|
| 1 | Supply, Configuration, Testing, Calibration & Operationalization (excluding physical installation) of Smart Metersalong with meter box,TTBs, requisite number of polycarbonate seals, all fixing/mounting accessories for 1-Ph, 3-Ph, LTCT and HT consumers, DTs, Feeders and Boundary meters, [to be delivered at five locations of KSEBL TMRs, including Transportation & Insurance, Unloading etc.,] inclusive of 7 years OEM warranty (from date of commissioning) . |
| 2 | 1 phase whole current Smart Meter (with Net-Metering) LT Meter : 5 – 30 A with polycarbonate/SMC weather proof outdoor type meter cover box . Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 3 | 3 phase whole current Smart Meter (with Net-Metering) LT Meter: 10 – 60 A with polycarbonate/SMC weather proof outdoor type meter cover box. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 4 | 3 phase whole current Smart Meter (with Net-Metering) LT Meter: 10 / 20 – 100 A with polycarbonate/SMC weather proof outdoor type meter cover box. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 5 | 3 phase LT-CT operated Smart Meter (with Net-Metering) -/5A, Accuracy class 0.5S, LT Meter with CTs, control cables etc. (Exl. Meter Box) |
| 6 | 3 phase CT/PT operated Smart Meter (with Net-Metering) – HT Meter --/5A/1Aof Accuracy class 0.2Swith control cables (Exl. Meter Box and DI) |
| 7 | 3 phase LT-CT operated Smart Meter – DT Meter(with Net-Metering)-/5A, Accuracy class 0.5S, CTs, control cables etc. (Exl.Meter Box & DI) |
| 8 | 3 phase CT/PT operated Smart Meter – Feeder Meter -/5A /1Aof Accuracy class 0.5S, control cables etc. (Exl. Meter Box & DI) |
| 9 | 3 phase CT/PT operated Smart Meter – Boundary Meter with net metering -/5A /1Aof Accuracy class 0.5Swith Net metering, control cables etc. (Exl. Meter Box & DI) |
| 10 | SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box for 3 phase LT-CT operated Smart Meter (with Net-Metering and prepaid functionality) -/5A, Accuracy class 0.5S, LT Meter with CT. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 11 | SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box -3 phase LT-CT operated Smart Meter – DT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 12 | Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 13 | Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box. |
| 14 | Communication Network Infrastructure & Connectivity for the project area, including Supply of all hardware equipment (SIM cards/DCU/Gateways etc.) and integrated software components/ associated accessories required for the successful establishment and operation of communication network inclusive of 7 years OEM warranty (from date of commissioning). |
| 15 | Planning, Supply, Setup, testing and commissioning of RF Communication Network Infrastructure & Connectivity consisting of DCU/Gateways etc. (inclusive of 7 years OEM warranty) as required for the successful establishment of connectivity for all Smart Meters feasible as per design proposed by bidder, terminated at the AMI-DC collocated at KSEBL DC, and also at the AMI-DC at KSEBL DRC. |
| 16 | Head End System software (HES),NMS and other softwares |
| 17 | Supply, installation, integration, testing and commissioning of HES, NMS and other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DC |
| 18 | Supply, installation, integration, testing and commissioning of HES ,NMS, other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DRC |
| 19 | Configuration, customization, business process/ systems integration with MDMS and any other Utility Applications, Ticketing tool, Consumer Portal,development of Analytics Reports, SLA dashboard etc. as necessary for successful operation of this project |
| 20 | Design, Development & deployment of allied IT applications as required by KSEBL for performance monitoring & execution of entire project. 1. Meter & SIM inventory Management2. Smart Meter Installation & Consumer Indexing3. SLA monitoring tool |
| 21 | Connectivity Charges(GPRS/LTE/4G/5G/NBIoT) Connectivity Charges (actuals, on pro-rata basis) for the project periodof 72 months |
| 22 | Interim FMS(for the period from commissioningfor a set of meters to Enterprise wide go live ) for the maximum of 18 months |
| 23 | Operation and Maintenance charges * |
| 24 | Facility Management Services (FMS) |
| 25 | Smart Meter, HES & Communication Network Operations & Reporting at NOMC including Manpower |
| 26 | – Year 1 |
| 27 | – Year 2 |
| 28 | – Year 3 |
| 29 | –Year 4 |
| 30 | –Year 5 |
| 31 | –Year 6 |
| 32 | Field Operations - Smart Metering & communication infrastructure Technical Support & Network Infrastructure Operation & Maintenance, including Manpower. |
| 33 | – Year 1 |
| 34 | – Year 2 |
| 35 | – Year 3 |
| 36 | –Year 4 |
| 37 | –Year 5 |
| 38 | –Year 6 |
| 39 | Annual Technical Support (ATS) for a period of 6 years after completion of warranty of one year |
| 40 | from OEM – for HES |
| 41 | – Year 1 |
| 42 | – Year 2 |
| 43 | – Year 3 |
| 44 | –Year 4 |
| 45 | –Year 5 |
| 46 | –Year 6 |
| 47 | for all other related applications software. |
| 48 | – Year 1 |
| 49 | – Year 2 |
| 50 | – Year 3 |
| 51 | –Year 4 |
| 52 | –Year 5 |
| 53 | –Year 6 |