| Sl. No. | Item Description |
| 1 | Running Works Contract Items (OH + UG + SS Works) |
| 2 | Transportation of all type of poles by vehicle (for all sizes of poles including loading and unloading) - For a lead upto 5 KM |
| 3 | Transportation of all type of poles by vehicle (for all sizes of poles including loading and unloading) - For a lead of every KM above 5 KM |
| 4 | Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 KM |
| 5 | Transporting of distribution transformer / metering set from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 6 | Transporting of distribution transformer / metering set from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 7 | Transporting of line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 8 | Transporting of line materials from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 9 | Loading of REC, RCC, PSC pole upto 8.00 m length |
| 10 | Loading of all REC, RCC, PSC pole above 8.00 m length |
| 11 | Loading of metal poles all sizes |
| 12 | Unloading of REC, RCC, PSC pole upto 8.00 m length |
| 13 | Unloading of all REC, RCC, PSC pole above 8.00 m length |
| 14 | Unloading of metal poles all sizes |
| 15 | Loading of distribution transformer upto 100 KVA |
| 16 | Loading of distribution transformer above 100 KVA and below 500 KVA |
| 17 | Loading of distribution transformer 500 KVA |
| 18 | Unloading of distribution transformer upto 100 KVA |
| 19 | Unloading of distribution transformer above 100 KVA and below 500 KVA |
| 20 | Unloading of distribution transformer 500 KVA |
| 21 | Loading of meteing sets of all ratios |
| 22 | Unloading of meteing sets of all ratios |
| 23 | Loading of line materials |
| 24 | Unloading of line materials |
| 25 | Excavation & backfilling of pole pit for pole upto 8.00 m length by using JCB / manual |
| 26 | Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual |
| 27 | Excavation & backfilling of pole pit in hard soil (common to all size of poles) |
| 28 | Excavation & backfilling of pole pit in areas of medium rock and dense medium rock requires blasting (common to all size of poles) |
| 29 | Excavation & backfilling of pole pit in rocky area (common to all size of poles) by blasting / manual |
| 30 | Excavation & backfilling of structure pole pit 3 x 3 x 6 feet by using JCB or Manual for single pole DT structure |
| 31 | Erection of RCC, REC, PSC pole upto 8.00 m length by using crane / manual |
| 32 | Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual |
| 33 | Erection of metal support above 9 m / RSJ / rail pole / tubular pole |
| 34 | Mass concreting of pole with 1:4:8 mix using 40 mm jally including curing (material + labour) for a size of 0.45 x 0.45 x 1.2 m |
| 35 | Sleeve concreting with 1:4:8 mix using 40 mm jally including curing (material + labour) |
| 36 | Stay concreting with 1:4:8 mix using 40 mm jally including curing (material + labour) |
| 37 | Earthing of pole with GI wires 4 or 6 SWG by coil earthing |
| 38 | Provision of spike including earthing arrangement |
| 39 | Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 40 | Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual |
| 41 | Excavation & back filling of stay pit per location - hard rock without blasting |
| 42 | Excavation & back filling of stay pit per location - medium rock and dense medium rock requires blasting |
| 43 | Excavation & back filling of stay pit per location - hard rock requires blasting |
| 44 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 45 | Erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod |
| 46 | Replacement of stay rod only (including stay pit excavation, refilling & erection) |
| 47 | Replacement of guy shackle only in existing stay |
| 48 | Fixing of V cross arm 3.5 feet |
| 49 | Fixing of V cross arm 4.5 feet |
| 50 | Fixing of V cross arm 5 feet |
| 51 | Fixing of LT single phase cross arm |
