Supply Of Filters Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing At Manufacturer Works, Packing, Supply Of Filters As Per Material Requisition , Purge Hydrogen Filter Including Supply Of Psvs As Loose Supply Items If Required As Per Code. , Vr Feed Pump Suction Strainers Including Supply Of Psvs As Loose Supply Items If Required As Per Code. , Short Circulation Strainer Including Supply Of Psvs As Loose Supply Items If Required As Per Code. , Supervision Charges Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing & Training Chrages As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing & Training Chrages(Optional)As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour (Beyond Normal 8 Hours On Normal Working Days). ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing & Training Chragesas Per Details Mentioned In Material Requisition(Optional)For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). ( Bidders To Quote Over Timerate Per Hour ) , 2 Years Normal Operational & Maintenance Spares - Applicable For All Filters , 2 Years Normal Operational & Maintenance Spares (As Per Vendor Recommendation)Item Sr No 1.00,Purge Hydrogen Filter ( Tag No-1P30-Mgn-2771) (Spare No. - 4.01(Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 4.02 (Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 4.03 , Spare No. - 4.04 , Spare No. - 4.04 , Spare No. - 4.06 , Spare No. - 4.07 , Spare No. - 4.08 , Spare No. - 4.09 , Spare No. - 4.10 , 2 Years Normal Operational & Maintenance Spares (As Per Vendor Recommendation)Item Sr No 2.00,Vr Feed Pump Suction Strainers ( Tag No-1P30-Str-2274A/B/C) (Spare No. - 5.01(Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 5.02 (Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 5.03 , Spare No. - 5.04 , Spare No. - 5.05 , Spare No. - 5.05 , Spare No. - 5.07 , Spare No. - 5.08 , Spare No. - 5.09 , Spare No. - 5.10 , 2 Years Normal Operational & Maintenance Spares (As Per Vendor Recommendation)Item Sr No 3.00,Short Circulation Strainer ( Tag No-1P30-Str-2875) (Spare No. - 6.01(Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 6.02 (Mention The Spare Name And Qty In Unpriced Schedule) , Spare No. - 6.03 , Spare No. - 6.04 , Spare No. - 6.05 , Spare No. - 6.06 , Spare No. - 6.06 , Spare No. - 6.08 , Spare No. - 6.09 , Spare No. - 6.10 , Addition / Deletion Rate Applicable For All Items , Unit Rate Per Kg For Addition Or Deletion Of Clips Such As Piping Support Clips. Support Clip With Pad Material: Sa 516 Gr 60N / 70N And Sa387 Gr 22 Cl2 Unit Rate Shall Include Mechanical Design + Fabrication + Supply. Insulation Clips Shall Not Be Considered For This Line Item ( These Shall Be Included In Main Supply ) , Unit Rate For Reduction Or Increase Per Kg For Lower Skirt / Saddle Support. This Line Item Shall Not Be Considered In Case Of No Change On The Skirt Length / Sadde Height As Specified In Respective Mechanical Datasheet For Columns. Skirt / Saddle/Leg/Lugs External Support Material - Sa 516 Gr 60N / 70N And Sa387 Gr 22 Cl2 Unit Rate Shall Include Mechanical Design + Fabrication + Supply , Unit Rate Per Kg For Addition / Deletion For Finished Weight Of Forging 2 -24Of Moc Sa105 And Sa182/336 F22 Cl3 And Withrating #150 To #1500.