Tender For Civil Work For Independent Loading Conv. 27020393 10 10 10 PROVIDING & LAYING RCC M30 2,969.9 M3 30 Sand Filling 4,749.6 M3 40 Reinforcement shifting, bending, binding 237.592 TO 20 AREA DRESSING, LEVELLING & DISPOSAL OF 15,832 M2 50 DISMANTLING OF FLOOR PCC & SHIFTING OF D 270 M3 Email : ANKITA.PRIYADARSHANI@AMNS.IN Contact : Name : Ankita Priyadarshani Item Details : SCOPE OF WORK- VENDOR • Vendor has to carry out the civil works. • Vendor has to deploy the adequate manpower’s to execute these jobs. • Vendor has to deploy the required equipment’s like tractor, excavator, Miller, road roller, JCBs, Excavator (Poclain Machine) etc. and all other required equipment’s to complete this job. • Sand, gravels, ply, and all other consumables are in the scope of vendor. • Vendor has to execute the job as per the instruction from Engineer – in charge. • Dumpers if needed for debris shifting are to be arranged by contractors. • Hard barricading is mandatory for all excavated pits till its completion. • All material, tools tackles for hard barrication is considered in contractor’s scope of work. • Providing and laying of RCC M30 is in contractor scope of work. • Fixing of Reinforcement as per Drawing is considered in Contractor scope of work. • Shifting, Cutting, Bending, binding <(>&<)> placing reinforcement Fe500D grade for all heights. SCOPE OF WORK- AMNS 1. AM/NS will provide the reinforcement bars. 2. AM/NS will provide the single point water supply. 3. AM/NS will provide the single point Electrical supply. ------------------------------------------------------------ PROVIDING AND LAYING OF RCC M30 - 2,969.90 Cu.m Providing, lifting, hoisting and laying reinforced cement concrete (M-30) to all type of concreting work or in places as shown in the drawing or as directed, with 20 mm and downgraded size black hard crusher broken chips of approved quality from approved quarry including mixing and vibrio compacting to proper shape and size, level and plumbs and finishing the exposed surface smooth, scaffolding including watering and curing the required period, including cost of all materials, labour, conveyance, loading and unloading, royalties, sundries, tools <(>&<)> plants etc., complete as per the direction of Engineer-in-Charge. Supply and laying of separation membrane 150 micron is in the scope of vendor. ------------------------------------------------------------------- REINFORCEMENT WORK - 237.592 TON Foundation as per approved drawing and specification including cutting, bending, welding and positioning as per drawing / direction of Engineer-in-Charge. Reinforcement bar will be provided by AM/NS. -------------------------------------------------------------------- SAND FILLING - 4,749.60 Cu.m P<(>&<)>L sand filling including all materials, labour, carriage as per direction of Engineer-in-charge. Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS Pellet Plant Paradeep Village- Udayabatta, Paradeep,Tahasil- Kujang Dist:Jagatsinghpur,754142,Odisha,India GSTIN 21AAACE1741P1ZT PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000120288 Date 12.09.2024 Submission Date 19.09.2024 Coll Req No 27020393 AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Amit Basak Contact Email AMIT.BASAK@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details --------------------------------------------------------------------- Area dressing, levelling <(>&<)> disposal - 15,832.00 M2 Cleaning of debris and foriegn material and leveling of floor as per direction of Engineer-in-charge. --------------------------------------------------------------------- Dismantling of civil structures - 270.00 m3 Dismantling of civil structures as per direction of Engineer-in-charge.