions to be added 120 STAFF QUARTER 121 E&M WORKS 122 Construction ofTW No 1 (Rebore) of Zone 1C 123 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 124 Transportation, Erection and Dismantling of Rig Machine 125 Drilling by RC/DC Rig Machine 600 mm dia 126 0 to 65 mtr. deep 127 65 to 100 mtr. deep 500 mm dia 128 100 to 130 mtr. 500 mm dia 129 Tubewell Assembly 130 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 131 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 132 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 133 Supply of pea gravel 134 Logging of bore hole by departmental / approved electric logger 135 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 136 Lowering of 300mm dia pipe from GL to 60m deep BGL. 137 Lowering of 200mm dia pipe from 60 to 100m deep BGL. 138 Lowering of 200mm dia pipe from 100 to 120m deep BGL. 139 Development of Tubewell by compressor 140 Transportation, Installation and Dismantling of 250 PSI Compressor 141 Development of Tubewell by Adequate Capacity Air compressor 142 Development of Tubewell by O.P. Unit 143 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. 144 Development of Tubewell by Adequate Capacity by O.P. Unit 145 Chemical and Bacterological test of water sample from depaprtmental/ approved lab 146 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 147 PUMPING PLANTfor Zone-1C, Tw No-1(Rebore)& TW No- 2(Existing) 148 For TW No 1 (Rebore) 149 SITC of Submersible pump setof Discharge1200 lpm at 57m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantitive may vary as per site condition) 150 25 H.P. or above as per site condition. 151 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 152 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 153 4 x 16 sq. mm Al. cable 154 Automatic chlorination system compactable to SCADA system 155 Soft starter with RS-485 port-400V Classminimum 22 Kw rating or above as per site condition 156 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition 157 Motor operated actuator with sluice valve 150mm Sluice Valve 158 CE & UL certified Inteligent Smart Energy Meter 159 CE & UL certified Electro magnatice flow Meter 150mm size 160 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 161 CE & UL certified pressure transmitter 162 CE & UL certified Surge protector 3 phase at main switch. 163 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 164 Installation, commissioning & testing for one tubewell / OHT 165 For Tw No 2 (Existing) 166 SITC of Submersible pump set of Discharge 1100 lpm at 58 m Head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, discharge & HP are tantitive may vary as per site condition) 167 25 H.P. or above as per site condition. 168 3 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 169 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 170 4 x 16 sq. mm Al. cable 171 Automatic chlorination system compactable to SCADA system 172 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition 173 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition 174 Motor operated actuator with sluice valve 150 mm Sluice Valve 175 CE & UL certified Inteligent Smart Energy Meter 176 CE & UL certified Electro magnatice flow Meter 150mm size 177 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 178 CE & UL certified pressure transmitter 179 CE & UL certified Surge protector 3 phase at main switch. 180 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 181 Installation, commissioning & testing for one tubewell / OHT 182 SCADA Automation of PUMPING PLANTat Zone-01C, TW No-1(Rebore) & T.W. No 2 (Existing) 183 SCADA Automation Items 184 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2) 185 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges (1x2) 186 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x2) 187 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2) 188 Trial run for 03 months period for each tubewell through SCADA (1x2) 189 TRIAL &RUN of Pumping Plant of Tw 1(Rebore)& 2(Existing) of Zone 1C 190 03 Month operation & maintenance includingStaff & chlorine. 191 Construction of TW No 1 & 3 of Zone-1 D 192 Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 193 Transportation, Erection and Dismantling of Rig Machine 194 Drilling by RC/DC Rig Machine 600 mm dia 195 0 to 65 mtr. deep (65x2) 196 65 to 100 mtr. deep 500 mm dia (35x2) 197 100 to 130 mtr. 500 mm dia (30x2) 198 Tubewell Assembly 199 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 200 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60.5x2) 201 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60x2) 202 Supply of pea gravel (38.22x2) 203 Logging of bore hole by departmental / approved electric logger. 