| 52 | Fixing of LT 3 phase cross arm |
| 53 | Fixing of HT / LT TI fitting |
| 54 | Fixing of 11 KV porcelain pin insulator with pin or polymer composite pin insulator |
| 55 | Fixing of 22 KV porcelain pin insulator with pin or polymer composite pin insulator |
| 56 | Fixing of 33 KV porcelain pin insulator with pin or polymer composite pin insulator |
| 57 | Fixing of LT pin insulator |
| 58 | Fixing of HT disc 11 KV |
| 59 | Fixing of HT disc 22 KV |
| 60 | Fixing of HT disc 33 KV |
| 61 | Fixing of LT shackle |
| 62 | Fixing of aluminium knob |
| 63 | Fixing of HT LAS (3 Nos.) |
| 64 | Fixing of LT LAS (3 Nos.) |
| 65 | Fixing of guarding cross arm |
| 66 | Fixing of tapping channel cross arm |
| 67 | Fixing of double channel cross arm |
| 68 | Fixing of open type fuse unit |
| 69 | Paving and stringing of conductor of sizes upto 7/2.59 mm ACSR or other equivalent conductor (for Route Length per Phase) |
| 70 | Paving and stringing of conductor of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor (for Route Length per Phase) |
| 71 | Paving and stringing of conductor of 7/4.09 mm ACSR or other equivalent conductor (for Route Length per Phase) |
| 72 | Paving and stringing of conductor of 6/4.72 + 7/1.57 (Dog) or other equivalent conductor |
| 73 | Paving and stringing of conductor of one run of PVC cable line of all sizes with GI wire and reel insulator |
| 74 | Provision of guarding arrangement with two numbers earth pits excluding stay set erection - Flat guarding |
| 75 | Provision of guarding arrangement - Split neutral guarding |
| 76 | Erection of 11 / 22 KV AB switch (Horizontal) |
| 77 | Erection of 11 / 22 KV AB switch (Vertical) |
| 78 | Erection of HG Fuse Set, 3 Nos. (in Double Pole or Single Pole Structure) |
| 79 | Erection of top channel for double pole DT structure |
| 80 | Erection of bed channel 2 Nos. for double pole DT structure |
| 81 | Erection of belting angle 2 Nos. for double pole DT structure |
| 82 | Erection of cross bracing set for double pole DT structure |
| 83 | Structure earthing complete with 3 pits and earth loops for double pole DT structure |
| 84 | HT & LT LAS fixing and jumpering complete for double pole DT structure |
| 85 | Fixing of support insulator angle and erection of 3 Nos. pin insulator for double pole DT structure |
| 86 | HT jumpering complete for double pole DT structure |
| 87 | Painting of all clamps and other iron materials and painting of structure pole for double pole DT structure |
| 88 | LT bus arrangement for double pole DT structure |
| 89 | DT yard cleaning and making uniform surface for double pole DT structure |
| 90 | Erection of double pole DT structure complete as per TNEB standard including painting, feeders arrangement, colour washing of poles etc., fixing of HT / LT LAS and jumpering, 3 Nos. earth pits with earth trough except erection of DT (as per enclosed split up) |
| 91 | Erection of tapping channel for single pole DT structure |
| 92 | Erection of transformer bed structure for single pole DT structure |
| 93 | Structure earthing complete with 3 pits and earth loops for single pole DT structure |
| 94 | HT jumpering complete for single pole DT structure |
| 95 | Painting of all clamps, other materials and painting of structure pole for single pole DT structure |
| 96 | LT cable arrangement for single pole DT structure |
| 97 | Erection of central supporting arrangement for single pole DT structure |
| 98 | Erection of 11 KV single pole structure completewithout centre support without erection of DT (as per enclosed split up) |
| 99 | Erection of 11 KV single pole structure complete with centre support without erection of DT (as per enclosed split up) |
| 100 | Fixing of danger board |
| 101 | Erection of distribution transformer at structure - Upto 25 KVA |
| 102 | Erection of distribution transformer at structure - Above 25 KVA to 100 KVA |
