Supply Of Materials For Construction Of Kitchen Room Near Kannada And Marati School At Khanagaon K.H Village In Belagavi Taluk - Lumpsum Material,Transportation Loading And Unloading At 1% On Material,,Tools And Plants At 2% Of Material,Hom Of Cutting And Grinding Machine.,,Hom Of Welding And Grinding Machine.,,Mechanic Class Ii / Mechanic Hmp Grade I/Eme Grade,Anticorrosive Bitumastic Paint01,A 12X12 M.S Square Rod,A 20Mmx20mm Vertical M.S Square Rod,A 50Mm Dia Ms Hollow Pipe B Class 14 Guage,Plate Vibrator Having 3 Ton Compaction Force.,,Cobble Stones Of 75Mm Thick,,Paver Finisher Mechanical 100 Tph Capacity.,A 6Mm And Below Aggreages,Caseii - Unsurfaced Gravelled Road (Add 10 % Of Cost Of Carriage To Cover Cost Of Loading And Unloading),Tipper 5 Cum Capacity,.,Generator 100 Kva,.,Wet Mix Plant (Pug Mill),.,Grit / Stone Dust01,Fine Aggregate/Crushed Sand 2.36Mm - 75 Micron At 30,Fine Ggregates 10Mm,Coarse Aggreages 12 Mm,.,,Granite Metal 20 Mm.,,Granite Metal 40 Mm.,,Vibratory Roller 8 Tonne,.,Water Tanker,,Motor Grader 3.35 Meter Blade.,,Wheeled Dozer (D50 Beml),.,Gravel 2.36Mm/Murrum,.,Water.,.,Tractor - 40 Hp.,,Laboratory Asst. (Sslc Passed)/Mate/Supervisor,,Polyenthylene Pipes High Density 25Mm External Dia,Add 5% For Fitting And Wastage Charges,Add Cement Sand And Grit 1% On Material.,Handling Loading And Unloading 3% On Material-02,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material-02,Polyenthylene Water Storage Tank Of Specified Capacity L-02,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Material-02,Licenced Plumber With Tools-02,Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)-02,C.I. / M.S. Brackets For Flushing Cistern-02,Brass Stop Cock-02,Cp Brass Waste 32 Mm Of Standard Pattern-02,Cp Brass Chain With Plug-02,Copper Plated Brass Piller Tap 15Mm.,.,White Vitreous China Clay Flat Back Wash Basin Size 630 X 450Mm,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Plastic Emulsion Paint.,Primer.,Add Brush, Putty, Sand Paper, Roller At 1% On Cost Of Paint.,Water Proofing Cement Paint,.,Add Hom Of Welding And Grinding Machine At 2% On Material,Fabricator_.,Add 15% Wastage For Glass,.,A 5.50 Mm Thick Plain Glass,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading.,,Nylon Rollers.,.,Aluminium Window Frame Section 1.20 Mm Thick.,.,Add Brush At 1% On Cost Of Paint.,.,Enamel Metal Paint.,,Painter Class I.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Hom Of Welding And Grinding Machine At 4% On Materi,Welder Grade I,,Fitter Class 1,Ms Flat,.,M.S Rods,,Prepolished Grey /Multy Red / Ruby Red / Black /Hassan Green Granite 20Mm Thick,Plaster Of Paris.,,White Cement,,Plastic Sheet,,Add Water Supply & Electrical Charges,,Add For Small Tools And Plants At 1%,Mason Class Ii (With Tools).,.,Red Oxide.,Broken Granite Metal 10 Mm.,,Broken Granite Metal 12.5 Mm01,Mathi/Nandi Wood Scantling,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Hom Of Machinaries For Planing,.,Carpenter Assistant.,,Add Cutting And Other Wastage 5%,,Teak Wood.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Mason Class I (With Tools).,.,,Add Sundries Charges At, 2 % On Material,Add Handling Loading And Unloading At 1% On Material.,,Casurina Poles 100 - 150 Mm.,,Mixer (Concrete Small Used In Culvert.),Burnt Bricks Class 35 (Non Modular).,,Add Watering Charges At 1 % On Labour.,,Add Sundries Charges At 1 % On Labour.,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,,Over Head, & Other Miscellaneous Charges,Add Sundries Charges At, 1 % On Material.