Design, Manufacture, Supply And Commissioning Of Refrigeration Plant For Mdl Yard 16401/02/03/04/05/06 Of Project 06(Six) Next Generation Offshore Patrol Vessels For Indian Coast Guard. Design, Manufacture, Supply And Commissioning Of Refrigeration Plant For Mdl Yard 16401/02/03/04/05/06 Of Project 06(Six) Next Generation Offshore Patrol Vessels For Indian Coast Guard. , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling.1 Set=One Complete Filling , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 30Th Nov,2025 -Stw - Delivery Date: 31St July,2026 -Hats - Delivery Date: 31St Aug,2026 -Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.05.2025 To 30.04.2026) , Extra Man-Days - 2Nd Year (From 01.05.2026 To 30.04.2027) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling. 1 Set=One Complete Filling. , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 30Th Apr 2026,Stw - Delivery Date: 31St Dec 2026, Hats - Delivery Date: 30Th Jan,2027, Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.10.2025 To 30.09.2026) , Extra Man-Days - 2Nd Year (From 01.10.2026 To 30.09.2027) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling. 1 Set=One Complete Filling. , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 30Th Sep,2026,Stw - Delivery Date: 31St May,2027,Hats - Delivery Date: 30Th Jun,2027,Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.03.2026 To 28.02.2027) , Extra Man-Days - 2Nd Year (From 01.03.2027 To 28.02.2028) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling. 1 Set=One Complete Filling. , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 28Th Feb,2027 -Stw - Delivery Date: 31St Oct,2027 -Hats - Delivery Date: 30Th Nov,2027 -Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.08.2026 To 31.07.2027) , Extra Man-Days - 2Nd Year (From 01.08.2027 To 31.07.2028) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling. 1 Set=One Complete Filling. , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 31Th July,2027 -Stw - Delivery Date: 31St March ,2028 -Hats - Delivery Date: 30Th Apr,2028 -Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.01.2027 To 31.12.2027) , Extra Man-Days - 2Nd Year (From 01.01.2028 To 31.12.2028) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Refrigeration Plant Of 2.15Tr Capacity Along With Two Condensers, 2 Compressors, Control Panels, Commissioning Consumables (First Charge Of Oils, Coolants, And Greases For The Equipment) And All Accessories And Instruments As Per Sotr , Condenser Cooling Sea Water Pump With Control Panel And All Accessories (Including Pressure Gauges With Protecting Cover For Suction And Discharge Of The Pumps Along With Three Way Cocks - One Set For Each Pump) As Per Sotr. Icg Ngopv , Push Button For Man Locked Alaram , Refrigerant Cylinders For One Complete Filling. 1 Set=One Complete Filling. , Instrumentation And Valves As Per Sotr , Supply Of Piping & Cabling As Per Sotr , On-Board Spares For Refrigeration Plant And Pump , Documentation Of Refrigeration Plant , Air Cooling Units For Cold Room And Cool Room Including Accessories (Expansion Valves, Thermostats Etc) , Installation Supervision - Delivery Date: 31St Dec,2027,Stw - Delivery Date: 31Th Aug,2028,Hats - Delivery Date: 30Th Sept,2028,Commissioning , Manning Charges For 8 Hr Shift -30 Shift , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months , Extra Man-Days - 1St Year (From 01.06.2027 To 31.05.2028) , Extra Man-Days - 2Nd Year (From 01.06.2028 To 31.05.2029) , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months => Limited