| 103 | Erection of distribution transformer at structure - Above 100 KVA to 250 KVA |
| 104 | Erection of distribution transformer at structure - 500 KVA and above |
| 105 | Erection of Integrated DT Metering Arrangements / Whole Current Meter |
| 106 | Fixing of Modem including accessories |
| 107 | Erection of metering set 11 KV / 22 KV |
| 108 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit |
| 109 | Destruction of pole concreting at site |
| 110 | Retrieving grill from deteriorated RCC pole |
| 111 | Breaking the mass concrete of all supports |
| 112 | Dismantling of stay set complete including stay rod |
| 113 | Dismantling of stay set complete without stay rod |
| 114 | Dismantling of conductor of size upto 7/2.59 mm including transporting the conductors to the nearest road side and stocking in coils |
| 115 | Dismantling of conductor of size above 7/2.59 mm and upto 7/3.35 mm including transporting the conductors to the nearest road side and stocking in coils |
| 116 | Dismantling of conductor of size 7/4.09 mm including transporting the conductors to the nearest road side and stocking in coils |
| 117 | Dismantling of conductor of size 6/4.72 + 7/1.57 (Dog) or other equivalent conductor |
| 118 | Dismantling of guarding arrangement - Flat guarding |
| 119 | Dismantling of guarding arrangement - Split neutral guarding |
| 120 | Dismantling of V cross arm 3.5 feet |
| 121 | Dismantling of V cross arm 4.5 feet |
| 122 | Dismantling of V cross arm 5 feet |
| 123 | Dismantling of LT single phase cross arm |
| 124 | Dismantling of LT 3 phase cross arm |
| 125 | Dismantling of HT / LT TI fitting |
| 126 | Dismantling of HT pin insulator with pin 11 KV |
| 127 | Dismantling of HT pin insulator with pin 22 KV |
| 128 | Dismantling of HT pin insulator with pin 33 KV |
| 129 | Dismantling of LT pin with insulator |
| 130 | Dismantling of HT disc 11 KV with metal parts |
| 131 | Dismantling of HT disc 22 KV with metal parts |
| 132 | Dismantling of HT disc 33 KV with metal parts |
| 133 | Dismantling of LT shackle with metal parts |
| 134 | Dismantling of aluminium knob |
| 135 | Dismantling of HT LAS (3 Nos.) |
| 136 | Dismantling of LT LAS (3 Nos.) |
| 137 | Dismantling of guarding cross arm |
| 138 | Dismantling of tapping channel cross arm |
| 139 | Dismantling of double channel cross arm |
| 140 | Dismantling of open type fuse unit |
| 141 | Dismantling of 11 / 22 KV AB switch (Horizontal) |
| 142 | Dismantling of 11 / 22 KV AB switch (Vertical) |
| 143 | Dismantling of HG Fuse Set (3 Nos.) |
| 144 | Dismantling of top channel from double pole DT structure |
| 145 | Dismantling of bed channel 2 Nos. from double pole DT structure |
| 146 | Dismantling of belting angle 2 Nos. from double pole DT structure |
| 147 | Dismantling of structure earthing complete of double pole DT structure |
| 148 | Dismantling of HT & LT LAS and jumpering complete for double pole DT structure |
| 149 | Dismantling of support insulator angle and 3 Nos. pin insulator from double pole DT structure |
| 150 | Dismantling of HT jumpering complete of double pole DT structure |
| 151 | Dismantling of LT bus arrangement from double pole DT structure |
| 152 | Dismantling of danger board from double pole DT structure |
| 153 | Dismantling of tapping channel from single pole DT structure |
| 154 | Dismantling of transformer bed structure from single pole DT structure |
| 155 | Dismantling of structure earthing complete from single pole DT structure |
| 156 | Dismantling of HT jumpering complete of single pole DT structure |
| 157 | Dismantling of LT cable arrangement from single pole DT structure |
| 158 | Dismantling of danger board from single pole DT structure |
| 159 | Dismantling of central supporting arrangement from single pole DT structure |
| 160 | Dismantling of 11 KV single pole structure completewithout centre support |