204 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 205 Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2) 206 Lowering of 200mm dia pipe from 60 to 100m deep BGL. (60x2) 207 Lowering of 200mm dia pipe from 100 to 120m deep BGL. (20x2) 208 Development of Tubewell by compressor 209 Transportation, Installation and Dismantling of 250 PSI Compressor (1x2) 210 Development of Tubewell by Adequate Capacity Air compressor (40x2) 211 Development of Tubewell by O.P. Unit 212 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. (1x2) 213 Development of Tubewell by Adequate Capacity by O.P. Unit (80x2) 214 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. (1x2)Note- it done by department. 215 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. (1x2) 216 PUMPING PLANTfor Zone-1D 217 For TW No 1 & 3 218 SITC of Submersible pump set of Discharge 1200 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HP are tantative may vary as per site condition) 219 15 H.P. or above as per site condititon (1x2) 220 3 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) (2x2) 221 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. (36x2) 222 4 x 16 sq. mm Al. cable (50x2) 223 Automatic chlorination system compactable to SCADA system (1x2) 224 Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition (1x2) 225 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition (1x2) 226 Motor operated actuator with sluice valve 150mm Sluice Valve(2x2) 227 CE & UL certified Inteligent Smart Energy Meter (1x2) 228 CE & UL certified Electro magnatice flow Meter 150 mm size (1x2) 229 CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2) 230 CE & UL certified pressure transmitter (1x2) 231 CE & UL certified Surge protector 3 phase at main switch(1x2) 232 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2) 233 Installation, commissioning & testing for one tubewell / OHT (1x2) 234 For TW No 2 (Existing) 235 SITC of Submersible pump set of Discharge 1000 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (head , discharge & HP are tantative may vary as per site condition) 236 12.5 H.P. or above as per site condition 237 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 238 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 239 4 x 16 sq. mm Al. cable 240 Automatic chlorination system compactable to SCADA system 241 Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition 242 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition 243 Motor operated actuator with sluice valve 150mm Sluice Valve 244 CE & UL certified Inteligent Smart Energy Meter 245 CE & UL certified Electro magnatice flow Meter 150mm size 246 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 247 CE & UL certified pressure transmitter 248 CE & UL certified Surge protector 3 phase at main switch. 249 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 250 Installation, commissioning & testing for one tubewell / OHT 251 CWR of Zone 1D 252 Pump :- SupplyofHorizontal pump set with pump fitted with gland packing, MS fabricated base frame for both Motor & Pump, CI coupling (Spacer type), Steel coupling gurad.MOC: casing - Cast Iron FG 260, impeller - ASTMA A 743 Gr. CF8M, Shaft - AISI 410 a) Discharge : 1800 lpm x 27 m. head Electric Motor : -Supply of 4 Pole, 415 Volt, 50 Hz, 1450 RPM B3 mounting as per IE3 Standerd TEFC Motor. The motor shall besuitable to drivetheabove pumps within its whole range andof required capacity.20 H.P.(head , discharge & HP are tantative may vary as per site condition) 253 Starter :-Supplyof SCADA Compacatable Motor soft starter suitable tooperateat0.415KV+10%3 phase, 50Hz. A.C.supply andtocontroltheabove motors. It shallcompriseofall protection devicesas per latest I.S.S. specifications. - 20 H.P. or above as per site condition - (3 Nos) L.T. Switchgear Panel Board :- Supply of 1 no. panelextensible typeswitchboard suitable for 0.415 KV3 phase 50 HZ. A.C. supply in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following :(a) 02no.Incoming Panelcomprisingofsuitable capacity ACB/MCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. of above required motor. (b) 6 Nos. outgoing panelsfor pumping plants. 3 Nos. Of Pump, 01 No. for Internal & External lighting, 01 no. for welding & other miscellanious work and 01 nos spare Each panelhavingsuitable capacity MCCB with ammeter and C.T.with selectorswitch,KWmeter, single phasingpreventer, capacitoretc for proper functioning for whole E&M Equipments installed in scope ofCWR. 254 Servo-Stablizer 60 KVA or above as per site condition 255 Power Cable :-Supply and laying of1100 V grade 3 core 16 mm2 from panel to starter and starter to motor XLPE armoured cables ofrequiredsizes with earthing material (3x30 mt) approx. 