Bids Are Invited For Custom Bid For Services - Providing Services of Engineering, Preparation of Estimates, Technical Specifications, Preparation of drawing, BOM Etc. Clarification at site during execution for Engineering Service Department, Paradip Refinery, IOCL. Process modification Schemes/ Mechanical engineering related job: The Scope of Work shall broadly consist of but not limited to the following: (i) Party to carry out detail engineering & with compliance of MOC (management of change) procedure of IOCL for all Process related Schemes, Development and Infrastructure related jobs as per direction of EIC (Engineer-In-Charge) (ii) Deputed agency personnel must be experienced in carrying out detail engineering & be conversant with engineering software such as AutoCAD, Autodesk, AutoCAD advance steel, PDS/SP3D, PDMS/E3D, CAESAR-II and TANK engineering software. (iii) Carryout out site visit, identify and select appropriate location for new eqpt to be installed at site as per the process scheme complying with OISD norms, selecting appropriate routes for new piping including structural supports, platform, Stair case, ladders, etc. Taking all physical measurements at site, etc. as per direction of EIC. (iv) Referring to various engineering documents relevant to the process modification Scheme available with IOCL as per direction of EIC. (v) Preparation of detail engineering drawing with all details including BOM (Bill of material), complying all relevant codes and standards as per the process modification scheme, ensuring inclusion of comments of various depts as instructed & guided by EIC. (vi) Submission of engineering drawing with BOM to EIC within 15 days from the date of receipt of the Process modification scheme or as per instruction of EIC. (vii) Incorporating changes in the Engineering Drawing as per site conditions as and when required during execution stage (execution is not in the scope of the Vendor) as per direction of EIC. (ix) Preparation of As-built Drawing, up-dation of existing GA drawing, etc., after completion of execution of the process scheme as per direction of EIC. (x) Minimum Deployment of One (01) Mechanical Engineer, Four (04) Mechanical Draftsmen. Process modification Schemes / Civil Infrastructural development schemes: The Scope of Work shall broadly consist of but not limited to the following (i) Party to carry out detail engineering & with compliance of MOC (management of change) procedure for all Process related Schemes, Development and Infrastructure related jobs of IOCL as per direction of EIC. (ii) Deputed personnel must be experienced in carrying out detail engineering & be conversant with engineering software such as AutoCAD, STAAD Engineering software, AutoPLANT, Autodesk, AutoCAD advance steel, Auto Desk Architectural Engineering, PDS/SP3D, PDMS/E3D to deliver the job. Page 15 of 58 (iii) Carryout out site visit, Identifying and select appropriate location for buildings, structures, EQUIPMENTS, facilities at site as per the scheme complying with OISD norms, statutory requirements, BIS norms, user requirement, taking all physical measurements at site, etc. as per direction of EIC. (iv) Referring to various engineering documents relevant to the Scheme available with IOCL as per instruction of EIC. (v) Preparation of Detail estimate with detail BOQ as per relevant IOCL SOR as instructed & guided by EIC. (vi) Design of buildings/ structures/ facilities as per Relevant BIS standards and using software including STAAD, available with IOCL as per direction of EIC. (vii) Preparation of detail engineering drawing with all details including BOM, complying all relevant codes and standards as per the infrastructure scheme, ensuring inclusion of comments of various depts. as per direction of EIC. (viiii) Submission of Engineering drawing with BOM to EIC within 15 days from the date of receipt of the scheme or as per instruction of EIC. (x) Incorporating changes in the Engineering Drawing as per site conditions as and when required during execution stage (execution is not in the scope of the Vendor) as per direction of EIC. (xi) Preparation of As-built Drawing, up-dation of drawing, etc., after completion of execution of the scheme (X) Minimum Deployment of One (01) Civil engineer & Three (03) Civil draftsmen at site. Process modification Schemes /Electrical & Instrumentation related job: The Scope of Work shall broadly consist of but not limited to the following (i) Party to carry out detail engineering & with compliance of MOC (management of change) procedure for all Process related Schemes, Development and Infrastructure related jobs of IOCL as per direction of EIC. (ii) Deputed personnel must be experienced in carrying out detail engineering & should be conversant with engineering software such as AutoCAD, Auto plant, Autodesk, AutoCaD Electrical , Auto Cad P&ID, PDS/SP3D, PDMS/E3D Engineering software to deliver the job. (iii) Carryout out site visit, Identifying and selecting appropriate location for new equipment to be installed at site as per the process scheme complying with OISD norms, IS standards, Gas groups & selecting appropriate routes for new cable including detail engineering for new trench route, cable tray extension, Road cutting, Instrument fitting, transducers & transmitters, Structural job, relocation of existing fittings/ equipment/ structure etc. Taking all physical measurements at site, etc. as per direction of EIC. (iv) Referring to various engineering documents relevant to the process modification Scheme available with IOCL as per instruction of EIC. (vi) Preparation of detail engineering drawing with all details including BOM, complying all relevant codes and standards as per the process modification scheme, ensuring inclusion of comments of various depts. as instructed & guided by EIC. (vii) Submission of engineering drawing with BOM to EIC within 15 days from the date of receipt of the Process modification scheme or as per instruction of EIC. (ix) Physical Identification of available material against BOM at IOCL Stores (x) Incorporating changes in the Engineering Drawing as per site conditions as and when required during execution stage (execution is not in the scope of the Vendor) as per instruction of EIC. Page 16 of 58 (xi) Preparation of As-built Drawing, up-dation of drawing, etc., after completion of execution of the process scheme as per instruction of EIC. (X) Minimum Deployment of One (01) Electrical draftsman at site. In addition to above Mechanical, Civil & Electrical Engineers & Draftsman, one (01) additional dedicated draftsman is to be deputed for upgradation of P&ID drawings, Plot plans, GA drawings etc. Total Quantity :