Supplying Of Materials To Sanjivini Womens Common Work Shed Building At Kabbaragi Village In Kushtagi Taluka - Rcc Cap 1000 Mm Dia , 100 Mm Thick,Labour Charges For Handing Errection Of Rcc Rings Etc. At 5 %,Transportation Charges Of Materials Beyond 5 Km At 10 %,Fabrication, Charges,Cost Of 6.5 Mm M, S. Coil,Licenced Plumber With Tools,,Lead Or Pvc Connection, Pipe 32 Mm Dia (For Wash Basin),C.I. / M.S. Brackets, For Flushing Cistern,Brass, Stop Cock,Cp Brass Waste 32,Mm Of Standard Pattern,Cp Brass Chain, With Plug,,Copper Plated Brass Piller Tap 15 Mm,White Vitreous China Clay Flat Back Wash Basin Size 550 X 400 Mm,Add White Lead Paint , Gasket , Cement , Sand For Making Good The Wall And Floor At 2 % On Material,G,I. Overflow Pipe 20 Mm Dia,Black Plastic Seat, With Lid As Specified,White Glazed / Viterous China Clay 10Lts Low Lwvwl Flushingcistern, With Fittings And Brakets And 40 Mm White C,P. Flush Pipe,European Type Water, Classet Of Specific Make.,Mosquito Proof, Coupling 25 Mm,Stone Aggregate (Single Size) 10 Mm Nominal Size.,Stone Aggregate (Single Size) 20 Mm Nominal Size.,Handling Loading And Unloading 3 % On Material,Labour Charges For Lifting And Placing In Position And Making Connection At 7 % On Material,Polyenthylene Water Storage Tank Of Specifief Capacity L,Enamel Paint.,,Add Brush , Putty , Sand Paper , Roller At 5 % On Cost Of Paint,Plastic, Emulsion Paint.,Painter Class L,Add Brush , Putty , Sand Paper At 2 % On Cost Of Paint,Water Proofing, Cement Paint.,White, Cement.,Ceramic Tiles 30 X 30 Cms.,Unit Cost As Per The, Specification.,Teak Wood Beading 20 X 20 Mm,,Add 15 % Wastage,Reeded Glass 3 Mm Thick.,Add 5 % Wastage Charges,Mathi / Nandi Wood Scantling For Styles And Rails 25 Mm Thick,Mathi / Nandi Wood Scantling For Styles And Rails 30 Mm Thick,Honnewood Planks, For Panels 20 Mm Thick,Honne, Wood,Hom, Of Machinaries For Planing,Add Cutting And Other Wastage 5 %,Mathi/ Nandi Wood Planks For Panels 25 Mm Thick,Mason Class L (With Tools),Vitrified Tiles 600 X 600 Mm.,Add Providing And Removing Scaffolding At 3 % On Labour,Burnt Bricks Class 35, (Non Modular),Add Handling , Loading And Unloading At 1 % On Material,Brick.,,Jungle Wood,Runners And Planks,Casurina Poles, 75 - 100 Mm Dia,Add Sundries, Charges At 2 % On Material,Add Handling , Loading And Unloading At 2 % On Material,Casurina Poles 100 - 150,Mm,Silver Oak Or Equivalent, Planks 38 Mm Thick,Compensation For, Earth Taken From Private Land,Water,.,,Three Wheel 80-100 Kn Static, Roller,Water Tanker, 6 Kl Capacity,Motor Grader, At 50 Cum Per Hour,Dozer D-50 For Spreading, At 200 Cum Per Hour,Unloading Of Earth, As Per Item 1.1 (Iv),Loading Of Earth, As Per Item 1.1 (Ii),Tipper 5.5 Cum With, 10 Tonne Capacity,Hydraulic Excavator 0.9 Cum, Bucket Capacity At 60 Cum Per Hour,Mixer ( Concrete Small, Used In Culvert),Boulders,.,,Bond Stone 20 X 20 X 45, Cm,Size Stone, 20 X 20 X 25 Cms.,Binding, Wire,Tmt Bars Fe, 500,Hom Of Vibrator 0.71, Days.,Plasticizer, / Super Plasticizer.,Over Head And Other Miscellaneous Charges.,Add Sundries Charges At1% On Material.,Add Watering Charges, At 1 % On Material.,Mixer (Concrete) - 1,Cum Capacity.,Portland, Cement.,Coarse Sand (Zone -Lll),Broken Stone Aggreate 12, Mm To 10,Mm Size,Broken Stone Aggregate 20,Mm Size.,Broken Stone Aggregate 40Mm Size.