Name of Work: Lifting & cleaning of Boiler Ash Handling Season 2024-25
Sl. No.
Item Description
1
Lifting & cleaning of Boiler Ash Handling Season 2024-25
2
A. ESP Unit ash handling on daily basis for crushing season 2024-25.1. Lifting & cleaning of boiler ash from boiler furnace hoppers & its ground floor area, air pre heater hoppers & its ground floor area, E.S.P hoppers & its ground floor area & area around all ash belt conveyors, all ash screw conveyors, area around ID fans, FD fans, SA fans, surrounding area of RO water plant & feed pumps at 125 TPH boiler. 2.Loading of ash will be done directly from ash silo in tractor trolley & to be shifted outside mill premises. Quantity of Ash: 4 to 5 tons/hr appx.3.Regular cleaning of floor area of boiler, ESP & its surroundings.4. Lifting & shifting of ash from floor area of ESP & Boiler during general cleaning, shut down of boiler equipments etc.
3
B. Following jobs to be done on daily basis during crushing season 2024-25:1. Dismantling of man holes covers of 10 nos. ash hoppers of ESP & Air pre heater. 2. Cleaning of ash hoppers & fitting of manholes covers & tightening of the same. 3.Checking & cleaning of ash from discharge chute of 03 nos ash hoppers of mud drum ash hoppers.4. Cleaning of hoppers platforms, sweeping, stacking & lifting of ash from ground floor.
4
Following jobs to be done on daily basis during crushing season 2024-25:1. Cleaning of ash from structure & platforms of submerged, common & long ash belt conveyor structure & platforms etc. 2. Cleaning, sweeping& lifting of ash from Drain / pits along with submerged, common & long ash belt conveyor, ESP &up to Raw water RCC storage tank.
5
C. Wet scrubber unit ash handling on daily basis for crushing season 2024-25.1. Lifting & cleaning of boiler ash produced from wet scrubber unit & its ash pits, ash clarifiers, ash screw conveyors etc. 2. Lifting & cleaning of boiler ash from boiler furnace hoppers & its ground floor area, air pre heater hoppers & its ground floor area, E.S.P hoppers & its ground floor area & area around all ash belt conveyors, all ash screw conveyors, area around ID fans, FD fans, SA fans, surrounding area of RO water plant & feed pumps at 125 TPH boiler.3. Loading of ash will be done directly from ash silo in tractor trolley & to be shifted outside mill premises. Quantity of Ash: 4 to 5 tons/hr appx.4. Regular cleaning of floor area of boiler, ESP & its surroundings, wet scrubber & its surroundings.5. Lifting & shifting of ash from floor area of ESP & Boiler during general cleaning, shut down of boiler equipments etc.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.