256 C.I. / M.S. Fitting of Delivery pipes and specials as per details given below: 150 mm size individual delivery and 250 mm size common delivery with jointing material, Tee, bends 257 Reflux Valve 150 mm 258 Sluice Valve 250 mm with actuator 259 Sluice Valve 150 mm with actuator 260 Dismantling Joint. 261 150 mm 262 250 mm 263 Nut Bolts and rubber packing etc. 264 Supply of MS Girder for pump base etc. 265 Supply of spare parts required for maintenance of all equipments. 266 Direct on line type electromagnetic type flow meter of size 250 mm in common delivery ofM.S.pipelinefor measuring dischargeofpumpswithsignal transmitter device. Digitalflowindicatorshallbe installedin pump house on instrument control panel. 267 Supply of SCADA CompacatableElectronic level indicator. 268 Supply of electronic pressure Indicating devices SCADA Compactable. 269 Tools & spanners : HT, LT megger, Tong tester, Crimping tool (manual and hydraullic) 270 E.O.T. crane of 3 Tones capacity with 6 meter lift alongwith traveling trolley and girder etc. 271 SCADA Compatable Chlorination System 272 Erection and commissioning of above items. 273 Testing : At works of pumps & other equipments 274 Trial run and operation of pumping plants for one months. 275 Painting of equipments with two coats. 276 CE/UL approved manufacturers Intelligent smart energy meter with memory real time clock and 1 serial port integrated with R.T.U. as per spec mentioned in technical bid documents. 277 Auto phase reversal unit -Auto phase reversal unit/ automatic transfer switch withinbuilt time delay & enclosure of SuitableAmpere rating (Confirming to I.E.C. - 60947-1 and I.E.C.- 60947-6-1)as specified in tender technical specification sheet 278 CE / UL approved manufacturer’s Radartype Level Transmitter for CWR as specified in tender technical specification sheet 279 CE / UL approved manufacturer’s Pressure Transmitterin each pumping delivery line as well main header line of Pump as per specifications specified in tender technical specification sheet. 280 Complete cabling for ZPS including all power and control cable of all equipments at ZPS and OHTs. 281 02 nos(1W+1S) monoblock /submersible single phase 50 hz 3hp pumpset capable of drain out waste water of dry well with starter and all fittings arrangemnent (pipe,tee bend etc) required for complete disposal of waste water as required 282 Security Surveillance IP Camera with Recorer 283 Trial Run of CWR through SCADA for 3 Month 284 Internal & External Electrification of CWR Zone 1D (Lighting of bulding and campus) 285 Supply,installation and fixing of 286 M.S tubler poles 9.5 m height 287 Twin tube light covered 288 450 mm dia exhaust fan 289 1200 mm ceiling fan 290 250 watt flood light 291 15 amp power plug point 292 5 Amp power plug point 293 Supply of tube light LED etc. 294 Wiring of plant in copper conductor 295 Supply &laying of 4x 16 sq mm Copper conductor cable 296 SCADA Automation Items for Tubewells 297 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (3x1) 298 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(3x1) 299 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(3x1) 300 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (3x1) 301 Trial run for 03 months period for each tubewell through SCADA(3x1) 302 Automation of CWR 303 CE & UL approved manufacturers RTU/PLC suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified for each tubewell & CWR to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification sheet including Control panel with IP 54 protection industrial grade for all equipments (Separate for control (24 V) and power equipments) with CE / UL approved manufacturer’s Surge protector for Control Panel and CE / UL approved manufacturer’s 7 HMItouchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters as specified in tender technical specification sheet .(Suitable for 03 nos. CWR Motor.) 304 GSM/GPRS based wireless communicationmodem for RTU/PLC capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant as specified in tender technical specification sheet. 305 CE/UL surge protector 3 phase at main switch. 306 CE/UL Certified 7 HMI Touchscreen suitable to commuticate with PLC / RTU for loac display and control of process parameter. (Suitable to display data of all 03 motors) 307 Control Panel with IP54 protection Indsutrial grade for all equipmets seprate for control (24 Volt) and power equipment. (Suitable for all 03 motors) 308 Installation, Testing & Commissioning 309 Trail Run of CWR Zone 1D 310 03 Month Trial Run of 03 nos Tw & CWR including staff & liquid chlorine. 