| 161 | Dismantling of 11 KV single pole structure complete with centre support |
| 162 | Releasing of DT below 200 KVA from structure |
| 163 | Releasing of DT 200 KVA & above but below 500 KVA from structure |
| 164 | Releasing of DT 500 KVA from strcuture |
| 165 | Dismantling of Integrated DT Metering Arrangements / Whole Current Meter |
| 166 | Dismantling of Modem including accessories |
| 167 | Releasing of metering set 11 KV / 22 KV from strcuture |
| 168 | Manufacturing of special type clamps for rail poles, RS joists, tubular pole, distribution transformer strucutre with material |
| 169 | Alteration of back / stay clamp to suit works |
| 170 | Drilling of hole in the structure materials, clamps, etc., |
| 171 | AB switch or open type side arm stud cutting and drilling holes |
| 172 | Cutting of flat per cutting |
| 173 | Cutting of channel per cutting |
| 174 | Cutting of angle per cutting |
| 175 | Cutting of pipe per cutting |
| 176 | TI fitting welding with clamps |
| 177 | Cutting of RS joist pole |
| 178 | Welding in RS joist pole |
| 179 | Manufacturing of earth pipe clamp for structure including of drilling holes and welding with earth pipe |
| 180 | Fixing of one set of street light fixture with clamp and fitting of all sizes including cable jumpering and including transportation |
| 181 | Provision of street light switching arrangement including fixing of meter, wiring & service board etc. |
| 182 | Fixing of street light |
| 183 | Dismantling of street light switch box with pipe |
| 184 | Dismantling of one set of street light fixture with clamp and fitting of all types |
| 185 | Erection of MV / sodium vapour lamp including wiring and fixing at street light location including transportation |
| 186 | Dismantling of MV / sodium vapour lamp including wiring |
| 187 | Replacing the worn out service connection cables |
| 188 | Releasing and re-erection of single phase SC wire [during conductor or support change] |
| 189 | Releasing and re-erection of 3 phase SC wire [during conductor or support change] |
| 190 | Dismantling and fixing of Single Phase Meter |
| 191 | Dismantling ad fixing of Three Phase Meter |
| 192 | Providing of line spacers in LT line 1 phase |
| 193 | Providing of line spacers in LT line 3 phase |
| 194 | Fixing of LT shunt capacitor |
| 195 | Numbering of pole including base painting and with cost of paint |
| 196 | Painting of distribution transformer of all capacities (paint to be supplied by the TANGEDCO) including cleaning of DT |
| 197 | Painting of cement poles by distember coating including cost of distember |
| 198 | Painting of RSJ / tubular pole including cross arms, TI fittings, single coating |
| 199 | Painting of pole at ground |
| 200 | Painting of transformer structure poles with two coats for each structure |
| 201 | Painting of structure materials, distribution transformers with aluminium paint of structure poles and writing of transformer details (Brush to be owned by the contractor) (Paint to be supplied by Department) |
| 202 | Service connection details painting |
| 203 | Setting right the leaning pole in HT / LT at pin point location |
| 204 | Setting right the leaning pole in HT / LT at cutpoint location |
| 205 | Replacement of earthpipe per location |
| 206 | Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
| 207 | DT yard cleaning |
| 208 | Cleaning of RMU |
| 209 | Cleaning of Ring Fencing |
| 210 | Leveling of ground using Bul Dozer |
| 211 | Clearing of branches / trees with JCB |
| 212 | Engaging crane per hour (for handling of poles, metering set, DT, etc.) |
| 213 | Engaging JCB per hour (for extension works & maintenance works etc.) |
| 214 | Removing weed in substation yard / office premises |
| 215 | Bush clearance out side substation yard / office premises (light) |
| 216 | Jungle clearance such as kattu karuvai in the various area without uprooting |
