|
| 1 | Upgradation of Existing BSL-2 Lab in to BSL-3 Lab (by Establishing Building Management System & Clinical Equipment) in Department of Microbiology ofRMLIMS Lucknow. |
| 2 | BMS SYSTEM |
| 3 | CENTRAL CONTROL STATIONS (INDIGENOUS) |
| 4 | Supply, installation, testing and commissioning of Intel Core i3-4150 Processor ( 3MB, 3.50GHz w/HD4400 Graphics) (338-BEED), 8GB Dual Channel DDR3L 1600MHz (4GBx2) (370-AAPE), Intel Integrated Graphics, 128GB Solid Drive (400-ADLX), Windows 7 Professional, English, 64bit, US English (QWERTY) Dell KB212-B QuietKey USB Keyboard Black (580-AAQX), Up to 90% efficient PSU Base 49.5cm (19.5 INCH) Non-touch with Camera, Integrated (321-BBGU), 8x Slimline DVD+/-RW Drive (429-AAMY), OptiPlex 3030 Resource DVD (340-AIQP), Dell USB Optical Mouse MS111 (570-AACR), ENERGY STAR Version 6.0 (387-BBEZ), System Power Cord (Philipine/TH/US) (450-AAOJ), Safety/Environment and Regulatory Guide (English/French/Dutch) (340-AGIK), 1-Watt BIOS (340-ABMZ), Heat Sink for Integrated Graphics (412-AADE), AIO Stand OptiPlex 3030 (575-BBCG), 19\" TFT monitor |
| 5 | SOFTWARE |
| 6 | Supplying, Testing and Commissioning of the Graphical Softwareproviding the facility to create / provide the following, static and animate the Graphics, Navigation between pages, display of logs, changing the time zones, popup alarms, with minimum of 1 user license configurable password protection for BuildingAutomation System as per Specifications.The BMS platform shall natively support standard communication protocols such as Lontalk® and BACnet™. The software should be Web Based Software Required to remotely monitor the system for 5 concurrent users. TheBMS software should have email facility for sending critical alarms, complete all as specified and directed. |
| 7 | CONTROLLERS |
| 8 | Supply, Installation, Testing & Commissioning Programmable and Application specific controller - Providing, installing, testing and commissioning of filed mounted controllers of the following configurations and as per below specifications:(A) The programmable controllers processors shall be 32-Bit, 50 MH, LONchip BACnet Compatible.The DDC Controllers should be on BACnet & UL listed. The DDC controller shall be as per the I/O Summary. |
| 9 | SENSORS & FIELD DEVICES |
| 10 | Supply, installation, testing & commissioning ofthe following Sensors, complete all as specified and directed. |
| 11 | Differential PressureSensor( Filter Status) |
| 12 | Differential PressureSensor |
| 13 | Duct Type Temperature and Humidity Sensor With Display |
| 14 | Duct Type Temperature and Humidity Sensor Without Display |
| 15 | CABLING & CONDUTING |
| 16 | Supply, Installation, Testing & Commissioning of the following cables, complete all as specified and directed. |
| 17 | 4 core control cable |
| 18 | 2 core communication cable |
| 19 | CCTV SYSTEM |
| 20 | Supply & Installation Testing & Commissioning - 55 inch LG / Samsung / Panasonic / Sony Smart TV |
| 21 | Supply & Installation Testing & Commissioning- 32 Channel NVR - Godrj |
| 22 | Supply & Installation Testing & Commissioning-Cable Cat6 per Mtr-Dlink |
| 23 | Supply & Installation Testing & Commissioning - 8 Channel Poe Switch |
| 24 | Supply & Installation Testing & Commissioning- 4 Channel Poe Switch |
| 25 | Supply & Installation Testing & Commissioning- IO Box HDMI Cable |
| 26 | Supply & Installation Testing & Commissioning- CCTV Camera 4 MP IP with SD card support, 50 IR |
| 27 | Supply & Installation Testing & Commissioning- Rack 15u With Fan |
| 28 | Clinical Equipment |
| 29 | Supply & Installation - Bio Safety CabinetSpecification :-- Size- 3x3x2 ft- Class- 2 |
| 30 | Supply & Installation - Dry Bath System |
| 31 | Supply & Installation - Electronic Pipette Controller |
| 32 | Supply & Installation - Double Door Autoclave- Capacity: 100 Liters- Size: 450x600 mm- Double Door |
| 33 | Supply & Installation - PCR Workstation |
| 34 | Supply & Installation - Dynamic Pass Box |
| 35 | Supply & Installation - Mini Cooler |
| 36 | Supply & Installation - Safety Shower with Eye Washer |
| 37 | Supply & Installation - Storage Cabinet |
| 38 | Supply & Installation - Shoe Rack |
| 39 | BSL-3 Lab Testing, Validation and SOP |
| 40 | Following Lab Testing, Validation & SOP shall be done as per HOD, Microbiology Deptt. |
| 41 | List of Tests To Be Performed |
| 42 | Labelling To Be Done |
| 43 | Documents for final Submission |
| 44 | GST Extra as applicable |