Supply Of Materials For The Construction Of School Kitchen To Govt Primary School Singapur Village Mukunda Gp Under Mgnrega Scehme. - Handling Loading And Unloading 3Percentage On Material Muk001,Labour Charges For Lifting And Placing In Position And Making Connection At 7Percentage On Material Muk001,Polyenthylene Water Storage Tank Of Specified Capacity L Muk001,Add Brush At 1Percentage On Cost Of Paint Muk001,Enamel Metal Paint Muk001,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percentage On Cost Of Paint Muk001,Ready Mix Primer Paint (Ready Mix Red Lead Paint) Muk001,Add Hom Of Welding And Grinding Machine At 4Percentage On Material Muk001,Welder Grade I Muk001,Fitter Class I Muk001,Ms Flat Muk001,M.S Rods Muk001,Mathi/Nandi Wood Planks For Panels 25 Mm Thick Muk001,Mathi/Nandi Wood Scantling Muk001,Honne Wood Muk001,Hom Of Machinaries For Planing Muk001,Carpenter Assistant Muk001,Add Cutting And Other Wastage 5Percentage Muk001,Honnewood Planks For Panels 20 Mm Thick Muk001,Pigment Muk001,Cudddapah Slab 2.5 Cms Thick Muk001,Painter Class I Muk001,Add Brush, Putty, Sand Paper, Roller At 5Percentage On Cost Of Paint Muk001,Plastic Emulsion Paint Muk001,Add Providing And Removing Scaffolding At 3Percentage On Labour Muk001,Add Handling , Loading And Unloading At 2Percentage On Material Muk001,Casurina Poles 75 - 100 Mm Dia Muk001,Jungle Wood Runners And Planks Muk001,Silver Oak Or Equivalent Planks 38 Mm Thick Muk001,Add Sundries Charges At 2 Percentage On Material Muk001,Add Handling , Loading And Unloading At 1Percentage On Material Muk001,Casurina Poles 100 - 150 Mm Muk001,Brick Muk001,Binding Wire Muk001,Tmt Bars Fe 500 Muk001,Hom Of Vibrator 0.71 Days Muk001,Plasticizer / Super Plasticizer Muk001,Mason Class Ii (With Tools) Muk001,Mason Class I (With Tools) Muk001,Mixer (Concrete Small Used In Culvert) Muk001,Bond Stone 20 X 20 X 45 Cm Muk001,Size Stone 20 X 20 X 25 Cms Muk001,Add Watering Charges At 1 Percentage On Material Muk001,Mixer (Concrete) - 1 Cum Capacity Muk001,Portland Cement Muk001,Broken Stone Aggregate 12 Mm To 10 Mm Size Muk001,Broken Stone Aggregate 20 Mm Size Muk001,Broken Stone Aggregate 40 Mm Size Muk001,Tractor - 40 Hp Muk001,Compensation For Earth Taken From Private Land Muk001,Water Muk001,Three Wheel 80-100 Kn Static Roller Muk001,Water Tanker 6 Kl Capacity Muk001,Motor Grader At 50 Cum Per Hour Muk001,Dozer D-50 For Spreading At 200 Cum Per Hour Muk001,Unloading Of Earth As Per Item 1.1 (Iv) Muk001,Loading Of Earth As Per Item 1.1 (Ii) Muk001,Tipper 5.5 Cum With 10 Tonne Capacity Muk001,Hydraulic Excavator 0.9 Cum Bucket Capacity At 60 Cum Per Hour Muk001,Coarse Sand (Zone Iii) Muk001,Boulders Muk001,Over Head & Other Miscellaneous Charges Muk001,Add Sundries Charges At 1 Percentage On Material Muk001