| 217 | Jungle clearance such as kattu karuvai in the various area with uprooting |
| 218 | Clearing of tree branches of coconut tree |
| 219 | Clearing of tree branches of neem, tamarin, country, etc., |
| 220 | Distribution Transformer Maintenance - Silica Gel Replacement, Clamps Tightness, Busbar Maintenance, , HG Fuse Maintenance, AB Switch Maintenance, LT Open Type Maintenance, Inspection of Earthing & Tightness, Cleaning & Checking of DT Metering Box, Cleaning of DT, Oil Top Up |
| 221 | Fencing of distribution transformer structure at road side, fabrication and erection (including all materials) |
| 222 | Ground patrolling of HT lines during breakdown |
| 223 | Rectification of snapped HT line during breakdown - Weasel ACSR 7/2.59 or AAAC 7/2.50 sq. mm |
| 224 | Rectification of snapped HT line during breakdown - Rabbit ACSR 7/3.35 or AAAC 7/3.15 sq. mm |
| 225 | Rectification of snapped HT line during breakdown - Raccoon ACSR 7/4.09 sq. mm |
| 226 | Rectification of snapped HT line during breakdown - Dog ACSR 6/4.72 & 7/1.57 sq. mm |
| 227 | Rectification of snapped LT line during breakdown |
| 228 | Replacement of flashed over HT pin insulator, LAS, strain disc including jumpering, binding and transporting of required materials |
| 229 | Cleaning of 110 KV breakers including CTs and allied maintenance work in SS |
| 230 | Cleaning of 110 KV LAS in SS |
| 231 | Cleaning of 110 KV AB Switch and applying petrolium gelly (including consumables and petrolium gelly) in SS |
| 232 | Cleaning of 33/22/11 KV breakers and CTs and allied maintenance works in SS |
| 233 | Cleaning and checking of 110 KV bus insulators in SS |
| 234 | Cleaning and checking of11/ 22 / 33 KV bus insulators in SS |
| 235 | Cleaning and checking of 11/22/33 KV AB switches including tightening of bolt & nuts and applying petrolium gelly and rectifying defects (excluding consumables, bolt and nuts and petrolium gelly) in SS |
| 236 | Replacement of clamps in substation including jumpering in SS |
| 237 | Tightening of clamps in all 110/33/22/11 KV buses in SS |
| 238 | Checking of earth pit, tightening and replacing of bolts and nuts in SS |
| 239 | Cleaning of cable duct in SS |
| 240 | Cleaning of 110 KV power transformer insulator and assissting for all other maintenance work in SS |
| 241 | Cleaning and checking of 33/22/11 KV PT & station transformer and assisting of other maintenance work in SS |
| 242 | Cleaning and checking of capacitor bank and other accessories in SS |
| 243 | Replacement of droppers and jumpers, taking measurement, cutting and all allied works for single Kundah / Zebra in SS |
| 244 | Replacement of droppers and jumpers, taking measurement, cutting and all allied works for double Kundah / Zebra in SS |
| 245 | Releasing, testing and refixing of existing SV / MV lamps fittings in SS |
| 246 | Releasing, testing and refixing of existing FTL fittings in SS |
| 247 | Releasing / refixing of capacitor cell in SS |
| 248 | Painting of steel section in SS structure after cleaning and removing the rust etc. with materials |
| 249 | Knitting of chair including supply of materials |
| 250 | Stiching of files including materials |
| 251 | Binding of books upto A4 size |
| 252 | Binding of books above A4 size |
| 253 | Clearing scrub jungle for UG cable works |
| 254 | Dismantling and clearing away the brick / stone masonry walls of any thickness and built in cement mortar |
| 255 | Dismantling and clearing away the plain cement concrete |
| 256 | Dismantling and clearing away the RCC |
| 257 | Earth work excavation in all kind of soils within an initial lead of 10 m and lift of 2 m in trenches |
| 258 | Earth work excavation in soft disintegrated rock (not requring blasting) and depositing on bank within an intial lead of 10 m and lift of 2 m in trenches (narrow pits) less than 1 m width |
| 259 | Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohibited |
