}

1 Part-I 2 Assistance In The Operation Of Stacker/Re-Claimer Of Coal Handling Plant ‘B’Tps, Obra.(One Shift Of 8 Hrs. Considered As 01 Job.) 3 Routine Checking, Operation & Break Down Maint. Of Fog Cannon Machines Of Coal Handling Plant ‘B’Tps, Obra. , obra-Uttar Pradesh

Boards / Undertakings / PSU has published 1 Part-I 2 Assistance In The Operation Of Stacker/Re-Claimer Of Coal Handling Plant ‘B’Tps, Obra.(One Shift Of 8 Hrs. Considered As 01 Job.) 3 Routine Checking, Operation & Break Down Maint. Of Fog Cannon Machines Of Coal Handling Plant ‘B’Tps, Obra. . Submission Date for this Tender is 01-10-2024. Footwears Tenders in obra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

45253914
1 Part-I 2 Assistance In The Operation Of Stacker/Re-Claimer Of Coal Handling Plant ‘B’Tps, Obra.(One Shift Of 8 Hrs. Considered As 01 Job.) 3 Routine Checking, Operation & Break Down Maint. Of Fog Cannon Machines Of Coal Handling Plant ‘B’Tps, Obra.
Open Tender
Indian
Uttar Pradesh
Obra
01-10-2024

Tender Details

Tender For Works Of Assistance In The Operation Also Breakdown Maintenance Of Re-Claimer ( Old And New) And Fog Cannon Of Chp,Obra Tps, Obra, 1 PART-I 2 Assistance in the operation of Stacker/Re-claimer of Coal Handling Plant ‘B’TPS, Obra.(One shift of 8 hrs. considered as 01 job.) 3 Routine Checking, Operation & Break down Maint. of Fog Cannon machines of Coal Handling Plant ‘B’TPS, Obra. (One shift of 8 hrs01 job per day.) 4 PART-II ( Annual Maintenance work of Old/New Stacker Re-Claimer of CHP, BTPS. ) 5 Replacement of damaged side rubber packing of boom/intermediate conveyor of old/New Stacker/Re-claimer. 6 Replacement of box duct packing of reclaiming/stacking chute of conveyor No. 16, K-10 related to old/new Stacker/Re-claimer. 7 Replacement of bolt of damaged teeth/damaged teeth by repaired/ new one bucket wheel of old/new Stacker/ Re-claimer. 8 Replacement of tensioning screw by old & usable/new, after adjustment of belt and to provided proper tension of belt boom/intermediate conveyor of old/new S/R. 9 Proper winding of unwounded cable on control cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr. 10 Proper winding of unwounded cable on power cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr. 11 Proper cleaning & greasing of spur gear of slewing system old /new Stacker/Re-claimer. 12 Draining out the contaminated oil of the tank of hydraulic unit after complete cleaning & refilling with new/ old along with shifting from store to site and vice versa. 13 Replacement of damaged coupling bolts along with bush of flexible coupling travel system/boom conveyor / slewing system. 14 Replacement of contaminated oil/refilling in reduction gear boxes of travel / slewing / boom/intermediate conveyor/bucket wheel. 15 Cleaning & greasing of driving bogies and non driving bogies of old/new Stacker/Re-claimer. 16 Proper cleaning and greasing of chain along with chain sprocket/reeling/guide wheel bogies of control/power cable reeling drum of old/new Stacker/Re-claimer. 17 Replacement/readjustment of brake shoe of brake system of old/new Stacker/Re-claimer. 18 Re-placement of damaged oil seals of reduction gear boxes of boom/intermediate conveyor, bucket wheel of old/new Stacker/Re-claimer: 19 Replacement of damaged oil seal ‘O’ ring of fluid coupling FCU 16.25 of old/new Stacker/Re-claimer: 20 Replacement of damaged resilient plate, multi disc of fluid coupling of new/old Stacker/ Re-claimer: 21 Replacement of rubber pad of vibrating feeder tray of new/old stacker Re-claimer: 22 Replacement of rubber packing of vibrating feeder tray of old/new Stacker/Re-claimer: 23 Complete cleaning of chocking oil/grease circulating hoses, ‘T’ joints NRV/grease pump and replacement of same if required of old /new Stacker/Re-claimer: 24 Repairing of damaged shaft of pulley after dismantling and removal from foundation including dismantling and re-fixing of tray at boom/intermediate conveyor at side of old/new Stacker/Re-claimer: 25 Re-adjustment of rail clamps after re-railment in its poison on travel rail of old/new Stacker/Re-claimer: 26 Alignment of complete system of motor to reduction gear boxes of slewing system/travel system/boom intermediate conveyor/bucket wheel of old/new Stacker/Re-claimer: 27 Cleaning/ replacement/repairing of pressure relief valve/directional valve, NRV of discharge line/elbow of discharge line/oil filters of new stacker/Re-claimer: 28 Replacement/repairing of axial piston pump of hydraulic unit along with the alignment with motor for hoisting system of new/Stacker/RE-claimer: 29 Servo coating/greasing of wire rope and moving wheel of travel trolley conveyor 16/K-10 hoisting system of old /new Stacker /Re-claimer: 30 Repairing/Replacement of thruster assembly of travel /slewing /hoisting system of new /old Stacker Re-claimer: 31 Cleaning & greasing ofslewing spur gear and boom conveyor hydraulic cylinder hings of new Stacker Re-claimer: 32 Cleaning & oiling of slewing pivot bearing of old Stacker/ Re-claimer. 33 Overhauling of angular gear box of power/control cable reeling drum system of new/old Stacker /Re-claimer: 34 Overhauling of oil lubricating pump for bucket drive gears NRV of slewing gears. 35 Fabrication & installation of duct plate assembly for intermediate conveyor at site of new Stacker/Re-claimer. 36 Removal of top cover of the reduction gear boxes of travel system of old/new S/R to check the gear teeth and bearings. 37 Adjustment of belt while going out on drive non-drive pulley along with roller structures of boom/intermediate conveyor of old/new Stacker/Re-claimer: 38 Replacement of side plate of Re- claiming /stacking box duct of old/new S/R, conveyor 16K-10 after fabrication at side: Upto 2 Mtrs. 39 Above 2 Mtrs. 40 Replacement of damaged fluid coupling by new/repaired: 41 Replacement of damaged bearing /oil seals of raping gear box of motor assembly of power and control cable reeling drum along with its alignment for new/old Stacker Re-claimer: 42 Replacement of damaged oil seals/bearings of gear boxes of travel system of old/new Stacker /Reclaimer: 43 Replacement of different type of rollers at the box duct of conveyor of old/new Stacker/Reclaimer 44 Replacement of pollard/covered bearing of different pulleys of conveyor system except gravity take up pulley, drive pulley: 45 Repair of damaged guide channel of gravity take up including all cutting welding and transportation of material from store to site and back: 46 Different works to be carried out in the gear box of old/new stacker-Reclaimer system 47 Removal of the top cover of the gear box and to install the same after checking/completion of the work. 48 Replacement of the input pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 49 Replacement of the intermediate pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 50 Replacement of the output shaft fitted with wheel/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box.

Key Value

Document Fees
INR 1180 /-
EMD
INR 55000.0 /-
Tender Value
INR 26.84 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail