Tender For De Bay Re-Vamping 27021176 10 10 10 FAB & ERECTION OF STRUCTURE 110 TON 20 STRUCTURE FABRICATION WORK 110 TON 30 Structural Dismantling 70 TO 40 DISMANTL OF ROOF WATER DRAINAGE GUTTER 215 M 50 STRUCTURE FABRICATION WORK 10 TON 60 LOADING & UNLOADING CHARGES 161 TO 70 DISMANTLING OF SHEETS 15,000 M2 80 FIXING OF SHEETS 13,000 M2 90 Miscellaneous FRP Lining jobs 450 NO 100 MATERIAL LOADING/UNLOADING/SHIFTING 80 TO 110 PAINTING JOB AS PER SOW 1 LO Email : GURUVEER.SINGH@AMNS.IN Contact : Name : Guruveer Singh Item Details : Scope of Work Service Code Service Description Qty Unit UnitPrice SOW 3018648 FAB <(>&<)> ERECTION OF STRUCTURE 110 TON 35,000.00 SOW for Structure erection: - 1) Received prefabricated materials qty must be verified at site as per drawing provided by AM/NS team. 2) Existing structure preparation to be done for additional member erection. 3)Erection work consist of railing erection, purlins, sag rod, <(>&<)> all related structural member. 4) Suitable Cranes, Man lifter, Farana, any Erection Equipment. Crane/boom lift should be suitable to carry out all erection work. 5) Making of Suitable Bed for Controlled Assembling of Portal, Columns, Bracings Wherever Required. Dismantling the bed and loading/unloading at given area or as per instruction of AMNS engineer if required. 6) All Machines, Equipment’s, <(>&<)> Tackles including Jacks (Manual <(>&<)> Hydraulic). Third party/ govt approved agency test certificate required for machinery/ tools <(>&<)> tackles/ equipment. 7) Calibration Certificate by third party/govt approved agency of all Machineries used by Contractor. 8) Internal Shifting of materials may please be considered minimum of 3 times after 1st unloading for making front to work. No extra claims shall be entertained. 9) Thorough cleaning of Structures to wipe of dust /muds etc. before erections shall be in scope of vendor. Touch up paints /full repainting of 1 coat if required shall be in scope of Vendor. Vendor Should made appropriate arrangement for Paint materials and manpower for the same at site. 10) Welding Consumables of Approved Manufacturer. 11) Consumables Welding rod, Grinding Wheel, Cutting Wheel, Buffing Wheel, Drill Bit/ Core Cutter, DA, Oxygen etc. 12) Spares for Machineries, Tools, and Tackles. 13) Calibrated Measuring Instruments required for Dimensional Checking. 14) Manpower should be as per Project Requirement to meet the Timeline. 15) Site In charge, Safety In charge, Erection Foreman <(>&<)> Planning Engineer to expedite Progress. 16) QC Engineer, Safety Personal (Certified by AMNS QC Team). 17) Adequate Skilled Manpower for Assembling Work as per Project requirement. 18) QC Checking <(>&<)> Offer for AMNS Inspection in Prescribed Format. 19) Daily Progress Report in Approved format by AM/NS. 20) Labor License, Compliance of statutory requirements as per Govt. norms <(>&<)> AMNS policies, PF/ESIC/Insurance Requirements. 21) Processing of Gate Pass <(>&<)> Other Formalities. 22) Monthly Materials Reconciliation Report. 23) Worker accommodation. 24) Transportation of workers to Worksite. 25) Housekeeping at Worksite daily - Area Cleaning after work completion and during site evacuation. 26) PPEs for Workers, Supervisors engaged. 27) Surveyor with Total Stations for Alignment of Structures and offering for inspections. 28) Safety Apparatus like Flashback Arrester, Dial Gauge, Conduit Pipes Flexible Wires, DB with Proper Rating ELCB/RCCB. 29) Providing Lifeline, Full body Harness with double lanyard, safety/florescent jacket, Fall Arrester, Safety Net, Ladder wherever required. 30) Turn Buckles, Jacks of required Capacity. 31) Anywhere for whatsoever reasons due to unavailability of access for man lifters, Scaffolding shall be in scope of vendor at it must be as Page 2 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details per AM/NS FPS standard. Scaffolding should be tested by a Certified Scaffolding inspector. Arranging scaffolding inspector shall be in scope of vendor. We encourage not using scaffolding. 32) Fixing of Mounting Bolts for Assembly wherever required. 33) Any Touch Paint required before erection /Post Erection Shall be in scope of Vendor. 