| 260 | Cutting open the blacktopped road surface including the cost for providing signal boards, lights, watch and ward to regulate the traffic, taking all precautions to protect the men, materials and the public from any possible accidents etc., using JCB / air compressor (or) drilling machines etc., wherever necessary (at anytime throughout the day) including taking all precautions to prevent any damages to the telecom and water lines |
| 261 | Dewatering the cable trench / duct using 5 HP diesel pumpset wherever necessary including hire charge for tools & plants, labour, lead and lifts, etc., complete |
| 262 | Refilling with excavated earth consolidating in layers and the top brought for line with the existing surface including cost of labour, lead, lift, etc., complete |
| 263 | Removal cut stone slabs / RCC cover slabs |
| 264 | Laying of PCC (1:3:6) using 20 mm HBG metal over the casing PVC pipes provided at the road crossings, streets, cable ducts, etc., including cost of all materials, lead, lift, labour charges, watch and ward, danger light, signal board, etc., complete |
| 265 | Supplying of RCC V troughs 11 KV and laying over the UG cable to proper guide and alignment inside the cable trench, painting letters of not less than 75 mm an either side of the troughs as directed by the Engineer incharge of works including the cost for all materials, transporting of troughs from the source to the destination upto 30 kms, stenciling, painting, brushing all leads and lifts, etc., complete |
| 266 | Laying of 11 KV RCC V troughs and laying over the UG cable to proper guide and alignment inside the cable trench, painting letters of not less than 75 mm an either side of the troughs as directed by the Engineer incharge of works including the cost of all materials, transporting of troughs from the source to the destination upto 30 kms, stenciling, painting, brushing all leads and lifts, etc., complete |
| 267 | Supplying of RCC V troughs 33 KV and laying over the UG Cable to proper guide and alignment inside the cable trench, painting letters of not less than 75 mm an either side of the troughs as directed by the Engineer incharge of works including the cost for all materials, transporting of troughs from the source to the destination upto 30 kms, stenciling, painting, brushing all leads and lifts, etc., complete |
| 268 | Laying of 33 KV RCC V troughs and laying over the UG cable to proper guide and alignment inside the cable trench, painting letters of not less than 75 mm an either side of the troughs as directed by the Engineer incharge of works including the cost of all materials, transporting of troughs from the source to the destination upto 30 kms, stenciling, painting, brushing all leads and lifts, etc., complete |
| 269 | Supplying, laying, jointing and fixing in position cement pipes of 225 mm dia in size in the excavated cable trench as directed by the Engineer incharge at site, including the cost of rope, sealing the ends with cement mortar, labour, lead, lifts, etc., complete |
| 270 | Uncoiling and laying of 11 KV HT cable in the excavated trench including drawing the cable trough RCC / GL / PVC pipes wherever necessary at road crossing, etc., without any damage including transporting of cables, tools and plants, labour, lead, lift, etc., complete |
| 271 | Uncoiling and laying of 33 KV HT cable 3x400 sq. mm in the excavated trench including drawing the cable trough RCC / GL / PVC pipes wherever necessary at road crossing, etc., without any damage including transporting of cables, tools and plants, labour, lead, lift, etc., complete |
| 272 | Uncoiling and laying of 33 KV HT cable 1x630 sq. mm in the excavated trench including drawing the cable trough RCC / GL / PVC pipes wherever necessary at road crossing, etc., without any damage including transporting of cables, tools and plants, labour, lead, lift, etc., complete |