311 Zone-1 E 312 Construction of Tubewell(300X200 size) TW No 2 (Rebore) & TW No 3 313 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 314 Transportation, Erection and Dismantling of Rig Machine (1x2) 315 Drilling by RC/DC Rig Machine 600 mm dia 316 0 to 65 mtr. deep (65x2) 317 65 to 100 mtr. deep 500 mm dia(35x2) 318 100 to 130 mtr. 500 mm dia(30x2) 319 Tubewell Assembly 320 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 321 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60.5x2) 322 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60x2) 323 Supply of pea gravel (38.22x2) 324 Logging of bore hole by departmental / approved electric logger.(1x2) 325 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 326 Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2) 327 Lowering of 200mm dia pipe from 60 to 100m deep BGL. (40x2) 328 Lowering of 200mm dia pipe from 100 to 120m deep BGL.(20x2) 329 Development of Tubewell by compressor 330 Transportation, Installation and Dismantling of 250/350 PSI Compressor (1x2) 331 Development of Tubewell by Adequate Capacity Air compressor (40x2) 332 Development of Tubewell by O.P. Unit 333 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. 334 Development of Tubewell by Adequate Capacity by O.P. Unit 335 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 336 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 337 Pumping Plant tw Equipment at Existing Tubewell Zone 1E,TW No 1 338 Servo-Stablizer 40 KVA or above as per site condition 339 Automatic chlorination system compactable to SCADA system 340 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or as per site condition 341 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 342 Motor operated actuator for Existing Sluice Valve (size as per site condition) 343 CE & UL certified Inteligent Smart Energy Meter 344 CE & UL certified Electro magnatice flow Meter 150mm size or as per site condition 345 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 346 CE & UL certified pressure transmitter 347 CE & UL certified Surge protector 3 phase at main switch. 348 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 349 Installation, commissioning & testing for one tubewell / OHT 350 Pumping Plant at Zone 1E,TW No 2(Rebore) 351 SITC of Submersible pump set of 1200 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 352 25 H.P. or above as per site condition. 353 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 354 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 355 4 x 16 sq. mm Al. cable 356 Automatic chlorination system compactable to SCADA system 357 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or aboveor above as per site condition. 358 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 359 Motor operated actuator with sluice valve 150mm Sluice Valve 360 CE & UL certified Inteligent Smart Energy Meter 361 CE & UL certified Electro magnatice flow Meter 150mm size 362 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 363 CE & UL certified pressure transmitter 364 CE & UL certified Surge protector 3 phase at main switch. 365 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 366 Installation, commissioning & testing for one tubewell / OHT 367 Pumping Plant at Zone 1E,TW No 3 368 SITC of Submersible pump set of 839 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 369 17.5 H.P. or above as per site condition. 370 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 371 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 372 4 x 16 sq. mm Al. cable 373 Automatic chlorination system compactable to SCADA system 374 Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above as per site condition. 375 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition. 376 Motor operated actuator with sluice valve 100mm Sluice Valve 377 CE & UL certified Inteligent Smart Energy Meter 378 CE & UL certified Electro magnatice flow Meter 100mm size 379 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 380 CE & UL certified pressure transmitter 381 CE & UL certified Surge protector 3 phase at main switch. 382 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 383 Installation, commissioning & testing for one tubewell / OHT 384 SCADA Automation of Zone 1E TW No 1 (Existing), T.W. No 2 (Rebore) & T.W. No 3 385 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3) 386 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3) 387 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x3) 388 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3) 389 Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3) 390 Trial run of Zone 1E 391 03 Month Trial run of tubewells of Zone 1E with staff at tw 2(Rebore)&3 and liquid chlorine consumption on all 03 tubewells. 