34) All Erection Methodologies /Method Statements shall be made by Contractor and Shall be put for Approval before AM/NS. 35) All Equipment Aging shall be as per SOP. 36) Tolerances in Structural Erection Shall be according to IS 12843 (Latest Revision) . 37) Vendors Should follow Safety in Structural Erection as per IS 7205. 38) Vendor is liable to Complete their scope of Work within the battery limits of height and operating radius of Cranes. 39) Vendor shall made appropriate arrangement of any structural erections by conventional methods, by using chain blocks, manual lif ting, using scaffolding etc. in case work is not accessible by Cranes, man lifter etc. However, lifting plans must be approved by AM/NS Execution and Safety Team Pipeline Erection <(>&<)> Installation as per drawing with required Frame for E columns: - VENDOR SCOPE – 1) Downfall pipe, Header pipe, Pipe Supports <(>&<)> gutter erection work needs to be done at DE Bay E side column. As per drawing no 206643C250DFD53H002 2) Before starting the work material to verify at site as per drawing no 206643C250DFD53H002 3) All the members as given in Drawing no 206643C250DFD53H002 erection to be done as per detail given in Drawing. 4) Gutter area roof sheet to be removed and re-fixing to be done after gutter erection. 5) Self-drilling Screw with leak proof rubber washer of approved make for sheet fixing will be in vendor scope. 6) Water leakage will be checked by TPI/AMNS team after the work is completed. 7) Material handling and erection equipment will be in vendor scope. 8) One coat of primer <(>&<)> 2 coats of epoxy paint RAL (RAL 5003 Saphire blue) code will be provided by AM/NS team. 9) Material Reconciliation statement to be submitted with RA bills. 10) W.C. Policy must be taken before starting the job. 11) All safety norms to be followed as per AMNS FPS like – Saftey Helmet/Shoes/Reflective Jacket/full body harness with double lanyard etc. 12) Compliance of statutory requirements as per TN Govt. (Labor License Etc.) 13) Manpower must be fully vaccinated. 14) No Scaffolding or vertical ladder is allowed to work. 15) During work on roof top safety net along with HDPE construction net must be installed at bottom as per AM/NS FPS standard 16) Temporary lifeline required to work on roof top must be as per AM/NS FPS standard. 17) Manlift <(>&<)> mobile crane required to complete the work will be in vendors scope, it should be in healthy condition <(>&<)> all required document as per AM/NS FPS standard need to be submit and same will be verified by AM/NS safety <(>&<)> security team. 18) Manlift <(>&<)> Mobile crane operator must have required license, training to operate the same. 19) All manpower must need to provide medical <(>&<)> physical fitness certificate and same will be verified by AM/NS safety <(>&<)> security team. Pipeline Erection <(>&<)> Installation as per drawing for D columns: - VENDOR SCOPE – Page 3 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 1) For working at roof safety procedure <(>&<)> HIRA to be follow. 2) New fabricated gutter <(>&<)> pipeline erection in same position and <(>&<)> its inter-connection to be done as per drawings. 3) Self-drilling Screw with leak proof rubber washer with approved make for sheet fixing will be in vendor scope. 4) Material handling and erection equipment will be in vendor scope. 5) One coat of primer <(>&<)> 2 coats of epoxy paint RAL code (5003 Sapphire blue) . 6) Material Reconciliation statement to be submit with RA bills. 7) Water leakage will be checked by TPI/AMNS team after the work is completed. 8) WC Policy must be taken before to start the job. 9) All safety norms to be followed as per AMNS like – Safter Helmet/Shoes/Jacket/full body harness with double lanyard etc. 10) Compliance of statutory requirements as per TN Govt. (Labor License Etc.) 11) Manpower must be fully vaccinated. 12) No Scaffolding is allowed, or vertical ladder is allowed to work. 13) During work on roof top safety net with HDPE construction net must be installed at bottom. 