| 273 | Cutting the cable of required length and sealing the ends with suitable end caps for XLPE cables including cost of all materials, tools and plants, leads and lifts, etc., complete |
| 274 | Transporting of the remains of the empty cable drums (iron materials) to the stores for devolution including loading and unloading, leads and lifts, etc., complete |
| 275 | Supply and erection of cable marker in RCC (1:2:4) using 20 mm HBS metal of size 0.3 x 0.6 m and of 100 mm thick, engarving letters \"TANGEDCO UG CABLE\", painting the engraved letters, fixing the cable marker in a bed of PCC (1:3:6) using 20 mm HBS metal of size 0.45 x 0.3 x 0.45 m including cost of all materials, labour, transporting to the destination, all leads and lifts, etc., complete |
| 276 | Providing watch and ward required at site as directed by the Engineer incharge |
| 277 | Uprooting of tree cutting charges including labour charges and power machine hire charges |
| 278 | Providing crusher dust instead of sand with good quality to a depth upto 150 mm (6\") including cost of materials, labour, leads and lifts, etc., complete |
| 279 | Provision for replacement of damaged water pipe line to the original arrangement during execution of cable work, including cost of all materials, labour, transportation, lead and lift, etc., complete - Upto 4\" dia pipes (LMR) |
| 280 | Provision for replacement of damaged water pipe line to the original arrangement during execution of cable work, including cost of all materials, labour, transportation, lead and lift, etc., complete - Upto 6\" dia pipes (LMR) |
| 281 | Supplying and laying of HDPE pipe 110 mm dia 6 mm wall thickness by using of trenless technology horizondal direction drilling method for road crossing minium 55 metres inclusive of incertion of HT cables in HDPE pipes |
| 282 | Supplying and erection of cast iron 250 mm dia pipes at railway crossing by adopting trenchless method including cost of all materials, labour, transporting, lead, lift, etc., complete |
| 283 | Supplying and erection of cast iron 250 mm dia pipes at railway crossing by open cutting method including cost of all materials, labour, transporting, lead, lift, etc., complete |
| 284 | Supplying and erection of GI 150 mm dia pipe for drainage / bridge / canal crossings including cost of all materials, labour, transportation, lead, lift, etc., complete |
| 285 | Construction of RCC trench with removable RCC slab including cost of all materials, labour, lead, lift, transporting, centering charges, curing with all lead, lifts, etc., complete (in 1.35 mts depth) |
| 286 | Construction of RCC trench with removable RCC slab including cost of all materials, labour, lead, lift, transporting, centering charges, curing with all lead, lifts, etc., complete (in 1.20 mts depth) |
| 287 | Erection of 11 KV 3x120 sq. mm and 3x300 sq. mm outdoor / indoor termination kit (LMR) |
| 288 | Erection of 11 KV 3x120 sq. mm and 3x300 sq. mm straight joint kit (LMR) |
| 289 | Erection of 33 KV 3x400 sq. mm indoor / outdoor terimination kit (LMR) |
| 290 | Erection of 33 KV 3x400 sq. mm straight joint kit (LMR) |
| 291 | Erection of 33 KV 1x630 sq. mm indoor / outdoor terimination kit (LMR) |
| 292 | Erection of 33 KV 1x630 sq. mm straight joint kit (LMR) |
| 293 | Supplying and laying of 160 mm dia PVC pipe of 6 KSC of approved quality and of reputed make for road and drainage crossing for the cable laying at road drainage crossing including cost of all materials, labour, lead, lifts, etc., complete |
| 294 | Uncoiling and laying of LT cable of size 4x120 and 4x240 sq. mm in the excavated trench including drawing the cable trough RCC / GL / PVC pipes wherever necessary at road crossing, etc., without any damage including transporting of cables, tools and plants, labour, lead, lift, etc., complete |