392 Zone-3 393 Construction of Tubewell of Zone 3 T.W. No 3 394 Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 395 Transportation, Erection and Dismantling of Rig Machine 396 Drilling by RC/DC Rig Machine 500 mm dia 397 0 to 65 mtr. deep 398 65 to 100 mtr. deep 450 mm dia 399 100 to 130 mtr. 450 mm dia 400 Tubewell Assembly 401 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 402 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 403 150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 404 Supply of pea gravel 405 Logging of bore hole by departmental / approved electric logger. 406 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 407 Lowering of 200mm dia pipe from GL to 60m deep BGL. 408 Lowering of 150mm dia pipe from 60 to 100m deep BGL. 409 Lowering of 150mm dia pipe from 100 to 150m deep BGL. 410 Development of Tubewell by compressor 411 Transportation, Installation and Dismantling of 250 PSI Compressor 412 Development of Tubewell by Adequate Capacity Air compressor 413 Development of Tubewell by O.P. Unit 414 Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test. 415 Development of Tubewell by Adequate Capacity by O.P. Unit 416 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 417 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 418 E/M equipmenton Existing Pumping Plant at Tubewell of Zone 3 TW No 1 & 2 419 Servo-Stablizer minimum 40 KVA or above or as per site condition. (1x2) 420 Automatic chlorination system compactable to SCADA system (1x2) 421 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 422 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition. (1x2) 423 Motor operated actuator for Existing Sluice Valve (1x2) 424 CE & UL certified Inteligent Smart Energy Meter (1x2) 425 CE & UL certified Electro magnatice flow Meter 150mm size (1x2) 426 CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2) 427 CE & UL certified pressure transmitter(1x2) 428 CE & UL certified Surge protector 3 phase at main switch(1x2) 429 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2) 430 Installation, commissioning & testing for one tubewell / OHT (1x2) 431 Pumping Plant at Zone 3 TW No 3 432 SITC of Submersible pump set of 492 lpm,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HPare tantative may vary as per site condition ) 433 12.5 H.P. or above as per site condition 434 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 435 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 436 4 x 16 sq. mm Al. cable 437 Automatic chlorination system compactable to SCADA system 438 Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above 439 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 440 Motor operated actuator with sluice valve 100mm Sluice Valve 441 CE & UL certified Inteligent Smart Energy Meter 442 CE & UL certified Electro magnatice flow Meter 100mm size 443 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 444 CE & UL certified pressure transmitter 445 CE & UL certified Surge protector 3 phase at main switch. 446 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 447 Installation, commissioning & testing for one tubewell / OHT 448 SCADA Automation Items 449 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3) 450 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3) 451 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x3) 452 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3) 453 Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3) 454 Trial run of Zone 3 TW No 1 & 2 (Existing) & TW No 3 455 03 Month Trial run of tubewells of Zone 3 with staff at tw 3 and liquid chlorine consumption on all 03 tubewells. 456 Zone-4 457 Construction of Tubewell of Zone 4 TW No 1 (Rebore) 458 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 459 Transportation, Erection and Dismantling of Rig Machine 460 Drilling by RC/DC Rig Machine 500 mm dia 461 0 to 65 mtr. deep 462 65 to 100 mtr. deep 450 mm dia 463 100 to 130 mtr. 450 mm dia 464 Tubewell Assembly 465 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect. 466 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 467 150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 468 Supply of pea gravel 469 Logging of bore hole by departmental / approved electric logger. 470 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 471 Lowering of 200mm dia pipe from GL to 60m deep BGL. 472 Lowering of 150mm dia pipe from 60 to 100m deep BGL. 473 Lowering of 150mm dia pipe from 100 to 150m deep BGL. 474 Development of Tubewell by compressor 475 Transportation, Installation and Dismantling of 250 PSI Compressor 476 Development of Tubewell by Adequate Capacity Air compressor 477 Development of Tubewell by O.P. Unit 478 Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test. 479 Development of Tubewell by Adequate Capacity by O.P. Unit 480 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 481 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 482 Pumping plant of Zone 4 TW No 1 (Rebore) 483 SITC of Submersible pump set of Discharge 600lpm ,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantative may vary as per site condition) 484 15 H.P. or above as per site condition. 