14) Manlift <(>&<)> mobile crane required to complete the work will be in vendors scope, it should be in healthy condition <(>&<)> all required document as per AM/NS FPS standard need to be submit and same will be verified by AM/NS safety <(>&<)> security team. 15) Manlift <(>&<)> Mobile crane operator must have required license, training to operate the same. 16) All manpower must need to provide medical <(>&<)> physical fitness certificate and same will be verified by AM/NS safety <(>&<)> security team. Gutter erection as per SOW for E bay <(>&<)> D Bay Fabrication <(>&<)> erection of roof gutters should be as per drawings given by AM/NS team, all the welding standards, material, angle channels must be installed as per drawings as per drawing, given in pipe drawings. all tolerance <(>&<)> levelling compliance as per drawing. 3018613 STRUCTURE FABRICATION WORK 110 TON 105,000.00 SOW for supply <(>&<)> fabrication of pre-Fabricated MS material as per drawings All the required structural members, Railings, purlins, supports, sag rods, pipes, pipeline supports, stiffeners, other required member need to be fabricated at vendors facility and shifting to be done after pre-fabrication, all structural members should be as per drawing. All prefabricated members must have member no written on it as per drawing shared by AM/NS team for easy identification during erection work, material must be painted, 1 coat primer <(>&<)> 2 coat epoxy paint RAL code will be shared by AM/NS team coating micron will be 225 microns (Primer+ 2 final coat). RAL code will be shared by AM/NS team for all the materials Painting SOW:- SURFACE PREPARATION: Page 4 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Remove grease, oil and other contaminants using suitable degreasing solvent. Remove all rust and scale by grit/shot blasting to a minimum standard of Sa 2 ½, Swedish standard SIS 05 5900 with a surface profile not exceeding 50 microns. Remove all dust and loose particles by vacuum cleaning or by jet of dry compressed air. PRIMER COAT: One coat of epoxy zinc rich Primer Application: With conventional airless spray, brush for small areas. Overcoating Interval: Minimum-overnight, Maximum-Dependent on conditions. The primer coat should be fully cured and free residual so lvent before over coating is carried out. D.F.T: 50 microns The first primer coat should apply within 4-6 hours after shot blasting. INTERMEDIATE COAT: An epoxy coating reinforced with micaceous iron oxide (MIO) for steel surfaces with suitable abrasion resistance and water impermeability. Composition: Catalyzed epoxy resin pigmented with MIO, Color: Brown, finish: Matt. D.F.T: 100 microns. FINISH COAT: Top two coats of Polyurethane compatible to primer <(>&<)> intermediate coats with good adhesion and water resistance for application on steel surfaces Composition: Catalyzed epoxy resin suitably pigmented. D.F.T: 75 microns. Total thickness of paint should be a minimum of 225 microns 3005492 Structural Dismantling 70 TO 1,000.00 DE bay old Structural member dismantling as per SOW <(>&<)> lean shed old structure <(>&<)> lean shed dismantle <(>&<)> pipeline dismantle of D column 1) The Lean shed adjacent to DE bay needs to be dismantled. 2) PPGI sheets need to be removed and stacked properly on the ground floor at a place instructed by AM/NS team inside the plant boundary. 3) All MS members of the PEB structure of lean shed need to be dismantled and to be shifted at place inside the plant boundary as in structed by AM/NS team. 4) The lean shed part MS Frame part which was welded on DE bay E side column must be removed properly and surface must be prepared in such a way that other additional member which need to erect can be done easily. 5) Removed MS angle, channels, sections must be cut into size of 400-600mm as instructed by AM/NS Team 3019537 DISMANTL OF ROOF WATER DRAINAGE GUTTER 215 M 500 Gutter Dismantling For D column Existing gutter dismantling including manpower machinery– 215 mtr. Shifting of dismantled material at required place inside plant boundary as informed by AM/NS team. Gutter area roof sheet to be removed and re-fixing to be done after gutter erection. For working at roof safety procedure <(>&<)> HIRA to be follow. Self-drilling Screw with leak proof rubber washer with approved make for sheet fixing will be in vendor scope. Material handling and erection equipment will be in vendor scope. Water leakage will be checked by TPI/AMNS team after the work is completed. WC Policy must be taken before to start the job. All safety norms