| 295 | Uncoiling and laying of LT cable of size 4x25 sq. mm and 2x16 sq. mm for service connection including excavation of trench, laying of cable, refilling of trench and termination of cables and transportation |
| 296 | Construction of RCC pedestal of size 0.75 x 0.25 x 1.05 m (2 Nos) for fixing 6 way pillar box with 15.76 kgs of steel reinforcement in 0.394 cubic metre of ROC (1:2:4) mix concrete using 20 mm HBS metal, plastering (1:5) 12 mm thick around the pedestal, colour washing two coats over one coat of primer using white cement including cost of all materials, labour, transportation of all materials, fixing the pillar box in proper alignment over the pedestal, tools and plants, lead, lift, etc., complete |
| 297 | Construction of RCC pedestal of size 0.60 x 0.25 x 1.05 m (2 Nos) for fixing 4 way pillar box with 13.88 kgs of steel reinforcement in 0.315 cubic metre of ROC (1:2:4) mix concrete using 20 mm HBS metal, plastering (1:5) 12 mm thick around the pedestal, colour washing two coats over one coat of primer using white cement including cost of all materials, labour, transportation of all materials, fixing the pillar box in proper alignment over the pedestal, tools and plants, lead, lift, etc., complete |
| 298 | Construction of RCC pedestal of size 0.60 x 0.25 x 1.05 m (2 Nos) for fixing mini pillar box with 13.88 kgs of steel reinforcement in 0.315 cubic metre of ROC (1:2:4) mix concrete using 20 mm HBS metal, plastering (1:5) 12 mm thick around the pedestal, colour washing two coats over one coat of primer using white cement including cost of all materials, labour, transportation of all materials, fixing the pillar box in proper alignment over the pedestal, tools and plants, lead, lift, etc., complete |
| 299 | Painting two coats of enamal emulsion paint over one coat of metal white primer for 6 way pillar boxes by using spray paint including cost of materials, lead, lift, labour, etc., complete |
| 300 | Painting two coats of enamal emulsion paint over one coat of metal white primer for mini pillar boxes by using spray paint including cost of materials, lead, lift, labour, etc., complete |
| 301 | Supplying and pasting of stencil cut stickers with good adhesives with lettres showing \"TANGEDCO\", \"440 V\" and \"Danger\" with skull and bone symbols, etc., including cost all materials, lead, lift, labour, etc., complete (LMR) |
| 302 | Construction of RCC trench with removable RCC slab including cost of all materials, labour, lead, lift, transporting, centering charges, curing with all lead, lifts, etc., complete (in 0.75 mts depth) |
| 303 | Dismantling of 6 or 4 way pillar box including associated accessoris, loading on the vehicle, transporting, unloading at stores and stacking |
| 304 | Dismantling of mini pillar box including associated accessoris, loading on the vehicle, transporting, unloading at stores and stacking |
| 305 | Supply of 11 KV 3x120 sq. mm indoor termination kit |
| 306 | Supply of 11 KV 3x120 sq. mm indoor straight joint kit |
| 307 | Supply of 11 KV 3x120 sq. mm outdoor termination kit |
| 308 | Supply of 11 KV 3x120 sq. mm outdoor straight joint kit |
| 309 | Supply of 11 KV 3x300 sq. mm indoor termination kit |
| 310 | Supply of 11 KV 3x300 sq. mm indoor straight joint kit |
| 311 | Supply of 11 KV 3x300 sq. mm outdoor termination kit |
| 312 | Supply of 11 KV 3x300 sq. mm outdoor straight joint kit |
| 313 | Supply of 33 KV 3x400 sq. mm indoor termination kit |
| 314 | Supply of 33 KV 3x400 sq. mm indoor straight joint kit |
| 315 | Supply of 33 KV 3x400 sq. mm outdoor termination kit |
| 316 | Supply of 33 KV 3x400 sq. mm outdoor straight joint kit |
| 317 | Supply of 33 KV 1x630 sq. mm indoor termination kit |
| 318 | Supply of 33 KV 1x630 sq. mm indoor straight joint kit |
| 319 | Supply of 33 KV 1x630 sq. mm outdoor termination kit |
| 320 | Supply of 33 KV 1x630 sq. mm outdoor straight joint kit |