485 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 486 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 487 4 x 16 sq. mm Al. cable 488 Automatic chlorination system compactable to SCADA system 489 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 490 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 491 Motor operated actuator with sluice valve 150mm Sluice Valve 492 CE & UL certified Inteligent Smart Energy Meter 493 CE & UL certified Electro magnatice flow Meter 150mm size 494 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 495 CE & UL certified pressure transmitter 496 CE & UL certified Surge protector 3 phase at main switch. 497 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 498 Installation, commissioning & testing for one tubewell / OHT 499 Pumping plant of Zone 4 TW No 2(Existing) 500 SITC of Submersible pump set of discharge 1100 lpm ,58 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 501 25 H.P. or above as per site condition. 502 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 503 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 504 4 x 16 sq. mm Al. cable 505 Automatic chlorination system compactable to SCADA system 506 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 507 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 508 Motor operated actuator with sluice valve 150mm Sluice Valve 509 CE & UL certified Inteligent Smart Energy Meter 510 CE & UL certified Electro magnatice flow Meter 150mm size 511 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 512 CE & UL certified pressure transmitter 513 CE & UL certified Surge protector 3 phase at main switch. 514 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 515 Installation, commissioning & testing for one tubewell / OHT 516 SCADA Automation Items 517 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2) 518 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x2) 519 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x2) 520 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2) 521 Trial run for 03 months period for 02 nos of tubewell through SCADA (1x2) 522 Trial run of Zone 4 T.W No 1 (Rebore) & T.W. No 2 (existing) 523 03 Month Trial run of tubewells of Zone 4 with staff at tw 1(Rebore) and liquid chlorine consumption on all 02 nos of tubewells. 524 OHT forZone-1C, 1D, 1E 3&4 525 Motor operated actuator for Existing sluice valve onExisting OHTof 300 mm size. of Zone 1C 526 Motor operated actuatorwith sluice valve on New OHTof 400 mm size. Of Zone 1D, 1E & Zone 3 527 Motor operated actuator for Existing sluice valve onExisting OHT of 250 mm size. of Zone 4 528 Flow Meter on OHT delivery line of size 300 mm dia for Existing OHT of Zone 1C 529 Flow Meter on OHT delivery line of size 400 mm dia for New OHT of Zone 1D, 1E & Zone 3 530 Flow Meter on OHT delivery line of size 250 mm dia for Existing OHT of Zone 4 531 Chlorine Analyzer rnge 0-5 ppm (electrolyte with membrane cap; Type- Amperometric. 532 CE/UL certified Radar type Level Transmitter for Over haead Tank for Eisting OHT of zone 1&2 and new OHT of Zone 3 533 MASTER CONTROL SYSTEM (MCS) 534 CE/UL & BIS Certifed industrial grade LED MONITOR with latest configuration 535 (i) 65 (upto 50 Tubewells). 536 Desktop/PC with i5/i7 processor for 537 CE/UL Certified 5KVA UPS with batteries . 538 Full development version of required TAGS SCADA Software with coustomization of sowftware for MCS as per requirement . 539 CE/UL Certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser 540 CE/UL Certified Field gateway agent for transfering data from MCS to Central control room. 541 GSM based wireless/Broaband/Equipment communication system for PLC capable to transfer & received data & gather data from remote sites to control satation, All accessories included signal enhancer antenna along with running expences, till DLP. 542 CE/UL Certified Firewall for network protection. 543 SURGE PROTECTOR FOR ETHERNET communication protection. 544 CE/UL certified industrial grade Ethernet Switch. 545 Mobile App Facility system architecture (industries internet based & viewed through mobile apps for increased local & Remote Visibility). 546 Canon/HP or equivalent Laser Printer 1018 or equivement. 547 Security Sureillance IP camera with recorder (optional) 548 Installion, Commissioning & testing including required furniture, A/c etc. 549 Trial run of MCS for 03 months period