to be followed as per AMNS like – Safter Helmet/Shoes/Jacket/full body harness with double lanyard etc. Compliance of statutory requirements as per TN Govt. (Labor License Etc.) Manpower must be fully vaccinated. No Scaffolding is allowed, or vertical ladder is allowed to work. During work on roof top safety net with HDPE construction net must be installed at bottom. Page 5 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Manlift <(>&<)> mobile crane required to complete the work will be in vendors scope, it should be in healthy condition <(>&<)> all required document as per AM/NS FPS standard need to be submit and same will be verified by AM/NS safety <(>&<)> security team. Manlift <(>&<)> Mobile crane operator must have required license, training to operate the same. All manpower must need to provide medical <(>&<)> physical fitness certificate and same will be verified by AM/NS safety <(>&<)> security team. 3018613 STRUCTURE FABRICATION WORK 10 TON 20,000.00 Minor fabrication work in column like do drilling, stiffener welding <(>&<)> pipe joint welding, the rectification of dismantled structure for reuse etc. at any elevation as instruction by AM/NS team 3011668 LOADING <(>&<)> UNLOADING CHARGES 161 TO 500 All the material needs to be unloaded on time informed by AMNS team. Material needs to be unloaded at desired location inside plant as per directed by AM/NS Team. Vendor must bring Farana 15/17 ton based on materials to be unloaded There should be no delay due to unavailability of Farana in material unloading activities Unloading of Prefab Steel Structures <(>&<)> Proper Stacking with wooden packing at Erection Site or Storage yard as per AM/NS instructions. Loading on Trailor, shifting of structures from Laydown area to Erection Site Shall be in scope of vendor. All required equipment for unloading, loading shifting /re shifting /Any material shifting for providing piling /civil front shall be in scope of vendor. Internal Shifting of materials may please be considered minimum of 3 times after 1st unloading. No extra claims shall be entertained. 3002313 DISMANTLING OF SHEETS 15,000.00 M2 100 1) Dismantling of half of the CD bay existing Roof sheeting from center towards D column <(>&<)> DE Bay existing roof sheeting dismantling (both PPGI <(>&<)> FRP transparent sheet including Center Ridge sheet to be dismantled gable end corner flashing, etc) Area CD bay-(14 mtr x 200 mtr) Area DE bay-(30 mtr x 200 mtr). (This include all roofing members like sheets, side wall, gable wall, corner flashing center ridge etc.) 4) Dismantled sheets to be stacked properly on roof top and not more than 20-22 sheets can be stacked at single place on roof top. 6) New Sheet to be placed on required place on roof PEB structure <(>&<)> fixing to be done. 7) HIRA must be taken into consideration before starting the job <(>&<)> continuous safety supervision to be done by vendors <(>&<)> same will be verified by nominated person from AM/NS team. 12) Only man lifter is allowed for manpower to ascend to top <(>&<)> they must approach through designated roof entry point <(>&<)> Safety net overlapped with HDPE Construction net must be fixed at a place above which work is planned. The safety net must be as per AM/NS FPS standard. 13) Mobile Crane and Man lift must be in healthy condition <(>&<)> all the vendors have to ensure all required document must be there as per AM/NS FPS standard. And the same will be verified by security <(>&<)> safety. 14) Manlift <(>&<)> crane operator must be required license, certified <(>&<)> trained to operate the same. 15) All required tools <(>&<)> tackles, lifting equipment, lifting belt, lifting jigs is in vendors scope and must have TPI inspection certificate same can be verified by AM/NS Safety team Page 6 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 16) All work at height safety measures, Full body harness with double lanyard, lifeline, safety fall protection net etc will be in vendors’ scope. 17) All removed sheets must be stacked properly inside plant boundary at a place directed by AM/NS team. 18) All the jobs must be done under the supervision of the site Engineer <(>&<)> supervisor. 19) Temporary lifeline to be used for height work must be as per AM/NS FPS standard. 