1.Black Topping To Alathur Theruku Theru Road Pipeculvert Rcc Slab Culvert In Alathurpanchayat. 1.Black Topping To Alathur Theruku Theru Road Pipeculvert Rcc Slab Culvert In Alathurpanchayat , 1.Black Topping To Alathur Theruku Theru Road @ Pipeculvert Rcc Slab Culvert In Alathurpanchayat , Picking 5 Cm To 10 Cm Old Metalled Surface And Sectioning - 1 Sq.M , Construction Of Granular Sub Base By Providing Well Graded Material (25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %,4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15%)& (The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer (Mix -In - Place Method). , Providing And Laying Water Bound Macadam Grading - Ii ( 75Mm To 22.40Mm)Irc Hbgmetalconsisting Of Clean, Crushed Aggregates Mechanincally Interlocked By Rolling And Bonding Together With Screening Binding Material Of 0.24 Cum For 10 Sqm (The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 20 & 6% Repectively)And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer (Mix -In - Place Method) , Providing And Laying Water Bound Macadam Grading - Iii(63Mm To11.20Mm)Irc Hbg Of 75Mm Consolidated Thickness Consisting Of Clean, Crushed Aggregates Mechanincally Interlocked By Rolling And Bonding Together With Screening Binding Material Of 0.24 Cum For 10 Sqm (The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 20 & 6% Repectively) And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer As Per Clause 405 Of Mord Revision I(Mix -In - Place Method) Rate For 10Sqm , Applying Tack Coatover Wbm Surface At 4Kg / 10 Sq.M Including Labour For Spraying, Hire Charges For Bitumen Sprayer Etc. Comp. , Providing And Layiing Pre-Mix Carpet 20Mm Thickness Using 0.18Cum Of 13.2 Irc Machine Crushed Metal 0.09Cum Of 11.2Mm Irc Machine Crushed Metal With 14.60Kg Of Bitumenfor Pre-Mixing 10 Sqm Of Pre-Mix Carpet And Laying Seal Coat Type A Using .09 Cum Of 6.70Mm Irc Hbg Chips With 9.80 Kg Of Bitumen For 10Sqm Including Cost And Conveyance Of Materials To The Departmental Metric Gauge For Pre-Measurement Heating The Bitumen Boiler Heating The Aggregate And Mixing Them With Bitumen In Mini Hot Mix Plant For Pre-Mix Carpet And Rolling By 80-100 Kn Power Roller Including Labour Charges For Spreading Hire And Fuel Charges For Mini Hot Mix Plant, Bitumen Boiler, All Other Tools And Plants Employed Etc., Complete , Providing And Laying Gravel To 100Mm Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Wateringand Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction , I). Rcc Slab Culvert Sub Estimate: , Earth Work Excavation Depositing On Bank With Initial Lead And Lift As Per Ss 20 B Incl Cost And Conveyance Of All Charges Etc Complete , Sand Filling With Good River Sand Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Filling Etc.,Complete. , C.C.1:4:8 Using 40Mm Stone Jelly Including Cost And Conveyance Of All Materials To Site And Cost Of Labour And All Other Incidental Charges Etc.,Complete. , C.C. 1:3:6 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And Cost Of Labour Charges Etc,Complete , C.C. 1:1.5:3 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And Cost Of Labour Charges Etc,Complete , Supply And Erection Of Centring Incl All Necessary Supports And Strutting All Cross Bracings Etc Complete , I) Below Shtrutting , Ii) Above Shtrutting , Cost And Supply And Fabrication Steel Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc.,Complete , Ii). Rcc Pipe Culvert Sub Estimate: , Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. , Supplying And Filling Foundation And Basement With Filling Sand In Layers Not More Than 15Cm . Thick Well Ramed, Watered And Compacted Complete Complying With Stanard Specification. , Cement Concrete 1 :4 : 8Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. , Cement Concrete 1 : 3: 6Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. , Supplying And Erection Of Centering For Retaining Wall And Bathing Ghatincluding Cost And Conveyance Of All Material And All Labour Charges Etc, Complete , Providing And Laying Reinforced Cement Concrete Pipe 900 Mm Dia Culverts On First Class Bedding Of Granularmaterial In Single Row Includingfixing Collar With Cement Mortar 1:2 But Excluding Excavation, Protection Works, Backfilling, Concrete And Masonry , Provision For Name Board Charges , Gst Amount For Providing Service To Government Contract Works For The Above Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amountabove This Row In Column Bb For All Works In This Package} (Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders (Itb) Of Sbd)