Construction Of Kitchen Shed In Anegundi Gp Hampi Road Govt School - Tractor - 40 Hpang,Size Stone 20 X 20 X 25 Cmsang,Rubble Stonesang,Gravel 2.36 Mm/Murrumang,Broken Stone Aggregate 40 Mm Sizeang,Broken Stone Aggregate 20 Mm Sizeang,Broken Stone Aggregate 12 Mm To 10 Mm Sizeang,Bouldersang,Bond Stone 20 X 20 X 45 Cmang,Coarse Sand (Zone Iii)Ang,Portland Cementang,Vitrified Tiles 600X600 Mmang,Bib Cock 20Mm Nominal Boreang,Ms Flatang,Add Sundries Charges At 1 % On Labourang,Mixer (Concrete Small Used In Culvert)Ang,Hom Of Machinaries For Planingang,Tmt Bars Fe 500Ang,Solid Concrete Blocks (40 X 20 X 20 Cms)-4.00 N/Sqmmang,Silver Oak Or Equivalent Planks 38 Mm Thickang,Ready Mix Primer Paint (Ready Mix Red Lead Paint)Ang,Primerang,Mathi/Nandi Wood Scantlingang,Mathi/Nandi Wood Planks For Panels 25 Mm Thickang,Jungle Wood Runners And Planksang,Enamel Metal Paintang,Casurina Poles 75 - 100 Mm Diaang,Casurina Poles 100 - 150 Mmang,Polythylene Pipes High Density 25Mm External Diaang,Polyenthylene Water Storage Tank Of Specified Capacity Lang,M.S Rodsang,Display Boardang,Binding Wireang,Plasticizer / Super Plasticizerang,Water Proofing Cement Paintang,Plastic Emulsion Paintang,Electrification Anegundi,Licenced Plumber With Toolsang,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paintang,Add Watering Charges At 1 % On Materialang,Add Watering Charges At 1 % On Labourang,Add Sundries Charges At 2 % On Materialang,Add Sundries Charges At 1 % On Materialang,Add Providing And Removing Scaffolding At 3% On Labourang,Add Hom Of Welding And Grinding Machine At 4 Pers On Materialang,Add Handling , Loading And Unloading At 2% On Materialang,Add Handling , Loading And Unloading At 1% On Materialang,Add Cutting And Other Wastage 5%Ang,Add Cement Sand And Grit 1% On Materialang,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paintang,Add Brush, Putty, Sand Paper, Roller At 1% On Cost Of Paintang,Add Brush At 1% On Cost Of Paintang,Add 5% For Fittings And Wastage Chargesang,Mason Class I (With Tools)Ang,Painter Class Iang,Mixer (Concrete) - 1 Cum Capacityang,Hom Of Vibrator 0.71 Daysang,Welder Grade Iang,Fitter Class Iang,Handling Loading And Unloading 3% On Materialang,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Materialang