3003052 FIXING OF SHEETS 13,000.00 M2 250 1) Fixing of half of the CD bay existing Roof sheeting from center towards D column <(>&<)> DE Bay existing roof sheeting dismantling (both PPGI <(>&<)> FRP transparent sheet including Center Ridge sheet to be dismantled) Area CD bay-(14 mtr x 200 mtr) Area DE bay-(30 mtr x 200 mtr). (This include all roofing material like center ridge, corner flashing, gable wall, side wall etc) 2) Sheet replacement to be done as per plant existing pattern. 3) Turbo Ventilators to be fixed along with sheet at equal intervals of approximately 10 mtr. 5) Limited roof sheet which is planned to be changed on particular day must be shifted to roof top <(>&<)> all the sheets must be taken down each day after work completion <(>&<)> no material to be kept at top of roof every EOD. 6) New Sheet to be placed on required place on roof PEB structure <(>&<)> fixing to be done. 7) HIRA must be taken into consideration before starting the job <(>&<)> continuous safety supervision to be done by vendors <(>&<)> same will be verified by nominated person from AM/NS team. 8) For Roof, cladding, ridge <(>&<)> corner flashing Fixing work Screw/bolts will be in contractor`s scope. 9) Self drilling screw with EPDM washer one no per 300mm spacing each in direction along the shed and as per available purlins across the shed. Self-drilling 11) Fasteners must be provided with MTC passed in salt Test. and of approved make by AM/NS team 12) Only man lifter is allowed for manpower to ascend to top <(>&<)> they must approach through designated roof entry point <(>&<)> Safety net overlapped with HDPE Construction net must be fixed at a place above which work is planned. The safety net must be as per AM/NS FPS standard. 13) Mobile Crane and Man lift must be in healthy condition <(>&<)> all the vendors have to ensure all required document must be there as per AM/NS FPS standard. And the same will be verified by security <(>&<)> safety. 14) Manlift <(>&<)> crane operator must be required license, certified <(>&<)> trained to operate the same. 15) All required tools <(>&<)> tackles, lifting equipment, lifting belt, lifting jigs is in vendors scope and must have TPI inspection certificate same can be verified by AM/NS Safety team 16) All work at height safety measures, Full body harness with double lanyard, lifeline, safety fall protection net etc will be in vendors’ scope. 17) All removed sheets must be stacked properly inside plant boundary at a place directed by AM/NS team. 18) All the jobs must be done under the supervision of the site Engineer <(>&<)> supervisor. 19) Temporary lifeline to be used for height work must be as per AM/NS FPS standard. 3010901 Miscellaneous FRP Lining jobs 450 NO 1,800.00 All the gutter Page 7 of 7 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd (CHN) Plot No A6, SIPCOT Industrial Growth Center,Sriperambathur Taluk, Dist Kancheepuram,602105,Tamil Nadu,India GSTIN 33AAACE1741P1ZO PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118727 Date 14.08.2024 Submission Date 25.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Samarjeet Ghosh Contact Email SAMARJEET.GHOSH@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details cleaning to be done <(>&<)> FRP work to be done of thickness 3mm, Roof sheet rainwater gutter size 840mm width. FRP ISO Phthalic resin. FRP coating 3mm thickness including materials, cleaning work and 3017733 MATERIAL LOADING/UNLOADING/SHIFTING 80 TO 1,000.00 1) All the material kept in lean shed need to be shifted to other place inside plant boundary as instructed by AM/NS Team 2) Mobile Crane (Farana 17 MT) required to complete this job will be in vendor’s scope. 3) All the lifting equipment, tools <(>&<)> tackles required to complete the job will be in vendor’s scope. 4) Vendors must bring competent riggers to shift materials. 5) Mobile cranes must be in healthy condition and all required documents need to be as per AM/NS FPS standard <(>&<)> same will be verified by safety <(>&<)> security team. 6) The crane operator must have the required license, <(>&<)> undergone training to operate Mobile crane. 3017855 PAINTING JOB AS PER SOW 1 LO 3,500,000.00 Re-Painting of structure 1 coat primer <(>&<)> 3 finish coat total DFT 350 Micron