}

Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spec. Tender Er Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submitted Bid., kapurthala-Punjab

Government Departments has published Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spec. Tender Er Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submitted Bid.. Submission Date for this Tender is 23-09-2024. Raw Materials Processing Machinery Tenders in kapurthala Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

44929487
Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spec. Tender Er Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submitted Bid.
Open Tender
Indian
Punjab
Kapurthala
23-09-2024

Tender Documents

Tender Details

Supply Of Cnc Milling Machinecnc Milling Machine,Cost Of The Concomitant Accessories According To Clause No. 4.2 (4.2.1 To 4.2.14) Of Spec. Tender Er Are Required To Attach The Price Break-Up Of These Accessories In Pdf File Along With Submitted Bid. ] Dy. Chief Mech. Punjab 1.00 Set , Cnc Milling Machine As Per Spec No. Mech/M&P/3700/5 Rev-Nil Alongwith Preventive Mainte Nance During Warranty Period As Per Clause No. 16.3 & 16.7 Of Spec. ] , Camc (Comprehensive Annual Maintenance Contract) For 5 Years After Completion Of Warranty P Eriod. The Tenderer Shall Quote Year Wise Camc Cost For As Period Of 05 Years As Per Spec. The General Conditi Ons Of Camc Are Appended With This Tender. [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Disco Unting: 10 % ] ] Dy. Chief Mech. Punjab 1.00 Numbers At (Location) Engineer/Mfg, Rcf 4 3635N092 Essential Non Stock --- Yes Consignee Inr (Grp01) Spares (Y) Cost Of Any Other Accessory Which In The Opintion Of Supplier Is Essentially Required For Making The Machine Fully Functional As Per Clause No. 5.1 (Iii) Of Spec. Tenderer Are Required To Attach The Price Break-Up Of Th Ese Accessories In Pdf File Along With Submitted Bid. ] Dy. Chief Mech. Punjab 1.00 Set Consignee Engineer/Mfg, Rcf 5 4635N093 Essential Non Stock --- Yes Consignee Inr (Grp01) Services (Y) Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Etc. ] Dy. Chief Mech. Punjab 1.00 Set At (Location) Engineer/Mfg, Rcf 6 5635N094 Optional Non Stock --- No Consignee Inr (Grp01) Spares (Y) Optional Accessories Will Be Quoted By The Tenderer With Breakup Of Individual Items As Specified As Per Clause No. 4.3 (4.3.1 To 4.3.3) Of Section-I. Tenderer Are Required To Attach The Price Break Up Of These Access Ories In Pdf File Along With Submitted Bid. ] Dy. Chief Mech. Punjab 1.00 Set Consignee Engineer/Mfg, Rcf 7 6635N094 Optional Non Stock --- No Consignee Inr (Grp01) Spares (Y) Optional Consumables: Defined At Clause No. 6 (6.1& 6.2) Of Section-Ii O

Key Value

Document Fees
Refer document
EMD
INR 541720.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Notice 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail