|
| 1 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Average filling depth 150 mm),includingall labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete. & removing to unservicable soil. P.No 136, I No.10.02 A NH SR 2022-23 |
| 2 | From Km.401.300 to 483.151 in selected reaches (As per Detailed Estimate) |
| 3 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908(PWD SR Vol III 2023-24 P No.147 I No 16.19).Clearing longitudinal and transverse covered drains and pipe drains including manholes, gratings, channels and gullies etc. and bringing them to original drainage capacity, including disposal of sediments, extraneous debris and vegetation growth blocking the free flow from site outside ROW with all leads and lifts complete in all respects as directed by the Engineer and as per Maintenance Standards Clause no. 3.1. The job also includes removing and refixing of precast slab in original position, (Frequency of cleaning will be as per site requirement however limited to twice in a year). |
| 4 | From Km.401.300 to 483.151 in selected reaches (As per Detailed Estimate) |
| 5 | Clearing cleaning, deepening and reshaping of roadside unlined/ kaccha drains and making shallow kaccha Iateral drains on shoulders wherever required, including removal and disposal of sediments, extraneous debris and vegetation growth blocking the free flow from site outside ROW with all leads and lifts complete in all respects as directed by the Engineer- ln-Charge and as per Maintenance Standard Clause no. 3.1 (Frequency of cleaning in urban areas will be quarterly whereas in rural areas, it will be twice in a year i.e. before and after monsoon).a) Drains having depth upto 0.6 meter |
| 6 | From Km.401.300 to 483.151 in selected reaches (As per Detailed Estimate) |
| 7 | Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification (PWD SR Vol III 2023-24 P No.147 I No 16.20).Clearing slab/ box type culverts and pipe culverts including clearing, cleaning and reshaping of upstream and downstream faces of these culverts within right of way. The job includes disposal of excess material recovered from site including vegetation outside ROW with all leads and lifts complete in all respects as per direction of Engineer-ln-Charge and as per Maintenance Standards Clause 3.1 (Frequency of cleaning will be one time in a year i.e. before start of monsoon). |
| 8 | a) Slab/Box Type Culverts (As per Detailed Estimate) |
| 9 | a) Pipe Culverts (As per Detailed Estimate) |
| 10 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete (For new road) - In area of light jungle by Mechanical means. |
| 11 | From Km.401.300 to 483.151 in selected reaches (As per Detailed Estimate) |
| 12 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm thick.Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, includingcost of all materials, all labour, usage charges of machinery, lead, lifts, loading, unloading stacking,transporting etc., complete exepet lead for bitumen & emulsion. Grading II 13mm (Nominal size) I.No10.05 (ii)P.No 137 NH SR 2022-23. |
| 13 | From Km.401.300 to 483.151 in selected reaches (As per Detailed Estimate) |
| 14 | Mechanical Broom Hydraulic for the maintenance of the carriageway in the traffic worthy condition PWD Common SR 2023-24 P No A-48 Sl No 62(Cleaning will be carried out once in a month) |
| 15 | From Km.401.300 to 483.151 (As per Detailed Estimate) |
| 16 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT > 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire > IK08. Power Factor >0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency>1301m/w, nominal CRI >75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source.LED Streetlight 200 W PWD Electrical SR 2023-24 P No 46 I No 11..8.8 |
| 17 | From Km.401.300 to 483.151(As per Detailed Estimate) |
| 18 | Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires.PWD Electrical SR 2023-24 P No 56I No13.5 |
| 19 | From Km.401.300 to 483.151(As per Detailed Estimate) |
| 20 | BILL NO -3 : PERFORMANCE BASED PAVEMENT REPAIR & ROAD MAINTENANCE |
| 21 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm thick.Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, includingcost of all materials, all labour, usage charges of machinery, lead, lifts, loading, unloading stacking,transporting etc., complete exepet lead for bitumen & emulsion. Grading II 13mm (Nominal size) and other items mentioned in Clause 3 of Section 7 of comtract agreement. |
| 22 | (2Lane with earthern shoulders) (As per Detailed Estimate) |
| 23 | (4Lane with Divided Carriageway without Paved shoulder) (As per Detailed Estimate) |
| 24 | Rescue Ambulance utilization charges including manpower EMT (Emergency Medical Treatment) + Driver.(As per ministry circular) |
| 25 | Month |