|
| 1 | Repairs to PUE School building @ Bharathanthangal Pt |
| 2 | Chipping the wall plasteringand roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete., |
| 3 | Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete. |
| 4 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 5 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 6 | Paintingtwo coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 7 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. |
| 8 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. |
| 9 | Provision for Rain water Harvesting Structure(1Nos) |
| 10 | Construction of chappal rack in verandah |
| 11 | Provision for Bala pianting |
| 12 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 13 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 14 | Repairs to PUM School building (East facing)@ Karai Pt |
| 15 | Chipping the wall plasteringand roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete., |
| 16 | Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete. |
| 17 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 18 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 19 | Paintingtwo coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 20 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. |
| 21 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. |
| 22 | Provision for Rain water Harvesting Structure(1Nos) |
| 23 | Provision for Cub Board with Shutter |
| 24 | Construction of chappal rack in verandah |
| 25 | Provision for Bala pianting |
| 26 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 27 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 28 | Repairs to PUM School building (West Facing)@ Karai Pt |
| 29 | Chipping the wall plasteringand roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete., |
| 30 | Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete. |
| 31 | Dismantling old damaged pressed tiles including the cost and conveyance of all materials etc., complete |
| 32 | Terrace finishing with Pressed tiles as slanting tiles set in cm 1:3 mix, including the cost of all materials, labour charges etc., complete. |
| 33 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 34 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 35 | Paintingtwo coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 36 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. |
| 37 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. |
| 38 | Provision for Rain water Harvesting Structure(1Nos) |
| 39 | Provision for Cub Board with Shutter |
| 40 | Provision for Electric Arrange ment |
| 41 | Construction of chappal rack in verandah |
| 42 | Provision for Bala pianting |
| 43 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 44 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 45 | Repairs to PUE School Toilet @ Pulipattu Pt |
| 46 | Dismantling the existing damaged Wall Tiles and Floor tiles including all charges |
| 47 | Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size300 mm x 200 m x 6 mmof any shape and quality laidcement mortor 1 : 2over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 48 | Paving the Floor with Best Quality Anti SkidTiles of any approved colour and size 300 mm x 300 mmx 8 mm shape and quality laid in CementMortor 1 : 2 to 20 mm thick in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 49 | Panting two coats of Distemper using oil bound over cement plastered surface including cleaning, preparing the surface etc complete for inner |
| 50 | Exterior Emulsion painting two coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 51 | Painting two coats over iron work including cost & conveyance etc complete |
| 52 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand |
| 53 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge handbroken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete comply |
| 54 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm includingcuring,finishing and cost & Conveyance of all materials etc., complete. |
| 55 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X |
| 56 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 57 | RCC 1: 1.5 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excludingcentering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixingfan clamps and ixtures in rcc works wh |
| 58 | Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 59 | Provision for Water Supply Arrangement |
| 60 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 61 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 62 | Repairs to PUE School Toilet @ Thadagam |
| 63 | Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size300 mm x 200 m x 6 mmof any shape and quality laidcement mortor 1 : 2over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 64 | Paving the Floor with Best Quality Anti SkidTiles of any approved colour and size 300 mm x 300 mmx 8 mm shape and quality laid in CementMortor 1 : 2 to 20 mm thick in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 65 | Panting two coats of Distemper using oil bound over cement plastered surface including cleaning, preparing the surface etc complete for inner |
| 66 | Exterior Emulsion painting two coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 67 | Painting two coats over iron work including cost & conveyance etc complete |
| 68 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand |
| 69 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge handbroken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete comply |
| 70 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm includingcuring,finishing and cost & Conveyance of all materials etc., complete. |
| 71 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X |
| 72 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 73 | RCC 1: 1.5 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excludingcentering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixingfan clamps and ixtures in rcc works wh |
| 74 | Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 75 | Provisio n for New Door |
| 76 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 77 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 78 | Provision for LWF1% |
| 79 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |