| 1 | Sch\"A\" Part-I (Building Works) |
| 2 | Lumpsum price worked out by the contractor for \"Building works\" as listed in Sch \"A\" Part -I above/below the lumpsum price of Rs 36,32,673.25 as inserted by MES for Sch \"A\" Part -I . |
| 3 | Sch\"A\" Part-II (SITE CLEARANCE, EARTH WORK & EXCAVATION) |
| 4 | Lumpsum price worked out by the contractor for \"Site clearance, Earth Work and Excavation\" as listed in Sch \"A\" Part II above/below the lumpsum price of Rs 1,23,459.66 as inserted by MES for Sch \"A\" Part -II. |
| 5 | Sch\"A\" Part-III (ROAD/PATH) |
| 6 | Lumpsum price worked out by the contractor for\"ROAD/PATH\" as listed in Sch \"A\" Part III above/below the lumpsum price of Rs 1,55,746.35 as inserted by MES for Sch \"A\" Part -III. |
| 7 | Sch\"A\" Part-IV (EXTERNAL ELECTRIC SUPPLY) |
| 8 | Lumpsum price worked out by the contractor for\"EXTERNAL ELECTRIC SUPPLY\" as listed in Sch \"A\" Part IV above/below the lumpsum price of Rs 48,597.54 as inserted by MES for Sch \"A\" Part -IV. |
| 9 | Sch\"A\" Part-V (Internal Electric Supply) |
| 10 | Lumpsum price worked out by the contractor for\"Internal Electric Supply\" as listed in Sch \"A\" Part V above/below the lumpsum price of Rs 4,15,351.77 as inserted by MES for Sch \"A\" Part -V. |
| 11 | Sch\"A\" Part-VI (SEWAGE DISPOSAL) |
| 12 | Lumpsum price worked out by the contractor for\"SEWAGE DISPOSAL\" as listed in Sch \"A\" Part VI above/below the lumpsum price of Rs 99,783.57 as inserted by MES for Sch \"A\" Part -VI. |
| 13 | Sch\"A\" Part-VII(External Water Supply) |
| 14 | Lumpsum price worked out by the contractor for\"External Water Supply\" as listed in Sch \"A\" Part VII above/below the lumpsum price of Rs 10,979.80 as inserted by MES for Sch \"A\" Part -VII. |
| 15 | Sch\"A\" Part-VIII (INTERNAL WATER SUPPLY) |
| 16 | Lumpsum price worked out by the contractor for\"INTERNAL WATER SUPPLY\" as listed in Sch \"A\" Part VIII above/below the lumpsum price of Rs 25,378.97 as inserted by MES for Sch \"A\" Part -VIII. |
| 17 | Sch\"A\" Part-IX (MISC Items) |
| 18 | Material and labour for construction of brick masonary Valve chamber of size, 600mmx600mmx600mm(internal)suitable for housing sluice valve/gate valve etc with plain cement concrete 1:4:8 type D-2. using 40mm graded stone aggregates for foundation, 100mm thick with 150mm around offset from external face of wall, brick work in cement motor 1:6, 230mm thick, rendering 15mm thick in cement motor14. inside complete and outside 150mm below ground level, coping with plain cement concrete 1:2:4 using 20mm graded stone aggregate, type B-1, including provision of MS Sheet cover 3.15mm thick fixed to MS angle iron frame 40x40x6mm embedded in PCC(1:2:4) concrete with suitable hinges and locking arrangements, including two coats of synthetic enamel paint over a coat of red oxide primer, including necessary excavation and earth work in any type of soil etc all as specified and directed |
| 19 | Supply and fixing 15mm bore brass chromium plated 3 in 1 wall mixer model regular half turn complete all as specified and directed |
| 20 | Supply and fixing 15mm bore brass chromium plated pillar cock quarter turn type. Central hole basin mixer with pop waste system with 450mm long braided hoses complete all as specified and directed |
| 21 | Supply and fixing brass chromium plated hand shower (Health faucet) with 1 mtr long easy flex tube in chrome finish and wall hook with NRV (back flow preventer) complete all as specified and directed |
| 22 | Supply and fixing 15mm bore brass chromimum plated 3 in 1 sink mixer model regular half turn complete all as specified and directed. |